[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-detail-242037-en":53,"doc-seo-242037-105":74},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":5,"data":54},{"doc_id":55,"user_id":56,"nickname":57,"user_avatar":58,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":60,"doc_content":61,"file_id":62,"file_url":63,"file_type":64,"file_size":65,"view_count":66,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":67,"language_code":68,"site_id":69,"html_lang":68,"table_of_contents":70,"faqs":71,"seo_title":72,"seo_description":60,"update_tm":73,"read_time":4},242037,549768702563,"Fahsai","https://ap-avatar.wpscdn.com/avatar/8000c4aa63b76e948b?x-image-process=image/resize,m_fixed,w_180,h_180&k=1786536092046926083","Stop Work Order - Section 4-101 of the PPRB OPSCR Rules and Regulations - Suspension & Validity Terms","Stop Work Order outlines a state-agency directive requiring the contractor to suspend specified work as of the effective date. The order instructs the contractor to take steps for future materials, services, subcontractors, and other actions to minimize costs to the state resulting from the order. It states the stop-work directive remains valid for 90 days unless the state agency issues other notification, and requires immediate compliance and reasonable efforts to reduce costs allocable to the covered work during the stoppage period.","Stop Work Order  \nSection 4-101 of the PPRB OPSCR Rules and Regulations  \nState Agency:  Contractor:   Contract Number:   Effective Date of Stop Work Order:   As of the Effective Date of this Stop Work Order, Contractor should suspend the following work:  \nThe Contractor shall take the following steps regarding future orders for materials, services, subcontractors, and/or other steps to minimize costs to the State resulting from this Order:  \nThis Stop Work Order shall be valid for 90 days, unless Contractor is otherwise notified by the State Agency. Pursuant to the Stop Work Order clause in the above referenced contract, the contractor shall forthwith comply with the terms of this Order and take a reasonable steps to minimize the occurrence of costs allocable to the work covered by the order during the period of work stoppage.  \nSignature:    \nAgency Head:    \nStop Work Order","cbCaik8vf4kyk0vs","https://ap.wps.com/l/cbCaik8vf4kyk0vs","pdf",405203,7,"English","en",105,"# Stop Work Order\n## Suspension of Work\n## Contractor Actions to Minimize Costs\n## Validity Period and Compliance\n## Signatures","[{\"question\":\"When must the contractor suspend the work under this Stop Work Order?\",\"answer\":\"Suspension applies as of the effective date shown on the order.\"},{\"question\":\"How should the contractor handle future orders for materials, services, and subcontractors?\",\"answer\":\"The contractor must take steps regarding future orders to minimize costs to the state resulting from the order.\"},{\"question\":\"How long is the Stop Work Order valid?\",\"answer\":\"The stop-work order is valid for 90 days unless the contractor is otherwise notified by the state agency.\"}]","Stop Work Order - Section 4-101 of the PPRB OPSCR Rules and Regulations - Suspension & Validity Terms | PDF",1789184897,{"code":4,"msg":75,"data":76},"ok",{"site_id":69,"language":68,"slug":77,"title":59,"keywords":78,"description":60,"schema_data":79,"social_meta":135,"head_meta":137,"extra_data":139,"updated_unix":140},"stop-work-order-section-4-101-of-the-pprb-opscr-rules-and-regulations-suspension-validity-terms","",{"@graph":80,"@context":134},[81,97,117],{"@type":82,"itemListElement":83},"BreadcrumbList",[84,88,91,94],{"item":85,"name":86,"@type":87,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":89,"name":10,"@type":87,"position":90},"https://docshare.wps.com/template/",2,{"item":92,"name":36,"@type":87,"position":93},"https://docshare.wps.com/template/forms/",3,{"item":95,"name":59,"@type":87,"position":96},"https://docshare.wps.com/template/stop-work-order-section-4-101-of-the-pprb-opscr-rules-and-regulations-suspension-validity-terms/242037/",4,{"url":95,"name":59,"@type":98,"image":99,"author":104,"headline":59,"publisher":106,"fileFormat":109,"inLanguage":68,"description":60,"dateModified":110,"datePublished":111,"encodingFormat":109,"isAccessibleForFree":112,"interactionStatistic":113},"DigitalDocument",{"url":100,"@type":101,"width":102,"height":103},"https://docshare.wps.com/thumbnails/stop-work-order-section-4-101-of-the-pprb-opscr-rules-and-regulations-suspension-validity-terms/242037.png","ImageObject",442,249,{"name":57,"@type":105},"Person",{"url":85,"name":107,"@type":108},"DocShare","Organization","application/pdf","2026-10-15","2026-09-12",true,{"@type":114,"interactionType":115,"userInteractionCount":66},"InteractionCounter",{"@type":116},"ViewAction",{"@type":118,"mainEntity":119},"FAQPage",[120,126,130],{"name":121,"@type":122,"acceptedAnswer":123},"When must the contractor suspend the work under this Stop Work Order?","Question",{"text":124,"@type":125},"Suspension applies as of the effective date shown on the order.","Answer",{"name":127,"@type":122,"acceptedAnswer":128},"How should the contractor handle future orders for materials, services, and subcontractors?",{"text":129,"@type":125},"The contractor must take steps regarding future orders to minimize costs to the state resulting from the order.",{"name":131,"@type":122,"acceptedAnswer":132},"How long is the Stop Work Order valid?",{"text":133,"@type":125},"The stop-work order is valid for 90 days unless the contractor is otherwise notified by the state agency.","https://schema.org",{"og:url":95,"og:type":136,"og:title":59,"og:site_name":107,"og:description":60},"article",{"robots":138,"canonical":95},"index,follow",{"doc_id":55,"site_id":69},1791293084]