[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-173113-105":53,"doc-detail-173113-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","wetland-and-stream-mitigation-plan-draftfinal","Wetland and Stream Mitigation Plan - Draft/Final","","Draft/final wetland and stream Mitigation Plan for a transportation project includes an executive summary of wetland impacts and compensatory mitigation. The plan identifies the proposed project and provides introduction, location, purpose, and schedule, along with responsible parties and contributors. It documents existing conditions across wetlands, streams, buffers/uplands, land use history, and watershed context, then presents impact assessment and detailed mitigation strategy and compensatory mitigation site selection.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/wetland-and-stream-mitigation-plan-draftfinal/173113/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/wetland-and-stream-mitigation-plan-draftfinal/173113.png","ImageObject",442,249,{"name":88,"@type":89},"Cart","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-20","2026-09-01",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",10,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What does the wetland and stream Mitigation Plan cover?","Question",{"text":109,"@type":110},"It summarizes project wetland impacts and compensatory mitigation, then details existing conditions, impact assessment, and mitigation strategy including compensatory mitigation site information.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"How are project impacts assessed in the plan?",{"text":114,"@type":110},"The plan breaks impact assessment into wetlands and streams, including permanent and temporary impacts, indirect impacts, and related considerations such as shading and buffer impacts.",{"name":116,"@type":107,"acceptedAnswer":117},"What mitigation steps does the plan include?",{"text":118,"@type":110},"It includes impact avoidance and minimization, compensatory mitigation with regulatory requirements, and proposals covering compensatory mitigation and temporary restoration of wetlands and buffers.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},173113,1790141289,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":136,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":61,"update_tm":141,"read_time":15},18829141979164,"https://eur-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","draft/final wetland\u0005 and stream \u0005MitiGation Plan\nProject Name\nProject County, Washington\nWork Order:\nWIN:\nPIN:\nPrepared By\nWSDOT XX Region\nOffice Name\nMonth Day, Year\n\u000f\ndraft/final wetland and stream Mitigation Plan\nProject Name\nMonth Day, Year\nPrepared By:\nBiologist Name, Title\nPhone Number\nWSDOT Office/Consultant Name\nProject Engineer:\nPE Name, Project Engineer\nPhone Number\nWSDOT Office\nOther Contributors and Role:\nContributor Name, Title, WSDOT Office/Consultant Name, role\nContributor Name, Title, WSDOT Office/Consultant Name, role\nContributor Name, Title, WSDOT Office/Consultant Name, role\nContributor Name, Title, WSDOT Office/Consultant Name, role\u000f\n\u0013 HYPERLINK \"https://www.wsdot.wa.gov/EqualOpportunity/titlevi.htm\" \u0014Title VI\u0015 Notice to Public\nIt is the Washington State Department of Transportation’s (WSDOT) policy to assure that no person shall, on the grounds of race, color, national origin or sex, as provided by Title VI of the Civil Rights Act of 1964, be excluded from participation in, be denied the benefits of, or be otherwise discriminated against under any of its federally funded programs and activities. Any person who believes his/her Title VI protection has been violated, may file a complaint with WSDOT’s Office of Equal Opportunity (OEO). For additional information regarding Title VI complaint procedures and/or information regarding our non-discrimination obligations, please contact OEO’s Title VI Coordinator at (360) 705-7090.\n\u0013 HYPERLINK \"https://www.wsdot.wa.gov/EqualOpportunity/ADA.htm\" \u0014Americans with Disabilities Act\u0015 (ADA) Information\nThis material can be made available in an alternate format by emailing the Office of Equal Opportunity at wsdotada@wsdot.wa.gov or by calling toll free, 855-362-4ADA(4232). Persons who are deaf or hard of hearing may make a request by calling the Washington State Relay at 711.