[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-161888-105":3,"detail-sidebar-cat-1-en-105":75,"doc-detail-161888-en":121},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":68,"head_meta":70,"extra_data":72,"updated_unix":74},105,"en","weathertightness-and-building-envelope-assessment-executive-summary","Weathertightness and Building Envelope Assessment - Executive Summary","","This report delivers building envelope remedial work recommendations for a single school building, structured into two budgeting categories. One category addresses identified weathertightness failures linked to building work undertaken between 1994 and 2005, while the second covers recommendations outside that period, including short-term maintenance such as gutter cleaning and end-of-life replacements such as roof sheeting. Essential remediation and maintenance actions are summarized with work areas indicated in supporting photographs and detailed tables, with observations supported by photos and asset management context.",{"@graph":14,"@context":67},[15,34,50],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/presentations/","Presentations",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/weathertightness-and-building-envelope-assessment-executive-summary/161888/",4,{"url":32,"name":10,"@type":35,"author":36,"headline":10,"publisher":39,"fileFormat":42,"inLanguage":8,"description":12,"dateModified":43,"datePublished":44,"encodingFormat":42,"isAccessibleForFree":45,"interactionStatistic":46},"DigitalDocument",{"name":37,"@type":38},"Logic","Person",{"url":19,"name":40,"@type":41},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-09-11","2026-08-30",true,{"@type":47,"interactionType":48,"userInteractionCount":22},"InteractionCounter",{"@type":49},"ViewAction",{"@type":51,"mainEntity":52},"FAQPage",[53,59,63],{"name":54,"@type":55,"acceptedAnswer":56},"What does this report recommend?","Question",{"text":57,"@type":58},"It provides building envelope remedial work recommendations covering weathertightness failures and additional maintenance and improvement actions. Recommendations include short-term, medium-term, and long-term repair work.","Answer",{"name":60,"@type":55,"acceptedAnswer":61},"How are recommendations organized for budgeting?",{"text":62,"@type":58},"Recommendations are separated into two categories: items related to weathertightness failures from building work undertaken during 1994–2005, and items outside that period, including maintenance and end-of-life replacements.",{"name":64,"@type":55,"acceptedAnswer":65},"What evidence supports the conclusions and recommendations?",{"text":66,"@type":58},"Detailed observations and photos link asset management recommendations for weathertightness and building element failures to specific remedial work and maintenance actions.","https://schema.org",{"og:url":32,"og:type":69,"og:title":10,"og:site_name":40,"og:description":12},"article",{"robots":71,"canonical":32},"index,follow",{"doc_id":73,"site_id":7},161888,1788112384,{"code":4,"msg":76,"data":77},"success",[78,82,87,92,97,102,107,112,117],{"id":79,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":80,"slug":81},11,90,"presentations",{"id":83,"doc_module":22,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},12,"Resumes",80,"resumes",{"id":88,"doc_module":22,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},14,"Invoices",70,"invoices",{"id":93,"doc_module":22,"doc_module_name":25,"category_name":94,"show_sort_weight":95,"slug":96},15,"Posters",60,"posters",{"id":98,"doc_module":22,"doc_module_name":25,"category_name":99,"show_sort_weight":100,"slug":101},16,"Social Media",50,"social-media",{"id":103,"doc_module":22,"doc_module_name":25,"category_name":104,"show_sort_weight":105,"slug":106},17,"Forms",40,"forms",{"id":108,"doc_module":22,"doc_module_name":25,"category_name":109,"show_sort_weight":110,"slug":111},18,"Letters",30,"letters",{"id":113,"doc_module":22,"doc_module_name":25,"category_name":114,"show_sort_weight":115,"slug":116},21,"Paper Templates",5,"papers-templates",{"id":118,"doc_module":22,"doc_module_name":25,"category_name":119,"show_sort_weight":4,"slug":120},158,"General","general-158",{"code":4,"msg":76,"data":122},{"doc_id":73,"user_id":123,"nickname":37,"user_avatar":124,"doc_module":22,"category_id":79,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":125,"file_id":126,"file_url":127,"file_type":128,"file_size":129,"view_count":4,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":130,"language":131,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":132,"faqs":133,"seo_title":134,"seo_description":12,"update_tm":74,"read_time":83},1099513958762,"https://ap-avatar.wpscdn.com/avatar/1000023916a998db790?x-image-process=image/resize,m_fixed,w_180,h_180&k=1784791008015729253","\u003C School Name >\n\u003C Block X > - \u003C Building Name >\nWeathertightness and Building Envelope Assessment\n\u003C Insert a good overview picture of the building here. Note each report must cover only one building >\n\u003C INSTRUCTIONS ON USING THIS TEMPLATE >\n\u003C All yellow highlighted text within “\u003C   >” needs to be checked and overwritten as required >\n\u003CMonth Year>\nPrepared by \u003C Company Name >\nfor the Ministry of Education\nVersion 8.5 Template, 18 September 2023\nDocument Control Records\nDocument prepared by:\n\u003C Company Name >\n\u003C Address >\nTelephone: \u003C Phone Number >\nEmail:         \u003C Email Address >\nRevision History\nDocument Acceptance\n\u000f\n\u0003Table of Contents\n\u0013 TOC \\o \"1-2\" \\h \\z \\u \u0014\n\u0013 HYPERLINK \\l \"_Toc142487387\" \u0014Executive Summary\t\u0013 PAGEREF _Toc142487387 \\h \u00144\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487388\" \u00141\tIntroduction\t\u0013 PAGEREF _Toc142487388 \\h \u00147\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487389\" \u00141.1\tPurpose of