[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-172540-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-172540-en":126},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","the-imagine-programme-specification-mc-10-2021","THE IMAGINE PROGRAMME - Specification - MC-10-2021","","Specification for repairs to the Bushara water reservoir damaged by lava under the THE IMAGINE PROGRAMME, identified as MC-10-2021. The document sets out general requirements and detailed provisions covering introduction, site and ambient conditions, contract scope, programme for execution, completion criteria, and standard specifications. It further defines construction, supervision, safety and environmental protections, and lists comprehensive materials requirements for concrete, pipes, valves, fittings, and building and plumbing materials, followed by excavation, backfilling, and restoration requirements.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/presentations/","Presentations",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/the-imagine-programme-specification-mc-10-2021/172540/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/the-imagine-programme-specification-mc-10-2021/172540.png","ImageObject",442,249,{"name":42,"@type":43},"Mason","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-25","2026-09-01",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",14,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What project and scope does this specification cover?","Question",{"text":63,"@type":64},"The specification covers repairs of the Bushara water reservoir damaged by lava under the THE IMAGINE PROGRAMME (MC-10-2021). It defines general requirements and technical provisions for executing the works.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Which general topics are included in the document’s requirements?",{"text":68,"@type":64},"It includes introduction, location and ambient conditions, extent of contract, execution programme, completion requirements, standard specifications, units and level datum, setting out, construction checking, supervision, subcontractors, site offices and services, and compliance and safety provisions.",{"name":70,"@type":61,"acceptedAnswer":71},"What types of materials and site works are specified?",{"text":72,"@type":64},"Materials requirements cover concrete constituents and mortar, reinforcement and formwork, water stops, various pipe systems and fittings (including steel, ductile iron, uPVC, GRP, HDPE), valves and meters, plus building and plumbing materials. Site works include clearance, excavation classification, blasting, trench excavation, foundation preparation, backfilling, reinstatement, and restoration such as topsoil and grassing.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},172540,1791744250,{"code":4,"msg":82,"data":83},"success",[84,88,93,97,102,107,112,117,122],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":86,"slug":87},11,90,"presentations",{"id":89,"doc_module":22,"doc_module_name":25,"category_name":90,"show_sort_weight":91,"slug":92},12,"Resumes",80,"resumes",{"id":55,"doc_module":22,"doc_module_name":25,"category_name":94,"show_sort_weight":95,"slug":96},"Invoices",70,"invoices",{"id":98,"doc_module":22,"doc_module_name":25,"category_name":99,"show_sort_weight":100,"slug":101},15,"Posters",60,"posters",{"id":103,"doc_module":22,"doc_module_name":25,"category_name":104,"show_sort_weight":105,"slug":106},16,"Social Media",50,"social-media",{"id":108,"doc_module":22,"doc_module_name":25,"category_name":109,"show_sort_weight":110,"slug":111},17,"Forms",40,"forms",{"id":113,"doc_module":22,"doc_module_name":25,"category_name":114,"show_sort_weight":115,"slug":116},18,"Letters",30,"letters",{"id":118,"doc_module":22,"doc_module_name":25,"category_name":119,"show_sort_weight":120,"slug":121},21,"Paper Templates",5,"papers-templates",{"id":123,"doc_module":22,"doc_module_name":25,"category_name":124,"show_sort_weight":4,"slug":125},158,"General","general-158",{"code":4,"msg":82,"data":127},{"doc_id":79,"user_id":128,"nickname":42,"user_avatar":129,"doc_module":22,"category_id":85,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":135,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":140,"read_time":141},5909887256941,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","THE IMAGINE PROGRAMME\nMC-10-2021\nREPAIRS OF THE BUSHARA WATER RESERVOIR THAT WAS DEMAGED BY LAVA.