[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-163216-105":53,"doc-detail-163216-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","wsdot-spcc-plan-template","WSDOT SPCC Plan Template","","WSDOT draft SPCC Plan template for contractors to develop Spill Prevention, Control and Countermeasures (SPCC) Plans that meet WSDOT Standard Specification 1-07.15(1) and NPDES requirements. It defines plan purpose, scope, and implementation expectations, including responsibilities, active contact information, spill reporting, training, prevention and response procedures, flowchart use, site/project details, mapping requirements, approval steps, and required acknowledgement and example forms for consistent compliance.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/wsdot-spcc-plan-template/163216/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/wsdot-spcc-plan-template/163216.png","ImageObject",442,249,{"name":88,"@type":89},"Margaret","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-03","2026-08-31",true,{"@type":98,"interactionType":99,"userInteractionCount":47},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What is the purpose of the WSDOT SPCC Plan in this template?","Question",{"text":108,"@type":109},"The SPCC Plan protects human health and the environment from spills and releases of hazardous materials. It also addresses fire-code conditions that may apply under Section 3406 as approved by the local Fire Marshal.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"Who is responsible for implementing and updating the SPCC Plan?",{"text":113,"@type":109},"The Prime Contractor maintains and updates the SPCC Plan throughout the project and ensures full implementation at all times. Table 1.1 is used to list responsible personnel and active contact information, including subcontractor contacts if spill response subcontractors are used.",{"name":115,"@type":106,"acceptedAnswer":116},"When can on-site construction begin according to the template?",{"text":117,"@type":109},"No on-site project construction activities may commence until WSDOT reviews and accepts the project-specific SPCC Plan.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},163216,1790147403,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":47,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":141},137451207643,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","WSDOT DRAFT SPCC Plan Template\nCheck on WSDOT’s \u0013 HYPERLINK \"https://wsdot.wa.gov/engineering-standards/environmental-guidance/stormwater-water-quality\" \u0014Stormwater and Water Quality\u0015 webpage under the tools,\ntemplates, and links tab for an updated version:\nInstructions for use:\nWSDOT designed this template for WSDOT contractors to use to develop Spill Prevention, Control and Countermeasures Plans (SPCC Plans) that satisfy the current WSDOT Standard Specification 1-07.15(1) and National Pollutant Discharge Elimination System (NPDES) requirements.\nCreate the table of contents for the completed plan\nInsert Prime Contractor Name with Company Name\nInsert Names as appropriate; adjust table of content pages to the final content.\nEnsure that all names and contact information are active\nInclude a map that addresses the details under #9 project area, work area, staging area, storage areas, waterways, and sensitive areas (including flow direction).\nThis map may need to be updated or added to as the project is constructed.\nDelete this front page before printing the plan and submitting it to WSDOT for approval.\nPlease ensure the approved plans, if appropriate are available and uploaded with project changes.\nWSDOT Plan Template\nSpill Prevention, Control and Countermeasures Plan\nWSDOT Project Name\nWSDOT SR Milepost Numbers\nWSDOT Contract Number\nPrepared by\nWSDOT Prime Contractor, Executive: Name\nWSDOT Prime Contractor Project Manager: Name\nWSDOT Prime Contractor, Superintendent: Name\nAddress\nCity, Washington Zip\nPhone Number\nDate\nWSDOT Prime Contractor shall maintain a complete and updated copy of this plan in an accessible location for the duration of the project or must have the ability to electronically access this when on the project site at all times.\nWSDOT Project Engineer (PE): Name\nWSDOT PE Office Phone: Number\nWSDOT PE Cell:\nWSDOT Project Chief Inspector: Name\nOffice Phone: Number Cell Phone: Number\nTable of Contents\nSPCC Plan Implementation Requirements ...........................................................................................3\nSPCC Plan Elements...............................................................................................................................3\nResponsible Personnel………………………...................................................................................3\nSpill Reporting........................................................................................................................ 4\nSPCC Flowchart…………............................................................................................................5\nProject and Site Information………………………………………………………………………………………….…5\nPotential Spill Source……........................................................................................................6\nPre-Existing Contamination....................................................................................................7\nSpill Prevention and Response Training ………........................................................................8\nSpill Prevention ......................................................................................................................8\nSpill Response ....................................................................................................................... 10\nProject Site Map.....................................................................................................................13\nSpill Report Form(s) ...............................................................................................................13\nPlan Approval .........................................................................................................................14\nSPCC Plan Acknowledgement Form (to be signed by all Project personnel) .......................15\nAPPENDIX A EXAMPLE SPILL REPORT FORM ..................................................................................(16) A-1\n\u000fSPCC Plan Implementation Requirements\nWSDOT S","cbCaidQWVe7t99AO","https://ap.wps.com/l/cbCaidQWVe7t99AO","docx",305556,20,"English","# SPCC Plan Implementation Requirements\n# SPCC Plan Elements\n## Responsible Personnel\n## Spill Reporting\n## SPCC Flowchart\n## Project and Site Information\n## Potential Spill Source\n## Pre-Existing Contamination\n## Spill Prevention and Response Training\n## Spill Prevention\n## Spill Response\n## Project Site Map\n## Spill Report Form(s)\n## Plan Approval\n## SPCC Plan Acknowledgement Form\n# APPENDIX A EXAMPLE SPILL REPORT FORM","[{\"question\":\"What is the purpose of the WSDOT SPCC Plan in this template?\",\"answer\":\"The SPCC Plan protects human health and the environment from spills and releases of hazardous materials. It also addresses fire-code conditions that may apply under Section 3406 as approved by the local Fire Marshal.\"},{\"question\":\"Who is responsible for implementing and updating the SPCC Plan?\",\"answer\":\"The Prime Contractor maintains and updates the SPCC Plan throughout the project and ensures full implementation at all times. Table 1.1 is used to list responsible personnel and active contact information, including subcontractor contacts if spill response subcontractors are used.\"},{\"question\":\"When can on-site construction begin according to the template?\",\"answer\":\"No on-site project construction activities may commence until WSDOT reviews and accepts the project-specific SPCC Plan.\"}]","WSDOT SPCC Plan Template | DOCX",1788139649,7]