[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-283790-105":3,"doc-detail-283790-en":81,"detail-sidebar-cat-1-en-105":99},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","utility-emergency-plan-utility-emergency-emergency-plan-guide","UTILITY EMERGENCY PLAN - Utility Emergency - Emergency Plan Guide","","This utility emergency plan defines clear purpose and scope for managing utility-related incidents, focusing on coordinated supervision and safe facility evacuation. It specifies behavioral safety steps during power outages inside ITS and at customer sites, including stopping work, adjusting to lighting, moving to designated gathering areas, and remaining in place until power is restored. It also provides equipment guidance for guiding employees, and includes gas line rupture/release notification and evacuation actions, followed by competency requirements and orderly evacuation expectations.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/letters/","Letters",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/utility-emergency-plan-utility-emergency-emergency-plan-guide/283790/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/utility-emergency-plan-utility-emergency-emergency-plan-guide/283790.png","ImageObject",442,249,{"name":42,"@type":43},"Blaney","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-20","2026-09-17",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",8,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the purpose and scope of the Utility Emergency Plan?","Question",{"text":63,"@type":64},"The plan provides direction and responsibility during a utility emergency, and it assigns supervisors the responsibility to coordinate the program and ensure safe evacuation with support from the Vice President of Operations.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What should Team Members do during a power outage inside the ITS facility?",{"text":68,"@type":64},"Team Members must stop work, remain at their workstation, and allow their vision to adjust to lighting. Anyone operating a lift truck or aerial lift must stop the vehicle and wait for supervisor instructions to move to the gathering areas.",{"name":70,"@type":61,"acceptedAnswer":71},"How should a suspected gas leak or gas line rupture be handled?",{"text":72,"@type":64},"If an employee detects the odor of a potential gas leak, they must notify their Supervisor immediately. The Supervisor calls 911, evacuates team members, and notifies the Vice President of Operations; evacuation follows the plant route layout and customer gathering areas if offsite.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},283790,1790098086,{"code":4,"msg":82,"data":83},"success",{"doc_id":79,"user_id":84,"nickname":42,"user_avatar":85,"doc_module":22,"category_id":86,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":87,"file_id":88,"file_url":89,"file_type":90,"file_size":91,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":92,"language":93,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":94,"faqs":95,"seo_title":96,"seo_description":12,"update_tm":97,"read_time":98},1236954677761,"https://us-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d",18,"Emergency Contact Information  \nOwner  \nVice President of OperaƟons Director of OperaƟons  \nDirector of Finance/Admin Steel Superintendent Electrical Superintendent Mechanical Superintendent Sr. Project Manager  \nSr. Project Manager  \nProject Manager  \nProject Manager  \nAsst. Project Manager  \nUƟlity Contacts  \nSemco Energy  \nDTE  \nSteve Pierik  \nJohn Stolz  \nTim Harms  \nAndy Magnuson Richie Paull Chuck Snyder Jesse Allen  \nKeith Griﬃth  \nScoƩ Humes  \nBrent Eggebrecht Aaron Welsh  \nChad Osentoski  \nGas Company  \nAccount Number  \nElectric Company  \nAccount Number  \n(810) 434-1206  \n(734) 645-6438  \n(810) 941-5232  \n(586) 770-9490  \n(810) 956-7911  \n(575) 749-6327  \n(810) 751-0878  \n(586) 212-6455  \n(810) 941-8946  \n(989) 213-5142  \n(810) 705-7560  \n(810) 358-9023  \n(888) 427-1427  \n6860 291 0001 9  \n(800) 477-4747 0046491.50  \nRevised: 05/11/2021  \n| EMERGENCY PLAN:\u003Cbr>Utility Emergency | Revision Date: 4/13/21 | Approval: Safety Committee |\n| --- | --- | --- |\n\nUTILITY EMERGENCY PLAN  \n1. PURPOSE  \n1. The purpose of this plan is to provide direction and responsibility in the event of a utility emergency.  \n2. SCOPE  \n1. It is the responsibility of all supervisors, with the support of the Vice President of Operations, to coordinate this program and ensure a safe evacuation of the facility.  \n3. SAFETY  \n1. No PPE is required to ensure safe evacuation.  \n2. When inside the ITS facility, all Team Members will stop what they are doing and allow their vision to adjust to lighting. Team Members are to remain at their current location until instructed by the Supervisor to move to the gathering areas. These areas are listed below:  \n• Steel Shop Personnel Break Room  \n• Office Personnel Front Lobby  \n3. When at a customer’s facility, all Team Members will stop what they are doing and allow their vision to adjust to lighting. Team Members are to remain at their current location until instructed by Supervisor to move to the predetermined gathering area.  \n4. Personnel will remain at these locations until power is recovered. At the time power is recovered, all personnel will return to their assigned work areas. If working offsite at a customer facility, please report to the customer gathering area.  \n4. EQUIPMENT  \n1. A member of the shop team will board the lift truck and turn the lights on to help guide employees to the designated area.  \n5. INSTRUCTIONS  \n1. Initial actions during power outage inside ITS facility:  \n1. Team Members are to stop what they are doing and remain at their workstation until instructed by Supervisor for action to take. Any team member operating a lift truck or aerial lift will stop their vehicle.  \n2. Supervisor will turn off main disconnects on equipment being used. Supervisor will determine whether power outage is internal or external. After determination is made, Supervisor will then call Detroit Edison (800) 477-4747 to alert them of power outage and to get what information may be available if external.  \n3. Supervisor will contact the VP of Operations and give notification of power outage. VP of Operations will make final decision of when and if employees are to be sent home.  \n2. Initial actions during power outage inside customer’s facility:  \n1. Team Members are to stop what they are doing and remain at their workstation until instructed by Supervisors for action to take. Any Team Member operating a lift truck or aerial lift will stop the vehicle.  \n2. Supervisors will instruct team members to follow customer’s on-site emergency power outage action plan.  \n| EMERGENCY PLAN:\u003Cbr>Utility Emergency | Revision Date: 4/13/21 | Approval: Safety Committee |\n| --- | --- | --- |\n\n3. If no plan exists and it is safe to do so, exit the building with your Team Members and call your Superintendent and site contact for further instruction.  \n3. Gas line rupture/release action plan:  \n1. Release notification: If an employee detects the odor of a potential gas leak, he/she is to immediately notify their Supervisor. Su","cbCaiiZJpZx7AsCQ","https://ap.wps.com/l/cbCaiiZJpZx7AsCQ","pdf",2190854,59,"English","# UTILITY EMERGENCY PLAN\n## PURPOSE\n## SCOPE\n## SAFETY\n## EQUIPMENT\n## INSTRUCTIONS\n## DEFINITIONS\n## COMPETENCY","[{\"question\":\"What is the purpose and scope of the Utility Emergency Plan?\",\"answer\":\"The plan provides direction and responsibility during a utility emergency, and it assigns supervisors the responsibility to coordinate the program and ensure safe evacuation with support from the Vice President of Operations.\"},{\"question\":\"What should Team Members do during a power outage inside the ITS facility?\",\"answer\":\"Team Members must stop work, remain at their workstation, and allow their vision to adjust to lighting. Anyone operating a lift truck or aerial lift must stop the vehicle and wait for supervisor instructions to move to the gathering areas.\"},{\"question\":\"How should a suspected gas leak or gas line rupture be handled?\",\"answer\":\"If an employee detects the odor of a potential gas leak, they must notify their Supervisor immediately. The Supervisor calls 911, evacuates team members, and notifies the Vice President of Operations; evacuation follows the plant route layout and customer gathering areas if offsite.\"}]","UTILITY EMERGENCY PLAN - Utility Emergency - Emergency Plan Guide | PDF",1789619513,21,{"code":4,"msg":82,"data":100},[101,106,111,116,121,126,131,134,138],{"id":102,"doc_module":22,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},11,"Presentations",90,"presentations",{"id":107,"doc_module":22,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},12,"Resumes",80,"resumes",{"id":112,"doc_module":22,"doc_module_name":25,"category_name":113,"show_sort_weight":114,"slug":115},14,"Invoices",70,"invoices",{"id":117,"doc_module":22,"doc_module_name":25,"category_name":118,"show_sort_weight":119,"slug":120},15,"Posters",60,"posters",{"id":122,"doc_module":22,"doc_module_name":25,"category_name":123,"show_sort_weight":124,"slug":125},16,"Social Media",50,"social-media",{"id":127,"doc_module":22,"doc_module_name":25,"category_name":128,"show_sort_weight":129,"slug":130},17,"Forms",40,"forms",{"id":86,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":132,"slug":133},30,"letters",{"id":98,"doc_module":22,"doc_module_name":25,"category_name":135,"show_sort_weight":136,"slug":137},"Paper Templates",5,"papers-templates",{"id":139,"doc_module":22,"doc_module_name":25,"category_name":140,"show_sort_weight":4,"slug":141},158,"General","general-158"]