\nSPECIFICATION\nCONTENTS\nSection\tDescription\tPage\n\u0013 TOC \\o \"1-2\" \u00141\tGENERAL REQUIREMENTS\t\u0013 PAGEREF _Toc514150418 \\h \u00141-1\u0015\n1.1\tIntroduction\t\u0013 PAGEREF _Toc514150419 \\h \u00141-1\u0015\n1.2\tLocation of the works\t\u0013 PAGEREF _Toc514150420 \\h \u00141-2\u0015\n1.3\tAmbient conditions\t\u0013 PAGEREF _Toc514150421 \\h \u00141-2\u0015\n1.4\tExtent of contract\t\u0013 PAGEREF _Toc514150422 \\h \u00141-3\u0015\n1.5\tPlan of operations and temporary works\t\u0013 PAGEREF _Toc514150423 \\h \u00141-3\u0015\n1.6\tProgramme for the execution of Works\t\u0013 PAGEREF _Toc514150424 \\h \u00141-4\u0015\n1.7\tSubstantial (practical) Completion\t\u0013 PAGEREF _Toc514150425 \\h \u00141-5\u0015\n1.8\tStandard specifications\t\u0013 PAGEREF _Toc514150426 \\h \u00141-5\u0015\n1.9\tUnits\t\u0013 PAGEREF _Toc514150427 \\h \u00141-6\u0015\n1.10\tLevel datum\t\u0013 PAGEREF _Toc514150428 \\h \u00141-6\u0015\n1.11\tSites for Permanent Works\t\u0013 PAGEREF _Toc514150429 \\h \u00141-6\u0015\n1.12\tCompliance with Statutes and Local Regulations\t\u0013 PAGEREF _Toc514150430 \\h \u00141-6\u0015\n1.13\tSetting out\t\u0013 PAGEREF _Toc514150431 \\h \u00141-6\u0015\n1.14\tConstruction and checking of work\t\u0013 PAGEREF _Toc514150432 \\h \u00141-7\u0015\n1.15\tSupervision and labour\t\u0013 PAGEREF _Toc514150433 \\h \u00141-7\u0015\n1.16\tSpecialist subcontractors\t\u0013 PAGEREF _Toc514150434 \\h \u00141-7\u0015\n1.17\tWorks executed by the Employer or other contractors\t\u0013 PAGEREF _Toc514150435 \\h \u00141-8\u0015\n1.18\tContractor’s site offices, workshops, storage and working areas\t\u0013 PAGEREF _Toc514150436 \\h \u00141-8\u0015\n1.19\tServices for Engineer\t\u0013 PAGEREF _Toc514150437 \\h \u00141-8\u0015\n1.20\tDefinition and use of the Site\t\u0013 PAGEREF _Toc514150438 \\h \u00141-11\u0015\n1.21\tPossession of the Site\t\u0013 PAGEREF _Toc514150439 \\h \u00141-12\u0015\n1.22\tInterference with existing works\t\u0013 PAGEREF _Toc514150440 \\h \u00141-12\u0015\n1.23\tMaterials for the works\t\u0013 PAGEREF _Toc514150441 \\h \u00141-12\u0015\n1.24\tDust, insect and vermin proofing\t\u0013 PAGEREF _Toc514150442 \\h \u00141-13\u0015\n1.25\tRejected materials and defective work\t\u0013 PAGEREF _Toc514150443 \\h \u00141-13\u0015\n1.26\tAlternatives\t\u0013 PAGEREF _Toc514150444 \\h \u00141-13\u0015\n1.27\tExisting works and services\t\u0013 PAGEREF _Toc514150445 \\h \u00141-14\u0015\n1.28\tOverhead power lines\t\u0013 PAGEREF _Toc514150446 \\h \u00141-15\u0015\n1.29\tExisting access\t\u0013 PAGEREF _Toc514150447 \\h \u00141-15\u0015\n1.30\tExcavation across roads and tracks\t\u0013 PAGEREF _Toc514150448 \\h \u00141-15\u0015\n1.31\tLiaison with police and other officials\t\u0013 PAGEREF _Toc514150449 \\h \u00141-15\u0015\n1.32\tPreservation of trees\t\u0013 PAGEREF _Toc514150450 \\h \u00141-15\u0015\n1.33\tProtection from water\t\u0013 PAGEREF _Toc514150451 \\h \u00141-16\u0015\n1.34\tProtection against fires\t\u0013 PAGEREF _Toc514150452 \\h \u00141-16\u0015\n1.35\tWatching, fencing and lighting\t\u0013 PAGEREF _Toc514150453 \\h \u00141-16\u0015\n1.36\tWater and power for use on the works\t\u0013 PAGEREF _Toc514150454 \\h \u00141-17\u0015\n1.37\tEmployer as a supplier of water and power\t\u0013 PAGEREF _Toc514150455 \\h \u00141-17\u0015\n1.38\tFuel supplies\t\u0013 PAGEREF _Toc514150456 \\h \u00141-17\u0015\n1.39\tTelephone and communications\t\u0013 PAGEREF _Toc514150457 \\h \u00141-17\u0015\n1.40\tSanitation\t\u0013 PAGEREF _Toc514150458 \\h \u00141-18\u0015\n1.41\tFirst aid and medical services\t\u0013 PAGEREF _Toc514150459 \\h \u00141-18\u0015\n1.42\tHealth checks\t\u0013 PAGEREF _Toc514150460 \\h \u00141-18\u0015\n1.43\tInspections by the Engineer during the Defects Liability Period\t\u0013 PAGEREF _Toc514150461 \\h \u00141-18\u0015\n1.44\tHealth and safety\t\u0013 PAGEREF _Toc514150462 \\h \u00141-19\u0015\n1.45\tWork in confined spaces\t\u0013 PAGEREF _Toc514150463 \\h \u00141-20\u0015\n1.46\tSign boards\t\u0013 PAGEREF _Toc514150464 \\h \u00141-21\u0015\n1.47\tBuilding regulations\t\u0013 PAGEREF _Toc514150465 \\h \u00141-21\u0015\n1.48\tContractor’s tracked equipment\t\u0013 PAGEREF _Toc514150466 \\h \u00141-21\u0015\n1.49\tSite meetings\t\u0013 PAGEREF _Toc514150467 \\h \u00141-21\u0015\n1.50\tPollution\t\u0013 PAGEREF _Toc514150468 \\h \u00141-21\u0015\n1.51\tSite clearance\t\u0013 PAGEREF _Toc514150469 \\h \u00141-22\u0015\n1.52\tAbbreviations\t\u0013 PAGEREF _Toc514150470 \\h \u00141-22\u0015\n2\tMATERIALS\t\u0013 PAGEREF _Toc514150471 \\h \u00142-1\u0015\n2.1\tApproval