[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-280005-105":53,"doc-detail-280005-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","wac-296-14-6238-payment-and-required-documents-for-residence-modifications","WAC 296-14-6238 - Payment and Required Documents for Residence Modifications","","Explains how payment is handled for approved and completed residence modifications, including direct payment to the contractor and/or reimbursement to a worker for payments already made. Details the conditions for releasing final payment by listing specific documents the department requires, such as a signed letter of satisfaction from the worker, final inspection reports from the relevant inspection authorities when required, an inspection report from the residence modification consultant when requested, and a release of lien form signed by contractors or subcontractors.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":41,"@type":70,"position":76},"https://docshare.wps.com/template/letters/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/wac-296-14-6238-payment-and-required-documents-for-residence-modifications/280005/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/wac-296-14-6238-payment-and-required-documents-for-residence-modifications/280005.png","ImageObject",442,249,{"name":88,"@type":89},"Melati","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-18","2026-09-16",true,{"@type":98,"interactionType":99,"userInteractionCount":8},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"How does the department pay for approved residence modifications?","Question",{"text":108,"@type":109},"The department pays the contractor directly and/or reimburses the worker for payments already made to the contractor.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What documents are required before the department releases final payment?",{"text":113,"@type":109},"The department requires a signed letter of satisfaction from the worker, relevant final inspection results (if required), an inspection report from the residence modification consultant (if requested), and a release of lien form signed by the contractor(s).",{"name":115,"@type":106,"acceptedAnswer":116},"When are final inspection and consultant inspection reports required?",{"text":117,"@type":109},"A final inspection report is required when the department requires it, and a residence modification consultant inspection report is required if the department requests it.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},280005,1790494198,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":40,"category_name":41,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":8,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":4},962085570644,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","WAC 296-14-6238 Who receives payment from the department? The department will pay the contractor directly and/or reimburse the worker for any payment already made to the contractor for approved and completed residence modifications . In order to determine that modifications have been satisfactorily completed, the department will require the following documents to be submitted before releasing final payment:  \n(1) A signed letter of satisfaction from the worker; and  \n(2) A positive report of a final inspection from the appropriate inspection authorities, if required; and  \n(3) A report of an inspection from the residence modification consultant if requested by the department; and  \n(4) A release of lien form signed by the contractors or subcontractors or both .  \n[Statutory Authority: RCW 51 .04 .010, 51 .04 .020, 51 .32 .240, and 2005 c 411. WSR 06-06-065, § 296-14-6238, filed 2/28/06, effective 4/1/06 . ]  \nCertified on 2/20/2023 WAC 296-14-6238 Page 1","cbCaihpeDe9AExCU","https://ap.wps.com/l/cbCaihpeDe9AExCU","pdf",228088,"English","# Who receives payment from the department?\n## Required documents before releasing final payment","[{\"question\":\"How does the department pay for approved residence modifications?\",\"answer\":\"The department pays the contractor directly and/or reimburses the worker for payments already made to the contractor.\"},{\"question\":\"What documents are required before the department releases final payment?\",\"answer\":\"The department requires a signed letter of satisfaction from the worker, relevant final inspection results (if required), an inspection report from the residence modification consultant (if requested), and a release of lien form signed by the contractor(s).\"},{\"question\":\"When are final inspection and consultant inspection reports required?\",\"answer\":\"A final inspection report is required when the department requires it, and a residence modification consultant inspection report is required if the department requests it.\"}]","WAC 296-14-6238 - Payment and Required Documents for Residence Modifications | PDF",1789531813]