[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-243691-105":53,"doc-detail-243691-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","watersmart-grants-final-report-format-instructions","WaterSMART Grants Final Report Format - Instructions","","WaterSMART Grants final report instructions guide recipients in preparing a required program performance report after completing a WaterSMART project. The document explains the purpose of the Final Report for demonstrating program benefits to Congress and the public, defines submission timing within 90 days, and outlines the minimum content expectations for describing project completion, quantifying benefits, and meeting applicable regulatory requirements. It also provides recipient, funding, summary, and water conservation measurement guidance.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/watersmart-grants-final-report-format-instructions/243691/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/watersmart-grants-final-report-format-instructions/243691.png","ImageObject",442,249,{"name":88,"@type":89},"Jordan Avery","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-17","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",6,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What is the purpose of the WaterSMART Grants Final Report?","Question",{"text":109,"@type":110},"The Final Report fulfills a WaterSMART Program requirement and helps Reclamation demonstrate the benefits of the program to others, including Congress and the public.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"When is the Final Report due after the agreement ends?",{"text":114,"@type":110},"An original and two copies must be submitted no later than 90 days following the expiration or termination of the financial assistance agreement.",{"name":116,"@type":107,"acceptedAnswer":117},"What minimum information must the Final Report include?",{"text":118,"@type":110},"At a minimum, it must describe project completion, quantify project benefits, and comply with applicable requirements under 43 CFR 12.80 or 12.951.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},243691,1791364621,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":136,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":61,"update_tm":141,"read_time":76},1099523882367,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","WaterSMART Grants SUGGESTED FINAL REPORT FORMAT  \nProject Name Project Location  \nFinal Project Report  \n[Insert picture, if available]  \nAgreement \\#  \nRecipient Name  \nRecipient Address  \nDate  \nFinal Report Format – Instructions  \n1. About the Final Report: The Final Report Format provided below is intended to be used by WaterSMART recipients to prepare a final program performance report (“Final Report”), upon the completion of a WaterSMART project. The Final Reports prepared by WaterSMART recipients fulfill an important requirement of the WaterSMART Program, while also providing Reclamation with a means of demonstrating the benefits of the program to others. In these days of shrinking Federal budgets, it is important to provide Congress and the public with information about the actual benefits being realized. With your help, we hope to keep this program thriving long into the future.  \n2. Deadline for Submission: An original and two copies of the Final Report must be submitted to Reclamation no later than 90 days following the expiration or termination of the financial assistance agreement. In some cases, Reclamation may approve an extension of the agreement if more time is needed for the recipient to collect information needed for the Final Report.  \n3. Final Report Form: This Final Report Format is a suggested format only; the recipient may use its own form or format. However, at a minimum, the Final Report must describe the completion of the project, quantify the project benefits, and comply with the requirements of  \n43 CFR 12.80 or 12.951, as applicable. A report using this suggested format will satisfy the requirements of 43 CFR 12.80 or 12.951. Failure to submit timely and acceptable progress reports, including the Final Report, places the recipient in noncompliance with the terms and conditions of the financial assistance agreement.  \n4. Filling out the Attached Form: You may save this format to your computer and type directly into the form in the spaces provided. The boxes will expand as text is entered. There is no page limit for the Final Report.  \n5. Assistance with the Final Report: For questions or assistance regarding the preparation of your Final Report, please contact your Reclamation Grants Officer Technical Representative.  \n\n| 1. Recipient Information: |  |\n| --- | --- |\n| Recipient Name:\u003Cbr>(Name, contact person, address and phone number) |  |\n| Project Name: |  |\n| Assistance Agreement No: |  |\n| Date of Award: (Month, Year) |  |\n| Estimated Completion Date (Month, Year) |  |\n| Actual Completion Date:(Month, Year) |  |\n\n\n| 2. Final Funding Information | Funding Amount |\n| --- | --- |\n| Non-Federal Entities |  |\n| 1. |  |\n| 2. |  |\n| 3. |  |\n| Non-Federal Subtotal: |  |\n|  |  |\n| Other Federal Entities |  |\n| 1. |  |\n| 2. |  |\n| 3. |  |\n| Other Federal Subtotal: |  |\n|  |  |\n| Requested Reclamation Funding: |  |\n|  |  |\n| Total Project Funding: |  |\n\n\n| 3. One Paragraph Project Summary: |\n| --- |\n|  |\n\n\n| 4. Final Project Description: Briefly describe components of the project and the work completed, including each element of the scope of work and the work completed at each stage of the project. Please include maps, sketches, and/or drawing of the features of the completed project, as appropriate. In addition, please describe any changes in the project scope. |\n| --- |\n|  |\n\n\n| 5. Accomplishment of Project Goals: Describe the goals and objectives of the project and whether each of these was met. Where appropriate, state the reasons why goals and objectives were not met, and describe any problems or delays encountered in completing the project. Please include whether or not the project was completed within cost. |\n| --- |\n|  |\n\n6. Discussion of Amount of Water Conserved, Marketed or Better Managed: In responding  \n\n| to the questions set forth below, Recipients should rely on the best data or information available. Actual field measurements should be used whenever possible (e.g., baseline data or post-p","cbCaiju0EP83dlR7","https://ap.wps.com/l/cbCaiju0EP83dlR7","pdf",277359,9,"English","# Final Report Format – Instructions\n## About the Final Report\n## Deadline for Submission\n## Final Report Form\n## Filling out the Attached Form\n## Assistance with the Final Report\n# Recipient Information\n# Final Funding Information\n# One Paragraph Project Summary\n# Final Project Description\n# Accomplishment of Project Goals\n# Discussion of Amount of Water Conserved, Marketed or Better Managed","[{\"question\":\"What is the purpose of the WaterSMART Grants Final Report?\",\"answer\":\"The Final Report fulfills a WaterSMART Program requirement and helps Reclamation demonstrate the benefits of the program to others, including Congress and the public.\"},{\"question\":\"When is the Final Report due after the agreement ends?\",\"answer\":\"An original and two copies must be submitted no later than 90 days following the expiration or termination of the financial assistance agreement.\"},{\"question\":\"What minimum information must the Final Report include?\",\"answer\":\"At a minimum, it must describe project completion, quantify project benefits, and comply with applicable requirements under 43 CFR 12.80 or 12.951.\"}]","WaterSMART Grants Final Report Format - Instructions | PDF",1789207097]