[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-172524-105":53,"doc-detail-172524-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","transformation-plan-instructions-eqip-milestone-1","Transformation Plan Instructions - eQIP Milestone 1","","Transformation Plan instructions for Grantees detailing how to prepare and transform organizational health IT practice to maximize program investments and achieve defined outcomes and milestones. The plan must expand on proposal narrative and address required A-EMRAM functionalities across Stages 1–3 and Stages 4–5, plus health information exchange elements. It includes guidance for outcome measures, gap analysis, impacted workflows, MeHI HIE Use Case Development (Attachment 3), timelines (Tables 3–4), and attachments covering current and future IT state analyses with product lists and diagrams.",{"@graph":63,"@context":123},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/transformation-plan-instructions-eqip-milestone-1/172524/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/transformation-plan-instructions-eqip-milestone-1/172524.png","ImageObject",442,249,{"name":88,"@type":89},"Alex Sinclair","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-19","2026-09-01",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",13,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115,119],{"name":106,"@type":107,"acceptedAnswer":108},"What must the Transformation Plan include for eQIP Milestone 1?","Question",{"text":109,"@type":110},"It must provide a detailed description of how the organization will prepare and transform its practice to maximize health IT investments, achieve identified outcomes, and meet program milestones, with a comprehensive analysis.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"Which A-EMRAM stages and milestone elements must the plan address?",{"text":114,"@type":110},"The plan must incorporate updated details and address required functionalities for A-EMRAM Stages 1–3 (Milestone 2), Stages 4–5 (Milestone 3), and elements required for health information exchange (Milestone 4).",{"name":116,"@type":107,"acceptedAnswer":117},"How should outcome measures be specified in the plan?",{"text":118,"@type":110},"For Table 1, list up to four operational and/or clinical outcome measure targets, including descriptions, baseline values, target values, and target dates, using provided outcome measure definitions.",{"name":120,"@type":107,"acceptedAnswer":121},"What information is required in the attachments for current and future IT state?",{"text":122,"@type":110},"Attachment 1 requires current health IT products (Table 5) and a diagram plus narrative tying the product list to internal integration. Attachment 2 requires the desired future state products (Table 6) and a diagram for anticipated health information and supporting technologies.","https://schema.org",{"og:url":78,"og:type":125,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":127,"canonical":78},"index,follow",{"doc_id":129,"site_id":56},172524,1791313661,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":88,"user_avatar":134,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":140,"language":141,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":142,"faqs":143,"seo_title":144,"seo_description":61,"update_tm":145,"read_time":76},1099523882182,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","Transformation Plan Instructions\neQIP Milestone 1 requires Grantees to submit an acceptable Transformation Plan and HIway Use Case that is approved by MeHI. The Transformation Plan must provide a detailed description of how your Organization will prepare and transform its practice to maximize its investments in health IT in order to achieve identified outcomes and meet Program Milestones. The Plan is expected to be very comprehensive, demonstrating a detailed and thorough analysis.\nThe Transformation Plan should incorporate updated details and expand on elements of your Organization’s approach, as was outlined in the narrative submitted with your proposal.  This approach is expected to address all required functionalities of A-EMRAM Stages 1–3 (Milestone 2), and A-EMRAM Stages 4–5 (Milestone–3) in all of the clinical care facilities that you submitted for the A-EMRAM survey and for which you received a score and Gap Assessment, as well as elements required for health information exchange (Milestone 4).\nPlease follow the template outline and do not omit any sections or attachments. Please also keep Attachments 1, 2, and 4 in the body of this document.\nApproach\nOperational and/or clinical outcomes [Table 1 below]\u000bIn Table 1, please list, describe, and estimate the target values and completion dates for the significant operational and/or clinical outcomes being pursued – and that will be measured – under this Grant, using the following definitions:\nOutcome measure: [List no more than 4] the operational and/or clinical outcome measures you intend to address (e.g., % increase of care summaries shared back to referring providers).  NOTE: these are not the same as your activities listed in Section II: Grant Milestones, subsection 1. Project Phases (below);\nDescription:  provide details needed to clarify or further scope the measure;\nBaseline: if measured today, what would be the value for this measure? (e.g., 10% of care summaries are shared back to referring providers);\nTarget Value: when measured at the end of this Grant period, what are you projecting will be the value for this measure? (e.g., 30% of care summaries are shared back to referring providers); and\nTarget Dates:  the dates by which you intend to meet your target values;\nTable 1: Outcome Measures\nDescription of how the Organization’s planned advancements in the use of health IT will support achieving those identified operational and/or clinical outcomes that you listed in Table 1 [narrative];\nGrant Milestones\u000bDescribe the Organization’s approach to meeting each of the Grant milestones, including:\nProject Phases [narrative] \u000bA description of the approach that breaks the project into phases. Phases may be aligned to milestones or some other preferred grouping of activities, for example:\nPhase 1 = Procure/implement EHR [description],\nPhase 2 = Achieving A-EMRAM Stages 1 through 3 [description],\nPhase 3 = Achieving A-EMRAM Stages 4 and 5 [description].\nGap Analysis [Table 2 below] \u000bIn Table 2, provide a description of how the Grantee will address each A-EMRAM criteria marked as a “no,” so it may be reassessed and switched to a “yes.”  Please also provide a detailed description of how your organization will address each identified gap to meet the required functionality.\nTable 2: Analysis of existing gaps and intended action plan\nImpacted Workflows [narrative] \u000bDescribe anticipated workflows that will be impacted and/or changed during the Organization’s transition to the future state of health IT (e.g.,  transition in billing procedures from old system to new system), and describe how the Organization will facilitate the change.\nMeHI HIE Use Case Development Form [Form, Attachment 3]\u000bComplete the MeHI Use Case Development form – Attachment 3.\nDescription of the strategy, policies and procedures that the Organization will employ to protect its electronic health information, including how staff will be trained to ensure the privacy and security of electronic patient health infor","cbCaiu7VoDjWJBMi","https://ap.wps.com/l/cbCaiu7VoDjWJBMi","docx",37239,7,"English","# Approach\n## Operational and/or clinical outcomes（Table 1）\n## Grant Milestones\n## Gap Analysis（Table 2）\n## Impacts on Workflows\n## MeHI HIE Use Case Development Form（Attachment 3）\n## Timelines（Table 3、Table 4）\n# Attachments\n## Attachment 1：Current State Analysis（Table 5）\n## Attachment 2：Future State Analysis（Table 6）","[{\"question\":\"What must the Transformation Plan include for eQIP Milestone 1?\",\"answer\":\"It must provide a detailed description of how the organization will prepare and transform its practice to maximize health IT investments, achieve identified outcomes, and meet program milestones, with a comprehensive analysis.\"},{\"question\":\"Which A-EMRAM stages and milestone elements must the plan address?\",\"answer\":\"The plan must incorporate updated details and address required functionalities for A-EMRAM Stages 1–3 (Milestone 2), Stages 4–5 (Milestone 3), and elements required for health information exchange (Milestone 4).\"},{\"question\":\"How should outcome measures be specified in the plan?\",\"answer\":\"For Table 1, list up to four operational and/or clinical outcome measure targets, including descriptions, baseline values, target values, and target dates, using provided outcome measure definitions.\"},{\"question\":\"What information is required in the attachments for current and future IT state?\",\"answer\":\"Attachment 1 requires current health IT products (Table 5) and a diagram plus narrative tying the product list to internal integration. Attachment 2 requires the desired future state products (Table 6) and a diagram for anticipated health information and supporting technologies.\"}]","Transformation Plan Instructions - eQIP Milestone 1 | DOCX",1788294206]