[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-243714-105":53,"doc-detail-243714-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","subcontract-agreement-cost-plus-not-to-exceed-sample","Subcontract Agreement - Cost Plus Not To Exceed - Sample","","Subcontract Agreement (Cost Plus / Not to Exceed) sets the relationship between the Contractor and the Subcontractor for a defined construction scope under a Prime Contract. It incorporates the Prime Contract and Contract Documents by reference, establishes the entire agreement, and ties subcontract obligations to the subcontractor’s trade. The document specifies a cost-plus fee structure with a not-to-exceed ceiling, change-based additions/deductions, required insurance certifications, progress payment retention, and indemnity responsibilities.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/subcontract-agreement-cost-plus-not-to-exceed-sample/243714/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/subcontract-agreement-cost-plus-not-to-exceed-sample/243714.png","ImageObject",442,249,{"name":88,"@type":89},"Putri","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-11","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",7,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What contract framework does the subcontract rely on?","Question",{"text":109,"@type":110},"The agreement states that the Prime Contract and Contract Documents are incorporated by reference and have the same force and effect as if fully set forth. The subcontractor is also bound to the contractor to the same extent regarding the work covered.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"How is the subcontract price calculated under this agreement?",{"text":114,"@type":110},"The price is based on the subcontractor’s cost of work plus a fee, with a not-to-exceed maximum of $2,151,860. Additions and deductions apply for agreed changes in the work.",{"name":116,"@type":107,"acceptedAnswer":117},"What insurance obligations must the subcontractor meet?",{"text":118,"@type":110},"Before performing work or delivering materials, the subcontractor must provide insurance certificates showing required coverages and confirm the insurance will not be canceled without ten days written notice to the contractor. These coverages must remain in force until the work is fully completed, and subcontractors of any tier must also carry the required insurance.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},243714,1789207452,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":47,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":126,"read_time":73},962085571259,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","SUBCONTRACT AGREEMENT COST PLUS / NOT TO EXCEED  \nThis Agreement, made and entered into at San Fernando, California on March 16, 2021, by and between Bernards Bros. , Inc.(hereinafter \"Contractor\"), located at 555 First Street, San Fernando, CA 91340 and Acme Construction (hereinafter \"Subcontractor\"), located at P.O. Box 1234, Los Angeles, CA 90001.  \nRECITALS  \nContractor has entered into a Prime Contract with UC Anywhere (hereinafter \"Owner\"), located at 123 Any Street, Los Angeles, CA 90001 to perform the following construction work: Sample Project. Said work is to be performed in accordance with the Prime Contract and the plans and specifications. Said plans and specifications have been prepared by or on behalf of XYZ Architects.  \nSECTION 1-ENTIRE CONTRACT  \nSubcontractor certifies and agrees that he is fully familiar with all of the terms, conditions and obligations of the Prime Contract and Contract Documents, the location of the job site, and the conditions under which the work is to be performed, and that he enters into this Agreement based upon his investigation of all of such matters and is in no way relying upon any opinions or representations of Contractor. Subcontractor assumes all risks or rewards for the effects of cost escalation or de-escalation for the duration of the project. It is agreed that this Agreement represents the entire agreement. It is further agreed that the Prime Contract and Contract Documents are incorporated in this Agreement by this reference, with the same force and effect as if the same were set forth at length herein, and that Subcontractor and his subcontractors will be and are bound by any and all of said Prime Contract and Contract Documents insofar, as they relate in any part or in any way, directly or indirectly to the work covered by this Agreement. Subcontractor agrees to be bound to Contractor in the same manner and to the same extent as Contractor is bound to Owner under the Prime Contract and Contract Documents, to the extent of the work provided for in this Agreement, and that where, in the Prime Contract and Contract Documents reference is made to Contractor and the work or specification therein pertains to Subcontractor's trade, craft, or type of work, then such work or specification shall be interpreted to apply to Subcontractor instead of Contractor. The term “Contract Documents” is defined to mean and include those items listed in Attachment A, which is an integral part of this Agreement.  \nSECTION 2-SCOPE  \nRough Carpentry as described in Attachment C.  \nSECTION 3-CONTRACT PRICE  \nSubcontractor's cost of work plus a fee, not to exceed Two Million One Hundred Fifty-One Thousand Eight Hundred Sixty Dollars ($2,151,860) as further defined in Attachment C.  \nsubject to additions and deductions for changes in the work as may be agreed upon.  \nSECTION 4-SUBCONTRACT PROVISIONS  \nGeneral Subcontract Provisions are included and are an integral part of this Agreement.  \nSECTION 5-SPECIAL PROVISIONS  \nAttachments A, B, C, and D are an integral part of this Subcontract. Progress payment retention shall be 5% as further described in Attachment B.  \nContractors are required by law to be licensed and regulated by the Contractors State License Board. Any questions concerning a contractor may be referred to the registrar of the board whose address is:  \nContractors State License Board - 9821 Business Park Drive, Sacramento, California 95827.  \nIN WITNESS WHEREOF: The parties hereto have executed this Agreement for themselves, their heirs, executors, successors, administrators, and assignees on the day and year first above written.  \nAcme Construction  \nBy    \nName Title  \nBernards Bros., Inc.  \nBy    \n Corporation  Partnership  Proprietorship  \nSubcontractor's State License No.   Contractor's State License No. 302007  \nGENERAL SUBCONTRACT PROVISIONS  \nA. INSURANCE - Before Subcontractor performs any work at, or prepares or delivers materials to, the site of construction, Subcontractor s","cbCaip3s0aBZrrwf","https://ap.wps.com/l/cbCaip3s0aBZrrwf","pdf",182328,"English","# Recitals\n# Section 1 - Entire Contract\n# Section 2 - Scope\n# Section 3 - Contract Price\n# Section 4 - Subcontract Provisions\n# Section 5 - Special Provisions\n# General Subcontract Provisions\n## Insurance\n## Indemnity\n## Execution Signatures","[{\"question\":\"What contract framework does the subcontract rely on?\",\"answer\":\"The agreement states that the Prime Contract and Contract Documents are incorporated by reference and have the same force and effect as if fully set forth. The subcontractor is also bound to the contractor to the same extent regarding the work covered.\"},{\"question\":\"How is the subcontract price calculated under this agreement?\",\"answer\":\"The price is based on the subcontractor’s cost of work plus a fee, with a not-to-exceed maximum of $2,151,860. Additions and deductions apply for agreed changes in the work.\"},{\"question\":\"What insurance obligations must the subcontractor meet?\",\"answer\":\"Before performing work or delivering materials, the subcontractor must provide insurance certificates showing required coverages and confirm the insurance will not be canceled without ten days written notice to the contractor. These coverages must remain in force until the work is fully completed, and subcontractors of any tier must also carry the required insurance.\"}]","Subcontract Agreement - Cost Plus Not To Exceed - Sample | PDF"]