Report\t\u0013 PAGEREF _Toc142487389 \\h \u00147\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487390\" \u00141.2\tContext\t\u0013 PAGEREF _Toc142487390 \\h \u00147\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487391\" \u00141.3\tAsset Management Context\t\u0013 PAGEREF _Toc142487391 \\h \u00148\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487392\" \u00141.4\tInspection Methodology\t\u0013 PAGEREF _Toc142487392 \\h \u00148\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487393\" \u00142\tGeneral Information\t\u0013 PAGEREF _Toc142487393 \\h \u001411\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487394\" \u00142.1\tBuilding Overview\t\u0013 PAGEREF _Toc142487394 \\h \u001411\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487395\" \u00142.2\tInspection Background\t\u0013 PAGEREF _Toc142487395 \\h \u001411\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487396\" \u00142.3\tBuilding Location\t\u0013 PAGEREF _Toc142487396 \\h \u001412\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487397\" \u00142.4\tNotes from meetings with relevant school staff\t\u0013 PAGEREF _Toc142487397 \\h \u001412\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487398\" \u00142.5\tFloor plan and location of observed leaks\t\u0013 PAGEREF _Toc142487398 \\h \u001413\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487399\" \u00142.6\t10YP Plan information available for building envelope assessment\t\u0013 PAGEREF _Toc142487399 \\h \u001414\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487400\" \u00143\tInspection - Observations and Remedial Work\t\u0013 PAGEREF _Toc142487400 \\h \u001416\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487401\" \u0014Table 3.1 Weathertightness failures and remedial work summary\t\u0013 PAGEREF _Toc142487401 \\h \u001416\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487402\" \u0014Table 3.2 Rough order of cost\t\u0013 PAGEREF _Toc142487402 \\h \u001418\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487403\" \u0014Table 3.3 Other moisture related and/or ventilation causes\t\u0013 PAGEREF _Toc142487403 \\h \u001419\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487404\" \u0014Table 3.4 Additional or alternative building work\t\u0013 PAGEREF _Toc142487404 \\h \u001419\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487405\" \u0014Table 3.5 Subfloor, wall insulation and ceiling space observations\t\u0013 PAGEREF _Toc142487405 \\h \u001420\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487406\" \u00144\tBuilding Envelope – Observations, Maintenance & other Remedial Work (Separate to Weathertightness Remediation)\t\u0013 PAGEREF _Toc142487406 \\h \u001421\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487407\" \u0014Table 4.1 Short-term remedial work summary – Urgent & up to 2 years\t\u0013 PAGEREF _Toc142487407 \\h \u001421\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487408\" \u0014Table 4.2 Medium-term remedial work summary – From 2 to 5 years\t\u0013 PAGEREF _Toc142487408 \\h \u001424\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487409\" \u0014Table 4.3 Long-term remedial work summary – From 5 to 10 years\t\u0013 PAGEREF _Toc142487409 \\h \u001426\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487410\" \u00145\tScope Limitations\t\u0013 PAGEREF _Toc142487410 \\h \u001428\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487411\" \u0014Glossary\t\u0013 PAGEREF _Toc142487411 \\h \u001430\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487412\" \u0014Appendix A  Photos of building\t\u0013 PAGEREF _Toc142487412 \\h \u001432\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487413\" \u0014Appendix B  Elevations Showing Remediation & Repairs\t\u0013 PAGEREF _Toc142487413 \\h \u001433\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc142487414\" \u0014Appendix C  Additional information from further investigations\t\u0013 PAGEREF _Toc142487414 \\h \u001434\u0015\u0015\n\u0015\u0013 TOC \\o \"1-2\" \\h \\z \\u \u0014\u0013 HYPERLINK \\l \"_Toc129161183\" \u0014\u0015\n\u0015\u0004\nExecutive Summary\nThis report provides building envelope remedial work recommendations in two categories.  The first is focused on the identified weathertightness failures of the building envelope related to building work undertaken during the period 1994 - 2005. The second ","cbCaijAjBvdi5sfQ","https://ap.wps.com/l/cbCaijAjBvdi5sfQ","docx",860994,34,"English","# Executive Summary\n## Introduction\n### Purpose of Report\n### Context\n### Asset Management Context\n### Inspection Methodology\n## General Information\n## Inspection - Observations and Remedial Work\n## Building Envelope – Observations, Maintenance & other Remedial Work (Separate to Weathertightness Remediation)\n## Scope Limitations\n## Glossary\n## Appendix A  Photos of building\n## Appendix B  Elevations Showing Remediation & Repairs\n## Appendix C  Additional information from further investigations","[{\"question\":\"What does this report recommend?\",\"answer\":\"It provides building envelope remedial work recommendations covering weathertightness failures and additional maintenance and improvement actions. Recommendations include short-term, medium-term, and long-term repair work.\"},{\"question\":\"How are recommendations organized for budgeting?\",\"answer\":\"Recommendations are separated into two categories: items related to weathertightness failures from building work undertaken during 1994–2005, and items outside that period, including maintenance and end-of-life replacements.\"},{\"question\":\"What evidence supports the conclusions and recommendations?\",\"answer\":\"Detailed observations and photos link asset management recommendations for weathertightness and building element failures to specific remedial work and maintenance actions.\"}]","Weathertightness and Building Envelope Assessment - Executive Summary | DOCX"]