[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-252637-105":53,"doc-detail-252637-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","suggested-format-for-the-bi-weekly-report-sign-off-checklist","Suggested Format for the Bi-Weekly Report - Sign-off Checklist","","Suggested Format for the Bi-Weekly Report provides a structured checklist for documenting survey activities over a two-week period. It prompts confirmation of whether survey source (array) activity occurred, whether navigation data for shot lines was submitted, and whether airgun total energy output exceeded the permit limit. It also requires confirmation of minimum vessel separation distances, with explanations when not met. The form ends with a signature and company contact fields affirming compliance with Section V of the NRDC Settlement Agreement.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/suggested-format-for-the-bi-weekly-report-sign-off-checklist/252637/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/suggested-format-for-the-bi-weekly-report-sign-off-checklist/252637.png","ImageObject",442,249,{"name":88,"@type":89},"Theodora","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-30","2026-09-13",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",8,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What items must be confirmed for the two-week survey period?","Question",{"text":109,"@type":110},"The form asks whether there was survey source (array) activity and whether shot line navigation for the period was submitted.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What happens if total energy output exceeds the permit limit?",{"text":114,"@type":110},"You must select YES and provide an explanation describing the circumstances causing the exceedance.",{"name":116,"@type":107,"acceptedAnswer":117},"What information is required if the minimum separation distance was not maintained?",{"text":118,"@type":110},"You must provide an explanation for why the minimum separation distance was not maintained, and include the required sign-off details.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},252637,1790679526,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":4},687197207919,"https://ap-avatar.wpscdn.com/avatar/a000253d6f5f7c60be?x-image-process=image/resize,m_fixed,w_180,h_180&k=1779446848396160552","Suggested Format for the Bi-Weekly Report:  \nPermit:    \nBi-Weekly Report for the Survey Period:   to   Was there survey (source array) activity during this 2 week period? YES NO  \nInclude a navigation file for each of the source vessels operating during this reporting period along with your written bi-weekly report and a daily log showing the date and times of data acquisition for each day during the reporting period. You must submit a separate file for each source vessel. BOEM strongly recommends that you submit the navigation data in P1-90 format. It is recommended that you submit your report to the BOEM G&G Permits website ([GGPERMITSGOMR@BOEM.gov](GGPERMITSGOMR@BOEM.gov) ) or on a suitable media; preferably a CD/DVD.  \n1. Was the survey shot line navigation (showing dates, locations and times) submitted for this two week period? YES NO  \n2. Did the total energy output of your airgun array exceed the limit set forth in your permit application? YES NO If YES, explain the circumstances that caused the total energy output to exceed that set forth in your permit application:    \n______________________________________________________________________________  \n______________________________________________________________________________  \n______________________________________________________________________________  \n3. Confirm that the survey vessels maintained the minimum separation distance (as stated in your permit) between your survey and any other adjacent deep seismic survey during this period:  \n______________________________________________________________________________  \n______________________________________________________________________________  \n______________________________________________________________________________  \n4. If you did not maintain the minimum separation distance provide an explanation why not:  \n______________________________________________________________________________  \n______________________________________________________________________________  \n______________________________________________________________________________  \n______________________________________________________________________________  \nBy signing this document you confirm that, during the two week period indicated above, you have complied with all of the applicable terms of Section V of the NRDC Settlement Agreement.  \nSignature:    \nPrinted Name:    \nCompany:    \nTitle:    \nPhone:    \nEmail:","cbCairCxKUq3GnEg","https://ap.wps.com/l/cbCairCxKUq3GnEg","pdf",52236,"English","# Bi-Weekly Report for the Survey Period\n## Survey activity and navigation submission\n## Energy output exceedance and explanations\n## Minimum separation distance confirmation\n## Signature and compliance attestation","[{\"question\":\"What items must be confirmed for the two-week survey period?\",\"answer\":\"The form asks whether there was survey source (array) activity and whether shot line navigation for the period was submitted.\"},{\"question\":\"What happens if total energy output exceeds the permit limit?\",\"answer\":\"You must select YES and provide an explanation describing the circumstances causing the exceedance.\"},{\"question\":\"What information is required if the minimum separation distance was not maintained?\",\"answer\":\"You must provide an explanation for why the minimum separation distance was not maintained, and include the required sign-off details.\"}]","Suggested Format for the Bi-Weekly Report - Sign-off Checklist | PDF",1789262324]