[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-255184-105":53,"doc-detail-255184-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","update-gopher-resource-epa-section-114-request-email","Update Gopher Resource EPA Section 114 Request - Email","","High-importance email updating deadlines for an EPA Section 114 information request tied to hazardous air pollutant emissions at the Gopher Resources facility in Tampa, Florida. The recipient cannot approve a January 22, 2024 extension request, but grants an extension through close of business January 15, 2024 to prepare facility responses. Stack test protocols, fenceline monitoring protocols, and Enclosure 1 responses are due January 15, 2024, and a cover letter enclosure table error is corrected with Enclosure 4 attached.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":41,"@type":70,"position":76},"https://docshare.wps.com/template/letters/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/update-gopher-resource-epa-section-114-request-email/255184/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/update-gopher-resource-epa-section-114-request-email/255184.png","ImageObject",442,249,{"name":88,"@type":89},"Maeve","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-21","2026-09-13",true,{"@type":98,"interactionType":99,"userInteractionCount":47},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What extension is granted for the EPA Section 114 request?","Question",{"text":108,"@type":109},"The email states the January 22, 2024 extension requests cannot be approved due to schedule constraints, but an extension is granted through close of business January 15, 2024.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"Which items are due by January 15, 2024?",{"text":113,"@type":109},"Stack test protocols, fenceline monitoring protocols, and enclosure 1 responses are due January 15, 2024.",{"name":115,"@type":106,"acceptedAnswer":116},"What correction was made to the cover letter enclosure table?",{"text":117,"@type":109},"The email notes an error in the enclosure table and indicates the corrected enclosure table is provided, with the correct Enclosure 4 attached.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},255184,1790812717,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":40,"category_name":41,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":47,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":76,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":9},5909877438554,"https://ap-avatar.wpscdn.com/avatar/5600025385ad2bf12a7?_k=1778553567797529272","From: Wright, Amber  \nSent: Monday, November 20, 2023 4:27 PM  \nTo: [angela.fogarty@gopherresource.com](angela.fogarty@gopherresource.com); [toni.presnell@gopherresource.com](toni.presnell@gopherresource.com); Maytal Chai \u003C [Maytal.Chai@GopherResource.com](Maytal.Chai@GopherResource.com)>  \nCc: [david.read@dep.state](david.read@dep.state).ﬂ . us; DeLaquil, Mark \u003C[mdelaquil@bakerlaw.com](mdelaquil@bakerlaw.com)>; French, Chuck \u003C [French.Chuck@epa.gov](French.Chuck@epa.gov)>; Summers-Evans, Jacqueline \u003C[SummersEvans.Jacqueline@epa.gov](SummersEvans.Jacqueline@epa.gov)>; Hansen, Amanda \u003C [Hansen.Amanda@epa.gov](Hansen.Amanda@epa.gov)>; Bivens, Robert \u003C [Bivens.Robert@epa.gov](Bivens.Robert@epa.gov)>;  \nLowe, Theresa (she/her/hers) \u003C [Lowe.Theresa@epa.gov](Lowe.Theresa@epa.gov)> Subject: Update Gopher Resource EPA Section 114 Request  \nImportance: High  \nHi All,  \nIn response to the Association of Battery Recyclers extension request: We cannot approve the January 22, 2024, extension requests due to schedule constraints. However, we can grant an extension to close of business January 15th, 2024. This date will allow aﬀected facilities additional time to develop their responses while allowing the EPA to meet our scheduled timelines. Stack test protocols, fenceline monitoring protocols and enclosure 1 responses are now due January 15th, 2024.  \nAdditionally, there was an error in the cover letter enclosure table please see the corrected cover letter table below. The correct enclosure 4 is attached. Site speciﬁc test plans were provided in the initial cover letters.  \n\n| Enclosure \\# | Description |\n| --- | --- |\n| Enclosure 1 | Facility Questionnaires for Secondary Lead Smelting |\n| Enclosure 2 | Source Testing Request for Secondary Lead Smelting |\n| Enclosure 3 | EPA’s Information Gathering Authority (Section 114 of the CAA) |\n| Enclosure 4 | Emissions as CBI |\n| Enclosure 5 | Summary of Contractor’s Authority as Representative of EPA |\n| Enclosure 6 | Certiﬁcation statement |\n\n\n| Enclosure 7 | ERG Contractor Designation Letter. |\n| --- | --- |\n| Enclosure 8 | Example EPA ERT Version 6 Test Plan |\n\nPlease conﬁrm receipt of this email and acknowledge the new deadlines. Sincerely,  \nFrom: Wright, Amber  \nSent: Monday, November 6, 2023 9:51 AM  \nTo: [angela.fogarty@gopherresource.com](angela.fogarty@gopherresource.com); [toni.presnell@gopherresource.com](toni.presnell@gopherresource.com)  \nCc: [david.read@dep.state](david.read@dep.state).ﬂ . us; DeLaquil, Mark \u003C[mdelaquil@bakerlaw.com](mdelaquil@bakerlaw.com)>; French, Chuck \u003C [French.Chuck@epa.gov](French.Chuck@epa.gov)>; Summers-Evans, Jacqueline \u003C[SummersEvans.Jacqueline@epa.gov](SummersEvans.Jacqueline@epa.gov)>; Hansen, Amanda \u003C [Hansen.Amanda@epa.gov](Hansen.Amanda@epa.gov)>; Bivens, Robert \u003C [Bivens.Robert@epa.gov](Bivens.Robert@epa.gov)>;  \nLowe, Theresa (she/her/hers) \u003C [Lowe.Theresa@epa.gov](Lowe.Theresa@epa.gov)> Subject: Gopher Resource EPA Section 114 Request  \nImportance: High  \nDear Ms. Fogarty,  \nPursuant to section 114 of the Clean Air Act, the EPA is collecting information related to hazardous air pollutant emissions at the Gopher Resources facility located at 6505 Jewel Avenue Tampa, FL 33619We are requesting information and data to support the development of amendments for the Secondary Lead Smelting National Emission Standards for Hazardous Air  \nPollutants, 40 CFR part 63, subpart X. Attached to this email are eleven ﬁles, which include: Cover Letter, Enclosures 1-8, and a response spreadsheets for Enclosure 1 and fenceline monitoring data. Please note each facility is NOT required to complete all testing in Enclosure 2-reference the attached cover letter for SITE SPECIFIC testing. Details related to the testing schedule can be found in Section 4.3 of Enclosure 2.  \nPlease reply to this email to conﬁrm receipt of the letter and attachments. If you have any questions, please feel free to call or email me.","cbCaipwnENoAIaNb","https://ap.wps.com/l/cbCaipwnENoAIaNb","pdf",147964,"English","# Deadline and extension update\n## Corrected cover letter enclosures\n## Updated due dates for submissions","[{\"question\":\"What extension is granted for the EPA Section 114 request?\",\"answer\":\"The email states the January 22, 2024 extension requests cannot be approved due to schedule constraints, but an extension is granted through close of business January 15, 2024.\"},{\"question\":\"Which items are due by January 15, 2024?\",\"answer\":\"Stack test protocols, fenceline monitoring protocols, and enclosure 1 responses are due January 15, 2024.\"},{\"question\":\"What correction was made to the cover letter enclosure table?\",\"answer\":\"The email notes an error in the enclosure table and indicates the corrected enclosure table is provided, with the correct Enclosure 4 attached.\"}]","Update Gopher Resource EPA Section 114 Request - Email | PDF",1789286901]