[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-244063-105":53,"doc-detail-244063-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","wsdot-form-140-005","WSDOT Form 140-005","","This document is a Change Order form, WSDOT Form 140-005, revised in April 2015. It is designed to record changes to a contract. The form includes fields for Contract Number, Contract Title, Federal Aid Number, Change Order Number, Date, Prime Contractor/Design-Builder, and a detailed Change Description. It also captures verbal approvals and their dates, along with adjustments to working days. Financial details such as Original Contract Amount, Current Contract Amount, Estimated Net Change for the Change Order, and Estimated Contract Amount are to be filled in. The form requires approvals from the Project Engineer and the Approving Authority per C.A. Agreement, with spaces for signatures and dates. Additionally, it allows for recommendations from the Project Engineer and other required approvals, including by the Prime Contractor. Page 2 continues the Change Description if necessary and retains the form's revision date.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/wsdot-form-140-005/244063/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/wsdot-form-140-005/244063.png","ImageObject",442,249,{"name":88,"@type":89},"\tCallum ","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-22","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":8},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What is the purpose of WSDOT Form 140-005?","Question",{"text":108,"@type":109},"WSDOT Form 140-005 is a Change Order form used to officially document and record modifications made to an existing contract, including details of the proposed changes and their financial and temporal impact.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What key information is captured on the Change Order form?",{"text":113,"@type":109},"The form captures essential contract details like contract number and title, change order number, description of the change, contractor information, financial adjustments (original, current, and estimated contract amounts), and working day modifications.",{"name":115,"@type":106,"acceptedAnswer":116},"Who needs to approve a Change Order using this form?",{"text":117,"@type":109},"A Change Order requires approval from the Project Engineer and the Approving Authority as per the C.A. Agreement, with a provision for other required approvals and a signature from the Prime Contractor.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},244063,1789211521,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":8,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":73,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":125,"read_time":9},137451211410,"https://ap-avatar.wpscdn.com/avatar/2000bb0a9246f588df?x-image-process=image/resize,m_fixed,w_180,h_180&k=1786362646172706240","Change Order  \n\n| Contract Number | Contract Title | Federal Aid Number |\n| --- | --- | --- |\n| Change Order Number | Change Description | Date |\n| Prime Contractor /Design-Builder |  |  |\n\nOrdered by Engineer under the terms of Section 1-04.4 of the Standard Specifications Change proposed by Contractor / Design-Builder  \nChange Description  \n\n| Verbal Approval Given By | Verbal Approval Date | Working Days +/- |\n| --- | --- | --- |\n\n\n| Original Contract Amount | Current Contract Amount | Est. Net Change This C.O. | Est. Contract Amount |\n| --- | --- | --- | --- |\n\n\n| Approval Recommended Approved | Approved |\n| --- | --- |\n| Project Engineer | Approving Authority per C.A. Agreement |\n| Date | Date |\n| Approval Recommended | Other Approval As Required |\n| By Prime Contractor | Signature Date |\n| Date | Representing |\n\nWSDOT Form 140-005 Page 1  \nRevised 04/2015  \n\n| Contract Number | Contract Title | Change Order Number |\n| --- | --- | --- |\n| Change Description Cont. |  |  |\n\nWSDOT Form 140-005 Page 2  \nRevised 04/2015","cbCaipj0OBRKsPBR","https://ap.wps.com/l/cbCaipj0OBRKsPBR","pdf",123336,"English","# Change Order\n## Contract Details\n## Change Details\n## Financial Summary\n## Approvals","[{\"question\":\"What is the purpose of WSDOT Form 140-005?\",\"answer\":\"WSDOT Form 140-005 is a Change Order form used to officially document and record modifications made to an existing contract, including details of the proposed changes and their financial and temporal impact.\"},{\"question\":\"What key information is captured on the Change Order form?\",\"answer\":\"The form captures essential contract details like contract number and title, change order number, description of the change, contractor information, financial adjustments (original, current, and estimated contract amounts), and working day modifications.\"},{\"question\":\"Who needs to approve a Change Order using this form?\",\"answer\":\"A Change Order requires approval from the Project Engineer and the Approving Authority as per the C.A. Agreement, with a provision for other required approvals and a signature from the Prime Contractor.\"}]","WSDOT Form 140-005 | PDF"]