[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-167860-en":3,"doc-seo-167860-105":30,"detail-sidebar-cat-1-en-105":92},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":11,"category_id":12,"category_name":13,"doc_title":14,"doc_description":15,"doc_content":16,"file_id":17,"file_url":18,"file_type":19,"file_size":20,"view_count":4,"is_deleted":4,"is_public":11,"is_downloadable":11,"audit_status":11,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":15,"update_tm":28,"read_time":29},167860,1099514068365,"Aurelia","https://ap-avatar.wpscdn.com/avatar/10000253d8d9f28188e?_k=1776742907772140068",1,158,"General","Supplementary Conditions of the Construction Contract - Purpose and Intended Use","Supplementary Conditions of the Construction Contract explains the purpose and intended use of the EJCDC standard contract package for construction projects. It clarifies how essential project-specific information is transferred from the General Conditions into tailored Supplementary Conditions, including mandatory clauses for technical reports, hazardous environmental conditions, insurance requirements, and selection of resident project representative services. It also specifies how these conditions relate to other contract documents and addresses proper arrangement aligned with the 2018 General Conditions edition.","This document has important legal consequences; consultation with an attorney is encouraged with respect to its use or modification. This document should be adapted to the particular circumstances of the contemplated Project and the controlling Laws and Regulations.\nSupplementary Conditions\nOF THE CONSTRUCTION CONTRACT\nPrepared By\nEndorsed By\nCopyright© 2018\nNational Society of Professional Engineers\n1420 King Street, Alexandria, VA 22314-2794\n(703) 684-2882\n\u0013 HYPERLINK \"http://www.nspe.org/\" \u0014www.nspe.org\u0015\nAmerican Council of Engineering Companies\n1015 15th Street N.W., Washington, DC 20005\n(202) 347-7474\n\u0013 HYPERLINK \"http://www.acec.org/\" \u0014www.acec.org\u0015\nAmerican Society of Civil Engineers\n1801 Alexander Bell Drive, Reston, VA 20191-4400\n(800) 548-2723\n\u0013 HYPERLINK \"http://www.asce.org/\" \u0014www.asce.org\u0015\nThe copyright for this EJCDC document is owned jointly by the three sponsoring organizations listed above. The National Society of Professional Engineers is the Copyright Administrator for the EJCDC documents; please direct all inquiries regarding EJCDC copyrights to NSPE.\nNOTE: EJCDC publications may be purchased at \u0013 HYPERLINK \"http://www.ejcdc.org/\" \u0014www.ejcdc.org\u0015, or from any of the sponsoring organizations above.\nGuidelines for Use of EJCDC® C\u001e800,\nSupplementary Conditions OF THE CONSTRUCTION CONTRACT\nPURPOSE AND INTENDED USE OF THE DOCUMENT\nGeneral\nThe Engineers Joint Contract Documents Committee® (EJCDC®) has prepared and publishes standard contract forms for construction contracts, as well as bidding-related documents. The principal forms are listed in Table 1. EJCDC has also prepared other documents that may be useful in preparing construction contract documents. Some of the principal ones are listed in Table 2. For the most recent editions of these forms, guides, and other documents, please refer to EJCDC’s website at www.ejcdc.org.\nTable 1—Principal EJCDC Standard Forms for Construction Contracts\nTable 2—Principal EJCDC Documents Relating to Preparation of Construction Documents\nMandatory Supplementary Conditions\nSeveral provisions of the General Conditions expressly indicate that essential Project-specific information will be set out in a corresponding Supplementary Condition. For example, Paragraph 6.03.A of the General Conditions indicates that the specific requirements for insurance to be carried by Contractor will be stated in the Supplementary Conditions. Every EJCDC based construction contract should include, at a minimum, the following Supplementary Conditions, edited for the specific project:\nParagraph SC\u001e5.03, concerning reports and drawings of conditions at the Site that contain Technical Data on whose accuracy the Contractor may rely;\nParagraph SC\u001e5.06, disclosing reports and drawings regarding Hazardous Environmental Conditions at the Site, and identifying any Technical Data in those reports and drawings on whose accuracy the Contractor may rely;\nParagraph SC\u001e6.03, identifying specific insurance coverage requirements; and\nOne of the two alternatives presented in SC\u001e10.03 (either the Engineer will provide Resident Project Representative services on the Project, with specific authority and responsibilities, or Engineer will not provide Resident Project Representative services).\nOther suggested Supplementary Conditions are mandatory under specific circumstances: for example, on projects in which the Contractor will be responsible for compliance with Owner's safety program, SC\u001e7.13 would be mandatory.\nIn describing a Supplementary Condition as “mandatory” EJCDC is indicating that it is essential to furnish the information that is the subject of the Supplementary Condition; however, the drafter is not restricted from modifying the wording and content of the proposed Supplementary Condition as needed.