of concrete constituents\t\u0013 PAGEREF _Toc514150472 \\h \u00142-1\u0015\n2.2\tWater for concrete and mortar\t\u0013 PAGEREF _Toc514150473 \\h \u00142-1\u0015\n2.3\tAggregates for concrete\t\u0013 PAGEREF _Toc514150474 \\h \u00142-1\u0015\n2.4\tPulverised fuel ash\t\u0013 PAGEREF _Toc514150475 \\h \u00142-5\u0015\n2.5\tCement\t\u0013 PAGEREF _Toc514150476 \\h \u00142-5\u0015\n2.6\tAdmixtures for concrete or grout\t\u0013 PAGEREF _Toc514150477 \\h \u00142-6\u0015","cbCainOYfUHCgZXm","https://ap.wps.com/l/cbCainOYfUHCgZXm","docx",610948,239,"English","# GENERAL REQUIREMENTS\n## Introduction\n## Location of the works\n## Ambient conditions\n## Extent of contract\n## Plan of operations and temporary works\n## Programme for the execution of Works\n## Substantial (practical) Completion\n## Standard specifications\n## Units\n## Level datum\n## Sites for Permanent Works\n## Compliance with Statutes and Local Regulations\n## Setting out\n## Construction and checking of work\n## Supervision and labour\n## Specialist subcontractors\n## Works executed by the Employer or other contractors\n## Contractor’s site offices, workshops, storage and working areas\n## Services for Engineer\n## Definition and use of the Site\n## Possession of the Site\n## Interference with existing works\n## Materials for the works\n## Dust, insect and vermin proofing\n## Rejected materials and defective work\n## Alternatives\n## Existing works and services\n## Overhead power lines\n## Existing access\n## Excavation across roads and tracks\n## Liaison with police and other officials\n## Preservation of trees\n## Protection from water\n## Protection against fires\n## Watching, fencing and lighting\n## Water and power for use on the works\n## Employer as a supplier of water and power\n## Fuel supplies\n## Telephone and communications\n## Sanitation\n## First aid and medical services\n## Health checks\n## Inspections by the Engineer during the Defects Liability Period\n## Health and safety\n## Work in confined spaces\n## Sign boards\n## Building regulations\n## Contractor’s tracked equipment\n## Site meetings\n## Pollution\n## Site clearance\n## Abbreviations\n# MATERIALS\n## Approval of concrete constituents\n## Water for concrete and mortar\n## Aggregates for concrete\n## Pulverised fuel ash\n## Cement\n## Admixtures for concrete or grout\n## Mortar\n## Reinforcement\n## Formwork\n## Water stops\n## Steel pipes and fittings\n## Ductile Cast Iron (GGG) pipes and fittings\n## uPVC pipes and fittings\n## Glass reinforced plastic pipes and fittings\n## HDPE pipes and fittings\n## Concrete drain pipes\n## Pipe Saddles\n## Valves\n## Meters and meter boxes\n## Ferrules\n## Marker posts\n## Building materials\n## Plumbing materials\n# EXCAVATION, BACKFILLING AND RESTORATION\n## Clearance of ground\n## Agreement of existing ground levels\n## Classification of excavation\n## Blasting\n## Excavated material\n## Timbering and dewatering of excavations\n## Trench excavation\n## Preparation, inspection and blinding of foundations\n## Foundations and thrust blocks cast against existing ground\n## Fill\n## Backfilling of trenches\n## Reinstatement\n## Topsoil and Grassing\n## Hardcore\n## Pitching","[{\"question\":\"What project and scope does this specification cover?\",\"answer\":\"The specification covers repairs of the Bushara water reservoir damaged by lava under the THE IMAGINE PROGRAMME (MC-10-2021). It defines general requirements and technical provisions for executing the works.\"},{\"question\":\"Which general topics are included in the document’s requirements?\",\"answer\":\"It includes introduction, location and ambient conditions, extent of contract, execution programme, completion requirements, standard specifications, units and level datum, setting out, construction checking, supervision, subcontractors, site offices and services, and compliance and safety provisions.\"},{\"question\":\"What types of materials and site works are specified?\",\"answer\":\"Materials requirements cover concrete constituents and mortar, reinforcement and formwork, water stops, various pipe systems and fittings (including steel, ductile iron, uPVC, GRP, HDPE), valves and meters, plus building and plumbing materials. Site works include clearance, excavation classification, blasting, trench excavation, foundation preparation, backfilling, reinstatement, and restoration such as topsoil and grassing.\"}]","THE IMAGINE PROGRAMME - Specification - MC-10-2021 | DOCX",1788294459,84]