[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-169373-en":3,"doc-seo-169373-105":29,"detail-sidebar-cat-1-en-105":92},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":11,"category_id":12,"category_name":13,"doc_title":14,"doc_description":15,"doc_content":16,"file_id":17,"file_url":18,"file_type":19,"file_size":20,"view_count":4,"is_deleted":4,"is_public":11,"is_downloadable":11,"audit_status":11,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":15,"update_tm":28,"read_time":12},169373,3848291630094,"Emma Wilson","https://eur-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45",1,11,"Presentations","What is PPAP - Supplier Training PPAP","Supplier training material explaining the Production Part Approval Process (PPAP) based on AIAG PPAP 4th Edition. Covers PPAP purpose, scope and common misunderstandings, and clarifies when PPAP is required for part design and manufacturing process changes. Details when PPAP applies alongside APQP/PSO, PPAP timing guidance, and the PPAP elements, emphasizing supplier and GHSP SDE/SQE responsibilities for evidence, controlled records, engineering changes, approvals, DFMEA/PFMEA, and process documentation readiness.","Production Part Approval Process AIAG PPAP 4th Edition\nSupplier Production Part Approval Process GHSP\nWhat is PPAP\nProduction Part Approval Process\n– AIAG fourth edition\nPurpose: To determine that manufacturing process is ready to consistently meet requirements at quoted rate. (there is a lot in this sentence)\nIt is for the Manufacturer……..\nIt is in conjunction with the APQP/PSO activities.\nWhat PPAP is Not\nIt is NOT:\nFor the customer (GHSP, Chrysler, etc…)\nA singular “event”\nA method of torture\nA test for the SDE / SQE / Quality person\nA one day activity (on either end)\nWhen to PPAP\nSee AIAG Manual pg 13 – 15\nIn summary – any change to part design (not necessarily drawing) or manufacturing process\nAsk….\nElements of PPAP\nGHSP defaults to level 4 unless otherwise specified. SDE or SQE determines what evidence they want submitted.\nVery important!!!!!!\nReason for Training\n“The organization shall meet all specified PPAP requirements…elements 1 thru 18.\nThe organization shall also meet all customer-specific PPAP requirements.”  PPAP 4th Edition, March 2006, p3\n# of total non conformances\n1.) Design Records\nThe supplier shall have all design records for saleable product\n- Includes an approved design record for components or details\n- There is only one design record regardless of who has design responsibility\n- If the supplier is design responsible, GHSP may release the supplier’s design records into our system for documentation and data control.  This may include supplier performance specifications.\n- For catalog parts, the design record may only consist of functional specs or  a recognized industry standard .  Example: MOSFET 60V, 3a, AEC 201 qualified\nWhen the “master” design record is in electronic format, hard copy must be supplied\nGHSP  SDE/SQE Responsibilities:\nVerify Design Records submitted with PPAP are a controlled version, at the correct revision level and includes any design records incorporated by reference.\nIn other words… verify everything within the 4 borders of the paper. GHSP dwg.\nHint: A ballooned drawing really helps here.\n2.) Engineering Change Documents\nAny authorized engineering change documents not yet recorded on the design record but incorporated in the product, part or tooling\nApproved customer engineering changes\nApproved Change Notifications\nApproved Change Authorizations awaiting drawings\nApproved Supplier SREAs that will generate CAs\nGHSP  SDE/SQE Responsibilities:\nIf we are asked to have suppliers PPAP to a marked up drawing, this may be acceptable for short term as long as we have a ECR # and action plan to complete the change with clear responsibilities (owners).\nWhen the change officially is complete we may ask for an updated PSW only and file in same PPAP folder that we used for marked up change.\nIn other words: is there a reason you cannot fully ppap? Are you requesting interim?\nHint: 99% of the time this section is N/A\n3.) Customer Engineering Approval\nWhere specified by the design record, the supplier shall have evidence of customer engineering approval\nGHSP SDE/SQE Responsibilities:\nTo obtain customer (OEM) Engineering approval if required as a part of customer specific requirements.  Generally this is not required.