\nRelationship of Supplementary Conditions to Other Contract Documents\nSupplementary Conditions are modifications to the General Conditions—additions, deletions, changes. This is as the term is defined by EJCDC and","cbCairgnmV6t1vgM","https://ap.wps.com/l/cbCairgnmV6t1vgM","docx",537310,63,"English","en",105,"# PURPOSE AND INTENDED USE OF THE DOCUMENT\n## General\n## Mandatory Supplementary Conditions\n## Relationship of Supplementary Conditions to Other Contract Documents\n## Arrangement of Subject Matter\n## Use of this Document","[{\"question\":\"What is the purpose of the Supplementary Conditions in an EJCDC-based construction contract?\",\"answer\":\"They provide a place for essential project-specific information that the General Conditions indicate will be set out correspondingly in the Supplementary Conditions.\"},{\"question\":\"Which Supplementary Conditions are mandatory for every EJCDC-based construction contract?\",\"answer\":\"At a minimum: SC 5.03 on site condition reports and drawings with technical data; SC 5.06 on hazardous environmental conditions; SC 6.03 identifying specific insurance coverage requirements; and one of the two alternatives in SC 10.03 regarding resident project representative services.\"},{\"question\":\"How should pricing terms and completion dates be handled across contract documents?\",\"answer\":\"Price terms, monetary provisions, and completion dates should be set forth in the Agreement, not included in the Supplementary Conditions.\"}]","Supplementary Conditions of the Construction Contract - Purpose and Intended Use | DOCX",1788220510,22,{"code":4,"msg":31,"data":32},"ok",{"site_id":24,"language":23,"slug":33,"title":14,"keywords":34,"description":15,"schema_data":35,"social_meta":87,"head_meta":89,"extra_data":91,"updated_unix":28},"supplementary-conditions-of-the-construction-contract-purpose-and-intended-use","",{"@graph":36,"@context":86},[37,54,69],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,48,51],{"item":41,"name":42,"@type":43,"position":11},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":47},"https://docshare.wps.com/template/","Template",2,{"item":49,"name":13,"@type":43,"position":50},"https://docshare.wps.com/template/general/",3,{"item":52,"name":14,"@type":43,"position":53},"https://docshare.wps.com/template/supplementary-conditions-of-the-construction-contract-purpose-and-intended-use/167860/",4,{"url":52,"name":14,"@type":55,"author":56,"headline":14,"publisher":58,"fileFormat":61,"inLanguage":23,"description":15,"dateModified":62,"datePublished":63,"encodingFormat":61,"isAccessibleForFree":64,"interactionStatistic":65},"DigitalDocument",{"name":9,"@type":57},"Person",{"url":41,"name":59,"@type":60},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-09-05","2026-08-31",true,{"@type":66,"interactionType":67,"userInteractionCount":47},"InteractionCounter",{"@type":68},"ViewAction",{"@type":70,"mainEntity":71},"FAQPage",[72,78,82],{"name":73,"@type":74,"acceptedAnswer":75},"What is the purpose of the Supplementary Conditions in an EJCDC-based construction contract?","Question",{"text":76,"@type":77},"They provide a place for essential project-specific information that the General Conditions indicate will be set out correspondingly in the Supplementary Conditions.","Answer",{"name":79,"@type":74,"acceptedAnswer":80},"Which Supplementary Conditions are mandatory for every EJCDC-based construction contract?",{"text":81,"@type":77},"At a minimum: SC 5.03 on site condition reports and drawings with technical data; SC 5.06 on hazardous environmental conditions; SC 6.03 identifying specific insurance coverage requirements; and one of the two alternatives in SC 10.03 regarding resident project representative services.",{"name":83,"@type":74,"acceptedAnswer":84},"How should pricing terms and completion dates be handled across contract documents?",{"text":85,"@type":77},"Price terms, monetary provisions, and completion dates should be set forth in the Agreement, not included in the Supplementary Conditions.","https://schema.org",{"og:url":52,"og:type":88,"og:title":14,"og:site_name":59,"og:description":15},"article",{"robots":90,"canonical":52},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":93},[94,99,104,109,114,119,124,129,134],{"id":95,"doc_module":11,"doc_module_name":46,"category_name":96,"show_sort_weight":97,"slug":98},11,"Presentations",90,"presentations",{"id":100,"doc_module":11,"doc_module_name":46,"category_name":101,"show_sort_weight":102,"slug":103},12,"Resumes",80,"resumes",{"id":105,"doc_module":11,"doc_module_name":46,"category_name":106,"show_sort_weight":107,"slug":108},14,"Invoices",70,"invoices",{"id":110,"doc_module":11,"doc_module_name":46,"category_name":111,"show_sort_weight":112,"slug":113},15,"Posters",60,"posters",{"id":115,"doc_module":11,"doc_module_name":46,"category_name":116,"show_sort_weight":117,"slug":118},16,"Social Media",50,"social-media",{"id":120,"doc_module":11,"doc_module_name":46,"category_name":121,"show_sort_weight":122,"slug":123},17,"Forms",40,"forms",{"id":125,"doc_module":11,"doc_module_name":46,"category_name":126,"show_sort_weight":127,"slug":128},18,"Letters",30,"letters",{"id":130,"doc_module":11,"doc_module_name":46,"category_name":131,"show_sort_weight":132,"slug":133},21,"Paper Templates",5,"papers-templates",{"id":12,"doc_module":11,"doc_module_name":46,"category_name":13,"show_sort_weight":4,"slug":135},"general-158"]