[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-306603-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-306603-en":126},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","waters-freiberg","Waters-Freiberg","","Applicant identification and project intake fields collect the applicant, consultant, contractor details, mailing addresses, and contact information. The form records a project purpose describing installation of a pier and kayak access facilities, plus optional appendices to include docking facilities, ramps, road crossings, channel modifications, utilities, and related wetland or stormwater items. It captures project location, waterbody characteristics, zoning placeholders, tax parcel information, driving directions, and additional owner lists within required radii. A permit processing section and a signature/agent authorization page support submission to relevant agencies.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/forms/","Forms",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/waters-freiberg/306603/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/waters-freiberg/306603.png","ImageObject",442,249,{"name":42,"@type":43},"Bintang","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-22","2026-09-19",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",11,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What information is collected in the applicant identification section?","Question",{"text":63,"@type":64},"It collects the applicant’s name, mailing address, consultant and contractor names, mailing addresses, and telephone and email contacts, along with company information where applicable.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What project purpose and facilities does the form describe?",{"text":68,"@type":64},"It describes installing a 4' x 40' pier to access water, adding a kayak launch for loading and unloading, and providing storage when not using the kayaks.",{"name":70,"@type":61,"acceptedAnswer":71},"What project location details and waterbody characteristics are required?",{"text":72,"@type":64},"It requires the project site address, tax parcel ID, subdivision name, driving directions, the waterbody name and its larger waterbody relationship, and whether the waterbody is non-tidal, including an approximate width value.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},306603,1790858676,{"code":4,"msg":82,"data":83},"success",[84,88,93,98,103,108,112,117,122],{"id":55,"doc_module":22,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Presentations",90,"presentations",{"id":89,"doc_module":22,"doc_module_name":25,"category_name":90,"show_sort_weight":91,"slug":92},12,"Resumes",80,"resumes",{"id":94,"doc_module":22,"doc_module_name":25,"category_name":95,"show_sort_weight":96,"slug":97},14,"Invoices",70,"invoices",{"id":99,"doc_module":22,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},15,"Posters",60,"posters",{"id":104,"doc_module":22,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},16,"Social Media",50,"social-media",{"id":109,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":110,"slug":111},17,40,"forms",{"id":113,"doc_module":22,"doc_module_name":25,"category_name":114,"show_sort_weight":115,"slug":116},18,"Letters",30,"letters",{"id":118,"doc_module":22,"doc_module_name":25,"category_name":119,"show_sort_weight":120,"slug":121},21,"Paper Templates",5,"papers-templates",{"id":123,"doc_module":22,"doc_module_name":25,"category_name":124,"show_sort_weight":4,"slug":125},158,"General","general-158",{"code":4,"msg":82,"data":127},{"doc_id":79,"user_id":128,"nickname":42,"user_avatar":129,"doc_module":22,"category_id":109,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":94,"language":135,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":12,"update_tm":139,"read_time":120},962085564381,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","Section 1: Applicant Identification  \n1. Applicant’s Name:  Joan Waters Freiberg   \nMailing Address:  154 Farmhouse Dr. , Norristown, PA 19403   \n_______________________________________________  \n_______________________________________________  \n2. Consultant’s Name:  Kay_la  Short____________________  \nMailing Address: _12010  Industrial_Park_Rd._, _____________________Unit_11 , _Bishoville,  MD  21_813   \n______________________________________________  \n3. Contractor’s Name:   Mailing Address:    \n______________________________________________  \n______________________________________________  \nTelephone \\#:  610-416-4954  