\nIn other words: Do you have approval to make this change\nHint: 99.99% of the time this section is N/A\n4.) Design FMEA\nSuppliers shall have a Design FMEA for parts for which they are design-responsible\nCompliant to Potential Failure Mode and Effects Analysis reference manual 4th Edition\n- Need to have RPN values calculated for each item\n- Need to have actions identified with dates and results for those items that are considered high risk\nNeed to have all critical , significant  and pass thru characteristics identified in the appropriate column\nGHSP  SDE/SQE Responsibilities:\nIf GHSP is design responsible, provide a copy of GHSP DFMEA(s) to suppliers\nIf Supplier is design responsible, review the DFMEA and check that recommended actions have been completed, all special characteristics","cbCaipCE7qXL44BL","https://ap.wps.com/l/cbCaipCE7qXL44BL","pptx",662374,32,"English","en",105,"# What is PPAP\n## Purpose and scope\n## What PPAP is not\n## When to PPAP\n## Elements of PPAP\n## GHSP SDE/SQE responsibilities\n## Design records and engineering change documents\n## Customer engineering approval and DFMEA\n## Process flow diagrams and PFMEA\n## Dimensional layout (starting)","[{\"question\":\"What is the purpose of PPAP in manufacturing?\",\"answer\":\"PPAP determines that the manufacturing process is ready to consistently meet requirements at the quoted rate.\"},{\"question\":\"When should a supplier submit PPAP?\",\"answer\":\"PPAP is triggered by any change to part design (not necessarily only drawings) or the manufacturing process, following the guidance in the AIAG manual.\"},{\"question\":\"Who requests or requires evidence and what do SDE/SQE responsibilities cover?\",\"answer\":\"SDE/SQE determine what evidence is needed and verify that submitted PPAP items are controlled versions with the correct revision level, including checking linked documentation such as DFMEA/PFMEA, control plans, and process flow diagrams.\"}]","What is PPAP - Supplier Training PPAP | PPTX",1788253011,{"code":4,"msg":30,"data":31},"ok",{"site_id":24,"language":23,"slug":32,"title":14,"keywords":33,"description":15,"schema_data":34,"social_meta":87,"head_meta":89,"extra_data":91,"updated_unix":28},"what-is-ppap-supplier-training-ppap","",{"@graph":35,"@context":86},[36,53,69],{"@type":37,"itemListElement":38},"BreadcrumbList",[39,43,47,50],{"item":40,"name":41,"@type":42,"position":11},"https://docshare.wps.com","Home","ListItem",{"item":44,"name":45,"@type":42,"position":46},"https://docshare.wps.com/template/","Template",2,{"item":48,"name":13,"@type":42,"position":49},"https://docshare.wps.com/template/presentations/",3,{"item":51,"name":14,"@type":42,"position":52},"https://docshare.wps.com/template/what-is-ppap-supplier-training-ppap/169373/",4,{"url":51,"name":14,"@type":54,"author":55,"headline":14,"publisher":57,"fileFormat":60,"inLanguage":23,"description":15,"dateModified":61,"datePublished":62,"encodingFormat":60,"isAccessibleForFree":63,"interactionStatistic":64},"DigitalDocument",{"name":9,"@type":56},"Person",{"url":40,"name":58,"@type":59},"DocShare","Organization","application/vnd.openxmlformats-officedocument.presentationml.presentation","2026-09-05","2026-09-01",true,{"@type":65,"interactionType":66,"userInteractionCount":68},"InteractionCounter",{"@type":67},"ViewAction",5,{"@type":70,"mainEntity":71},"FAQPage",[72,78,82],{"name":73,"@type":74,"acceptedAnswer":75},"What is the purpose of PPAP in manufacturing?","Question",{"text":76,"@type":77},"PPAP determines that the manufacturing process is ready to consistently meet requirements at the quoted rate.","Answer",{"name":79,"@type":74,"acceptedAnswer":80},"When should a supplier submit PPAP?",{"text":81,"@type":77},"PPAP is triggered by any change to part design (not necessarily only drawings) or the manufacturing process, following the guidance in the AIAG manual.",{"name":83,"@type":74,"acceptedAnswer":84},"Who requests or requires evidence and what do SDE/SQE responsibilities cover?",{"text":85,"@type":77},"SDE/SQE determine what evidence is needed and verify that submitted PPAP items are controlled versions with the correct revision level, including checking linked documentation such as DFMEA/PFMEA, control plans, and process flow diagrams.","https://schema.org",{"og:url":51,"og:type":88,"og:title":14,"og:site_name":58,"og:description":15},"article",{"robots":90,"canonical":51},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":93},[94,97,102,107,112,117,122,127,131],{"id":12,"doc_module":11,"doc_module_name":45,"category_name":13,"show_sort_weight":95,"slug":96},90,"presentations",{"id":98,"doc_module":11,"doc_module_name":45,"category_name":99,"show_sort_weight":100,"slug":101},12,"Resumes",80,"resumes",{"id":103,"doc_module":11,"doc_module_name":45,"category_name":104,"show_sort_weight":105,"slug":106},14,"Invoices",70,"invoices",{"id":108,"doc_module":11,"doc_module_name":45,"category_name":109,"show_sort_weight":110,"slug":111},15,"Posters",60,"posters",{"id":113,"doc_module":11,"doc_module_name":45,"category_name":114,"show_sort_weight":115,"slug":116},16,"Social Media",50,"social-media",{"id":118,"doc_module":11,"doc_module_name":45,"category_name":119,"show_sort_weight":120,"slug":121},17,"Forms",40,"forms",{"id":123,"doc_module":11,"doc_module_name":45,"category_name":124,"show_sort_weight":125,"slug":126},18,"Letters",30,"letters",{"id":128,"doc_module":11,"doc_module_name":45,"category_name":129,"show_sort_weight":68,"slug":130},21,"Paper Templates","papers-templates",{"id":132,"doc_module":11,"doc_module_name":45,"category_name":133,"show_sort_weight":4,"slug":134},158,"General","general-158"]