[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-170772-105":53,"doc-detail-170772-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","terms-of-reference-electric-power-systems-for-covid-19-response-facilities-front-lines-summary","Terms of Reference - Electric Power Systems for COVID-19 Response Facilities (Front Lines) - Summary","","Terms of Reference (TOR) for contracting a single firm or consortium to procure, install, and ensure reliable electric power systems for facilities supporting COUNTRY’s frontline response to the COVID-19 pandemic. The work covers modular installation for identified facility types, guarantees continuous 24/7 operation with maintenance and technology upgrades for 24 months after commissioning (or until a long-term operator is chosen), and provides system hand-over after the second work program. Funding is linked to a World Bank-supported project restructuring and delivery is carried out through emergency fast-tracked procurement.",{"@graph":63,"@context":123},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":41,"@type":70,"position":76},"https://docshare.wps.com/template/letters/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/terms-of-reference-electric-power-systems-for-covid-19-response-facilities-front-lines-summary/170772/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/terms-of-reference-electric-power-systems-for-covid-19-response-facilities-front-lines-summary/170772.png","ImageObject",442,249,{"name":88,"@type":89},"Sophia Brooks","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-18","2026-09-01",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",7,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115,119],{"name":106,"@type":107,"acceptedAnswer":108},"谁需要执行该TOR中的电力系统安装与运维工作？","Question",{"text":109,"@type":110},"该TOR面向单一公司或公司联合体（consortium），由其负责电力系统的采购、安装、持续运行与交接工作。","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"TOR覆盖哪些“前线”设施类型？",{"text":114,"@type":110},"包括与主电网连接但供电不稳定的城市/郊区医院、农村与郊区的基层卫生机构或小型医院、用于处理与救治超负荷患者的临时应急设施，以及用于检测、冷链、个人防护装备生产及协调落实疫情工作的其他关键建筑。",{"name":116,"@type":107,"acceptedAnswer":117},"三个工作计划分别包含哪些关键交付？",{"text":118,"@type":110},"工作计划1为采购并安装模块化电力系统；工作计划2为在24个月或确定长期运营方之前确保电力系统连续24/7运行并开展维护与技术升级；工作计划3为在工作计划2结束后向相关业主-运营方交接系统。",{"name":120,"@type":107,"acceptedAnswer":121},"该项目如何进行采购与付款？",{"text":122,"@type":110},"根据世界银行紧急快速通道采购政策，将以竞争性招标方式向公司或联合体授标。成功申请人将与政府实施机构签署合同，并在完成约定里程碑后获得付款。","https://schema.org",{"og:url":78,"og:type":125,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":127,"canonical":78},"index,follow",{"doc_id":129,"site_id":56},170772,1788275318,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":88,"user_avatar":134,"doc_module":9,"category_id":40,"category_name":41,"doc_title":59,"doc_description":61,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":8,"language":140,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":61,"update_tm":130,"read_time":79},962084925636,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","Terms of Reference for the Installation of Electric Power Systems for Facilities at the Front Lines of COUNTRY’s COVID-19 Response\nSummary\nThis Terms of Reference (TOR) is for a single company or consortium of companies to electric power systems for facilities that are on the front lines of COUNTRY’s response to the COVID-19 pandemic. This activity is funded through the World Bank-supported PROJECT NAME (P NUMBER), which is being restructured to aid in the Government of COUNTRY’s emergency COVID-19 response.