\nExecutive Summary\u0005\nText\u0005\nSummary of project wetland impacts and compensatory mitigation.\u0005\n\u000f\n\u0003Table of Contents\u0005\n\u0013 TOC \\h \\z \\u \\t \"Heading 2,1,Heading 3,2,Heading 4,3\" \u0014\u0013 HYPERLINK \\l \"_Toc115253519\" \u00141.\tProposed Project\t\u0013 PAGEREF _Toc115253519 \\h \u00141\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc115253520\" \u00141.1.\tIntroduction\t\u0013 PAGEREF _Toc115253520 \\h \u00141\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc115253521\" \u00141.2.\tProject Location\t\u0013 PAGEREF _Toc115253521 \\h \u00141\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc115253522\" \u00141.3\tProject Purpose and Description\t\u0013 PAGEREF _Toc115253522 \\h \u00143\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc115253523\" \u00141.4.\tProject Schedule\t\u0013 PAGEREF _Toc115253523 \\h \u00143\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc115253524\" \u00141.5.\tResponsible Parties\t\u0013 PAGEREF _Toc115253524 \\h \u00143\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc115253525\" \u00142.\tExisting Conditions\t\u0013 PAGEREF _Toc115253525 \\h \u00144\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc115253526\" \u00142.1.\tLandscape Setting\t\u0013 PAGEREF _Toc115253526 \\h \u00144\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc115253527\" \u00142.1.1.\tWetlands\t\u0013 PAGEREF _Toc115253527 \\h \u00144\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc115253528\" \u00142.1.2.\tStreams\t\u0013 PAGEREF _Toc115253528 \\h \u00144\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc115253529\" \u00142.1.3.\tBuffers/Uplands\t\u0013 PAGEREF _Toc115253529 \\h \u00144\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc115253530\" \u00142.2.\tLand Use History\t\u0013 PAGEREF _Toc115253530 \\h \u00144\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc115253531\" \u00142.3.\tWatershed Context\t\u0013 PAGEREF _Toc115253531 \\h \u00144\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc115253532\" \u00143.\tImpact Assessment\t\u0013 PAGEREF _Toc115253532 \\h \u00141\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc115253533\" \u00143.1.\tWetlands\t\u0013 PAGEREF _Toc115253533 \\h \u00141\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc115253534\" \u00143.1.1.\tPermanent Wetland Impacts\t\u0013 PAGEREF _Toc115253534 \\h \u00141\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc115253535\" \u00143.1.2.\tPermanent Conversions\t\u0013 PAGEREF _Toc115253535 \\h \u00141\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc115253536\" \u00143.1.3.\tShort-term Temporary Wetland Impacts\t\u0013 PAGEREF _Toc115253536 \\h \u00141\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc115253537\" \u00143.1.4.\tLong-term Temporary Wetland Impacts\t\u0013 PAGEREF _Toc115253537 \\h \u00141\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc115253538\" \u00143.1.5.\tIndirect Wetland Impacts\t\u0013 PAGEREF _Toc115253538 \\h \u00141\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc115253539\" \u00143.1.6.\tShading\t\u0013 PAGEREF _Toc115253539 \\h \u00141\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc115253540\" \u00143.2.\tImpacts on Wetland Functions\t\u0013 PAGEREF _Toc115253540 \\h \u00141\u0015\u0015\n\u0013 HYPERLI","cbCairp3WecgWW1e","https://ap.wps.com/l/cbCairp3WecgWW1e","docx",112587,33,"English","# Executive Summary\n## Proposed Project\n## Existing Conditions\n## Impact Assessment\n## Mitigation Strategy\n## Compensatory Mitigation","[{\"question\":\"What does the wetland and stream Mitigation Plan cover?\",\"answer\":\"It summarizes project wetland impacts and compensatory mitigation, then details existing conditions, impact assessment, and mitigation strategy including compensatory mitigation site information.\"},{\"question\":\"How are project impacts assessed in the plan?\",\"answer\":\"The plan breaks impact assessment into wetlands and streams, including permanent and temporary impacts, indirect impacts, and related considerations such as shading and buffer impacts.\"},{\"question\":\"What mitigation steps does the plan include?\",\"answer\":\"It includes impact avoidance and minimization, compensatory mitigation with regulatory requirements, and proposals covering compensatory mitigation and temporary restoration of wetlands and buffers.\"}]","Wetland and Stream Mitigation Plan - Draft/Final | DOCX",1788300083]