[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-242724-105":53,"doc-detail-242724-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","sufficient-vs-insufficient-project-quotes-retrofit-program","Sufficient vs. Insufficient Project Quotes Retrofit Program","","This document outlines the requirements for project quotations in the Retrofit Program, focusing on the necessary information for technical review. It details the criteria for both sufficient and insufficient quotes, providing examples to guide applicants. The Save on Energy Technical Reviewer requires specific information to be included in project quotations; however, if any required details are missing, an email confirmation with the missing information submitted alongside the application documents can be accepted. A key distinction is made between quotes that contain all critical information, such as facility address, applicant company name, date, full model numbers, quantities of individual fixtures/equipment, and clear differentiation between material, labour, and disposal costs, versus those that lack these essential elements. Proper documentation ensures a smooth and efficient review process for retrofit program applications, emphasizing transparency and completeness in financial proposals to support energy-saving initiatives.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/sufficient-vs-insufficient-project-quotes-retrofit-program/242724/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/sufficient-vs-insufficient-project-quotes-retrofit-program/242724.png","ImageObject",442,249,{"name":88,"@type":89},"Arica Lee","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-11","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":47},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What information is required in a project quotation for the Retrofit Program?","Question",{"text":108,"@type":109},"The Save on Energy Technical Reviewer requires project quotations to include the facility address, applicant company name, date, full model numbers or quantities of individual fixtures/equipment, and a breakdown of material, labour, and disposal costs.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What happens if a project quotation is missing critical information?",{"text":113,"@type":109},"If any required information is missing from a project quotation, an email confirmation with the missing details, submitted with the application documents, is acceptable.",{"name":115,"@type":106,"acceptedAnswer":116},"What are some examples of insufficient information in a project quote?",{"text":117,"@type":109},"A project quote is considered insufficient if it does not include the facility address or applicant company name, lacks a date, fails to provide full model numbers or quantities of individual fixtures/equipment, or does not differentiate between material, labour, and disposal costs.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},242724,1790977233,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":47,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":73,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":9},8796096645457,"https://ap-avatar.wpscdn.com/avatar/800003749518d68ffe3?x-image-process=image/resize,m_fixed,w_180,h_180&k=1779345340919836971","RETROFIT PROGRAM  \nSUFFICIENT VS. INSUFFICIENT QUOTE  \n1. ENSURE QUOTES CONTAIN CRITICAL INFORMATION  \nThe Save on Energy Technical Reviewer requires project quotations to contain certain information. If any of the required information is missing, an email confirmation with the missing information that is submitted with application documents is acceptable.  \n2. EXAMPLE OF A PROJECT QUOTE WITH SUFFICIENT  \nINFORMATION  \n| \u003Cbr>|  |  |  |\n| --- | --- | --- | --- |\n| | | | |\n\nQuantity  \n3. EXAMPLE OF A PROJECT QUOTE WITH INSUFFICIENT INFORMATION  \n(a) Does not include the facility address or applicant company name  \n(b) Does not include a date  \n(c) Does not provide full model numbers or quantities of individual fixtures/equipment  \n(d) Does not differentiate between material, labour, and disposal costs","cbCaighz3Vb6XkpX","https://ap.wps.com/l/cbCaighz3Vb6XkpX","pdf",369868,"English","# RETROFIT PROGRAM\n## SUFFICIENT VS. INSUFFICIENT QUOTE\n### 1. ENSURE QUOTES CONTAIN CRITICAL INFORMATION\n### 2. EXAMPLE OF A PROJECT QUOTE WITH SUFFICIENT INFORMATION\n### 3. EXAMPLE OF A PROJECT QUOTE WITH INSUFFICIENT INFORMATION","[{\"question\":\"What information is required in a project quotation for the Retrofit Program?\",\"answer\":\"The Save on Energy Technical Reviewer requires project quotations to include the facility address, applicant company name, date, full model numbers or quantities of individual fixtures/equipment, and a breakdown of material, labour, and disposal costs.\"},{\"question\":\"What happens if a project quotation is missing critical information?\",\"answer\":\"If any required information is missing from a project quotation, an email confirmation with the missing details, submitted with the application documents, is acceptable.\"},{\"question\":\"What are some examples of insufficient information in a project quote?\",\"answer\":\"A project quote is considered insufficient if it does not include the facility address or applicant company name, lacks a date, fails to provide full model numbers or quantities of individual fixtures/equipment, or does not differentiate between material, labour, and disposal costs.\"}]","Sufficient vs. Insufficient Project Quotes Retrofit Program | PDF",1789193909]