Fax \\#:  \nE-mail: [jwaters@cofcogroup.com](jwaters@cofcogroup.com)  \nCompany Name:  Pristine Permitting, LLC Telephone \\#: 443-614-8477  Fax \\#:  [E-mail:](E-mail: kayla@pristinepermitting.com)[ kayla@pristinepermitting.com](E-mail: kayla@pristinepermitting.com)  \nCompany Name:   Telephone \\#:  Fax \\#:   E-mail:   \nSection 2: Project Description  \n4. Check those that apply:  \nProject/addition to existing project? /Replace existing structure? (If checked, must answer \\#16)  \n5. Project Purpose (attach additional sheets as necessary):  \n33' 6\"  \nInstall a 4' x 40' Pier to access water and install (1) Kayak Launch to allow for ease to load on and off of kayaks and provide  \nstorage for the kayak when not using.  \n____________________________________________________________________________________________________  \n____________________________________________________________________________________________________  \n6. Check each Appendix that is enclosed with this application:  \n\n| X | A. Boat Docking Facilities |  | G. Bulkheads |  | N. Preliminary Marina Checklist |\n| --- | --- | --- | --- | --- | --- |\n|  | B. Boat Ramps |  | H. Fill |  | O. Marinas |\n|  | C. Road Crossings |  | I. Rip-Rap Sills and Revetments |  | P. Stormwater Management |\n|  | D. Channel Modifications/Dams |  | J. Vegetative Stabilization |  | Q. Ponds and Impoundments |\n|  | E. Utility Crossings |  | K. Jetties, Groins, Breakwaters |  | R. Maintenance Dredging |\n|  | F. Intake or Outfall Structures |  | M. Activities in State Wetlands |  | S. New Dredging |\n\nSection 3: Project Location  \n7. Project Site Address:  23742 Herring Reach Ct. , Lewes   \n DE 19958   \nCounty:   \nSite owner name (if different from applicant):  Same  Address of site owner:  Same   \n8. Driving Directions: Turn right onto Angola Rd, Turn right onto Rd 278/Angola Beach Rd, Turn left onto Herring View Rd , Turn left onto Inlet Breeze Dr Turn right onto Herring Reach Ct, Destination will be on the right  \n(Attach a vicinity map identifying road names and the project location)  \n9. Tax Parcel ID Number:  234-18.00-706.00  Subdivision Name:  The Village at Herring Creek   \n\n| WSLS Use Only: Permit \\#s:    \u003Cbr>Type      | ____________ ____________\u003Cbr>|\n| --- | --- |\n| Corps Permit: SPGP 18 20 Nationwide Permit \\#:   Individual Permit \\#  Received Date:   Project Scientist:   Fee Received? Yes  No  Amt: $  Receipt \\#:  \u003Cbr>Public Notice \\#:   Public Notice Dates: ON   OFF   |  |\n\nSection 3: Project Location (Continued)  \n10. Name of waterbody at Project Location:  Herring Creek  waterbody is a tributary to:  Rehoboth Bay   \n11. Is the waterbody: Non-tidal Waterbody width at mean low or ordinary high water  Apx. 2 ,000   \n12. Is the project:  \nFederally-regulated wetlands?  \n*If the project is on private subaqueous lands, provide the name of the subaqueous lands owner:  \n____________________________________________________________________________________________________  \n(Written permission from the private subaqueous lands owner must be included with this application)  \n13. Present Zoning:  \nSection 4: Miscellaneous  \n14. A. List the names and complete mailing addresses of the immediately adjoining property owners on all sides of the project (attach additional sheets as necessary):  \n________________________________________________________________________________________","cbCailXM1TeGD8ER","https://ap.wps.com/l/cbCailXM1TeGD8ER","pdf",6065007,"English","# Applicant Identification\n# Project Description\n# Project Location\n# Miscellaneous\n# Signature Page","[{\"question\":\"What information is collected in the applicant identification section?\",\"answer\":\"It collects the applicant’s name, mailing address, consultant and contractor names, mailing addresses, and telephone and email contacts, along with company information where applicable.\"},{\"question\":\"What project purpose and facilities does the form describe?\",\"answer\":\"It describes installing a 4' x 40' pier to access water, adding a kayak launch for loading and unloading, and providing storage when not using the kayaks.\"},{\"question\":\"What project location details and waterbody characteristics are required?\",\"answer\":\"It requires the project site address, tax parcel ID, subdivision name, driving directions, the waterbody name and its larger waterbody relationship, and whether the waterbody is non-tidal, including an approximate width value.\"}]","Waters-Freiberg | PDF",1789838751]