\nFor the purposes of this TOR, the types of facilities targeted for urgent intervention are:\nType 1 Facility: Hospitals in urban and peri-urban areas that are connected to the main grid, but which receive unreliable power\nType 2 Facility: Primary health clinics and smaller hospitals in rural and peri-urban areas that are (a) not connected to the main grid and either depend on diesel generator sets or lack access to electricity\nor (b) which are connected to the main grid but receive unreliable power\nType 3 Facility: Temporary emergency facilities that are being established to process and treat overflow patients\nType 4 Facility: Other buildings that are critical to the country’s COVID-19 response including testing laboratories, cold-storage warehouses, local factories making personal protective equipment, and government offices (both in the capital and elsewhere) coordinating and implementing COVID-19 activities.\nThe firm or consortium will be responsible for the following activities, divided into three Work Programs:\nWork Program 1: Procure and install modular electric power systems for facilities in COUNTRY, which have been identified by the Government of COUNTRY with World Bank support.\nWork Program 2: Ensure continuous 24/7 operation of the facility’s electric power system, including any necessary maintenance plans and technology upgrades, for a period of 24 months after the date of commissioning or until a long-term operator is identified, whichever occurs first.\nWork Program 3: Hand-over of the system to the relevant owner-operator at the conclusion of Work Program 2.\nThe activities described in this TOR will be competitively tendered under emergency fast-tracked World Bank procurement policies to firms or consortia of firms. The successful applicants will sign a contractual agreement with GOVERNMENT IMPLEMENTING AGENCY and will receive payments upon successful completion of the agreed milestones.\nBackground\nAn outbreak of the coronavirus disease (COVID-19) caused by the 2019 novel coronavirus (SARS-CoV-2) has been spreading rapidly across the world since December 2019, following the diagnosis of the initial cases in Wuhan, Hubei Province, China. Since the beginning of March 2020, the number of cases outside China has increased thirteenfold and the number of affected countries has tripled. On March 11, 2020, the World Health Organization (WHO) declared a global pandemic as the coronavirus rapidly spreads across the world. As of April 4, 2020, the outbreak has resulted in approximately 1 million cases and more than 50,000 deaths across nearly every country around the world.\nCOVID-19 is one of several emerging infectious disease outbreaks in recent decades resulting in major outbreaks with significant public health and economic impacts. The last moderately severe influenza pandemics were in 1957 and 1968; each killed more than a million people around the world. Although countries are now far more prepared than in the past, the world is also far more interconnected, and many more people today have behavior risk factors such as tobacco use and pre-existing chronic health problems that make viral respiratory infections like COVID-19 particularly dangerous.\nScientists are still trying to understand the full picture of COVID-19’s symptoms and severity. Approximately 20 percent of all confirmed cases require hospitalization, and 5 percent of all confirmed cases require intensive care typically consisting of mechanically powered","cbCaiqsaaKfVwvG2","https://ap.wps.com/l/cbCaiqsaaKfVwvG2","docx",56038,"English","# Summary\n## Facility Types\n## Work Programs\n## Procurement and Contracting\n# Background\n## COVID-19 Spread and Impact","[{\"question\":\"谁需要执行该TOR中的电力系统安装与运维工作？\",\"answer\":\"该TOR面向单一公司或公司联合体（consortium），由其负责电力系统的采购、安装、持续运行与交接工作。\"},{\"question\":\"TOR覆盖哪些“前线”设施类型？\",\"answer\":\"包括与主电网连接但供电不稳定的城市/郊区医院、农村与郊区的基层卫生机构或小型医院、用于处理与救治超负荷患者的临时应急设施，以及用于检测、冷链、个人防护装备生产及协调落实疫情工作的其他关键建筑。\"},{\"question\":\"三个工作计划分别包含哪些关键交付？\",\"answer\":\"工作计划1为采购并安装模块化电力系统；工作计划2为在24个月或确定长期运营方之前确保电力系统连续24/7运行并开展维护与技术升级；工作计划3为在工作计划2结束后向相关业主-运营方交接系统。\"},{\"question\":\"该项目如何进行采购与付款？\",\"answer\":\"根据世界银行紧急快速通道采购政策，将以竞争性招标方式向公司或联合体授标。成功申请人将与政府实施机构签署合同，并在完成约定里程碑后获得付款。\"}]","Terms of Reference - Electric Power Systems for COVID-19 Response Facilities (Front Lines) - Summary | DOCX"]