[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-245616-105":53,"doc-detail-245616-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","two-week-look-ahead-construction-schedule-construction-work-plan","Two-Week Look-Ahead Construction Schedule - Construction Work Plan","","Two-week look-ahead construction schedule for the Green Infrastructure Project in Washington DC, detailing project scope, locations, and contractor roles under contract DCKA-2016-B-0016. The table assigns responsibility and task descriptions across dates July 17–29, 2017, including excavation, installation of curb and gutter, L-walls, check dams, aggregates, geotextile, underdrain systems, geofabrics, permeable pavers, and grading. Remarks specify phase groupings and BMP references, with notes marking scheduled day/night work and weekend/night work requests.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/two-week-look-ahead-construction-schedule-construction-work-plan/245616/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/two-week-look-ahead-construction-schedule-construction-work-plan/245616.png","ImageObject",442,249,{"name":88,"@type":89},"\tJames","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-20","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":8},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What time period does the look-ahead schedule cover?","Question",{"text":108,"@type":109},"It covers July 17–29, 2017, across day and night time slots.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"Which task locations and task orders are included?",{"text":113,"@type":109},"It lists Task Order 1 (Fort Davis, Q St SE & Fort Dupont St SE) and Task Order 2 (LeDroit Park), with multiple locations shown in Washington DC.",{"name":115,"@type":106,"acceptedAnswer":116},"How do the schedule notes indicate work timing?",{"text":117,"@type":109},"Notes specify “X Scheduled Work (Day)” and “X Scheduled Work (Night)”, and state that weekend and night work will be requested.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},245616,1791743921,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":8,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":4},2336474466412,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","| TWO‐ WEEK LOOK‐ AHEAD CONSTRUCTION SCHEDULE |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- |\n| PROJECT: Green Infrastructure Project | LOCATION:\u003Cbr>Various Locations, Washington DC | CAPITOL PAVING OF DC, INC. | 2211 Channing St NE Washington DC 20018 | District Department of Transportation | 55 M St. SE, Washington DC 20003 |\n| CONTRACT: DCKA‐2016‐B‐0016 |  |  |  |  |  |\n\n\n|  |  | July 17‐29, 2017 |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| Responsibility | TASK / DESCRIPTION OF WORK | 7/17 |  | 7/18 |  | 7/19 |  | 7/20 |  | 7/21 |  | 7/22 |  | 7/24 |  | 7/25 |  | 7/26 |  | 7/27 |  | 7/28 |  | 7/29 |  | REMARKS |\n|  |  | MON |  | TUE |  | WED |  | THU |  | FRI |  | SAT |  | MON |  | TUE |  | WED |  | THU |  | FRI |  | SAT |  |  |\n|  |  | DAY | NIGHT | DAY | NIGHT | DAY | NIGHT | DAY | NIGHT | DAY | NIGHT | DAY | NIGHT | DAY | NIGHT | DAY | NIGHT | DAY | NIGHT | DAY | NIGHT | DAY | NIGHT | DAY | NIGHT |  |\n| TASKT ORDER 1 : Fort Davis , Q St SE & Fort Dupont St SE |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| Capitol Paving | Excavation & Installation of Curb & Gutter, L‐Walls, Check Dams | X |  | X |  | X |  | X |  | X |  |  |  | X |  | X |  |  |  |  |  |  |  |  |  | Phase 3 |\n| Fort Myer | Excavation and Installation of Aggregates, Geotextile (Permeable Pavers) |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | X |  |  |  |  |  |  |  | Phase 1 & Phase 3 |\n| Fort Myer | Installation of Permeable Pavers |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | X |  | X |  |  |  | Phase 1 & Phase 3 |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| TASK ORDER 2: LeDroit Park |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| Fort Myer | Install Driveway and Final Grading (Aggregates) | X |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | BMP\\#5, Oakdale Alley |\n| Fort Myer | Excavation, Installation of Geofabrics, Underdrain, and Aggregates | X |  | X |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | BMP\\#5, Oakdale Alley |\n| Fort Myer | Installation of Permeable Pavers (BMP\\#5) |  |  |  |  | X |  | X |  | X |  |  |  | X |  | X |  |  |  |  |  |  |  |  |  | BMP\\#5, Oakdale Alley |\n| Capitol Paving | Excavation, Installation of Geofabrics, Underdrain, and Aggregates |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  | X |  | X |  | X |  |  |  | BMP\\#2, V St NW |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n\n\n| NOTES: |  X  Scheduled Work (Day)\u003Cbr> X  Scheduled Work (Night)\u003Cbr>WEEKEND & NIGHT WORK WILL BE REQUESTED |\n| --- | --- |\n\n1 of 1 GMAvila","cbCaijsKQECQ02nt","https://ap.wps.com/l/cbCaijsKQECQ02nt","pdf",92047,"English","# Responsibility\n## Task / Description of Work\n## Scheduled Work and Remarks","[{\"question\":\"What time period does the look-ahead schedule cover?\",\"answer\":\"It covers July 17–29, 2017, across day and night time slots.\"},{\"question\":\"Which task locations and task orders are included?\",\"answer\":\"It lists Task Order 1 (Fort Davis, Q St SE \\u0026 Fort Dupont St SE) and Task Order 2 (LeDroit Park), with multiple locations shown in Washington DC.\"},{\"question\":\"How do the schedule notes indicate work timing?\",\"answer\":\"Notes specify “X Scheduled Work (Day)” and “X Scheduled Work (Night)”, and state that weekend and night work will be requested.\"}]","Two-Week Look-Ahead Construction Schedule - Construction Work Plan | PDF",1789229951]