[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-240141-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-240141-en":126},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","state-of-palestine-implementation-roadmap-for-the-nationally-determined-contributions-ndc-under-the-unfccc-guidance-note","State of Palestine - Implementation Roadmap for the Nationally Determined Contributions (NDC) Under the UNFCCC - Guidance Note","","Implementation Roadmap for the State of Palestine’s Nationally Determined Contributions (NDC) under the UNFCCC provides guidance for planning NDC implementation and establishing next steps. It outlines alignment with the Initial National Communication Report and National Adaptation Plan, and explains a five-module approach covering adaptation, mitigation, finance, MRV, and governance. The roadmap details mitigation outcomes and conditional and unconditional mitigation actions, and proposes steps such as barrier analysis, policy option appraisal, and policy design, including MRV through an annex.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/presentations/","Presentations",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/state-of-palestine-implementation-roadmap-for-the-nationally-determined-contributions-ndc-under-the-unfccc-guidance-note/240141/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/state-of-palestine-implementation-roadmap-for-the-nationally-determined-contributions-ndc-under-the-unfccc-guidance-note/240141.png","ImageObject",442,249,{"name":42,"@type":43},"Margaret","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-09-11",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",16,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the purpose of the guidance note in the roadmap?","Question",{"text":63,"@type":64},"It suggests next steps for planning the implementation of the State of Palestine’s NDC, with Annex 1 providing an outline MRV system to track implementation.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"How does the roadmap describe the framework for NDC implementation?",{"text":68,"@type":64},"It uses Ricardo Energy & Environment’s five-module framework: adaptation, mitigation, finance, Monitoring, Reporting and Verification (MRV), and governance.",{"name":70,"@type":61,"acceptedAnswer":71},"What mitigation outcomes and conditions does the NDC present for 2040?",{"text":72,"@type":64},"It presents two scenarios: Independence scenario at 24.4% by 2040 and Status quo scenario at 12.8% by 2040, both relative to Business as Usual and conditional on international support including finance, technology transfer, and capacity building.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},240141,1791722424,{"code":4,"msg":82,"data":83},"success",[84,88,93,98,103,107,112,117,122],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":86,"slug":87},11,90,"presentations",{"id":89,"doc_module":22,"doc_module_name":25,"category_name":90,"show_sort_weight":91,"slug":92},12,"Resumes",80,"resumes",{"id":94,"doc_module":22,"doc_module_name":25,"category_name":95,"show_sort_weight":96,"slug":97},14,"Invoices",70,"invoices",{"id":99,"doc_module":22,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},15,"Posters",60,"posters",{"id":55,"doc_module":22,"doc_module_name":25,"category_name":104,"show_sort_weight":105,"slug":106},"Social Media",50,"social-media",{"id":108,"doc_module":22,"doc_module_name":25,"category_name":109,"show_sort_weight":110,"slug":111},17,"Forms",40,"forms",{"id":113,"doc_module":22,"doc_module_name":25,"category_name":114,"show_sort_weight":115,"slug":116},18,"Letters",30,"letters",{"id":118,"doc_module":22,"doc_module_name":25,"category_name":119,"show_sort_weight":120,"slug":121},21,"Paper Templates",5,"papers-templates",{"id":123,"doc_module":22,"doc_module_name":25,"category_name":124,"show_sort_weight":4,"slug":125},158,"General","general-158",{"code":4,"msg":82,"data":127},{"doc_id":79,"user_id":128,"nickname":42,"user_avatar":129,"doc_module":22,"category_id":85,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":135,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":140,"read_time":141},137451207643,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","STATE OF PALESTINE  \nImplementation Roadmap for the Nationally Determined Contributions (NDC) Under United Nations Framework Convention on Climate Change  \n\"Guidance Note\"  \n1 Introduction  \nIn March 2016, the State of Palestine became a Party to the UNFCCC and one month later signed and ratified the Paris Agreement. As such, the State of Palestine will be submitting its first NDC in 2017.The NDC is consistent with the Initial National Communication Report (INCR) and the National Adaptation Plan (NAP) , which were reviewed and approved by stakeholders in 2016. The NDC is also consistent with the recently developed draft sectoral strategies. This means that the actions put forward in the NDC have been discussed with stakeholders and agreed at the ministerial and sectoral level.  \nThis document suggests next steps for planning the implementation of the State of Palestine’s NDC, with Annex 1 providing an outline MRV system for tracking the implementation of the NDC. The approach and structure of the document draws on Ricardo Energy & Environment’s 5 module framework for NDC implementation , as shown below:  \n􀁸 Adaptation: integrated adaptation planning builds long-term resilience to the impacts of climate change by mainstreaming adaptation into national and sectoral plans, drawing on UNFCCC’s National Adaptation Plan process.  \n􀁸 Mitigation: long-term mitigation strategies aim to reduce greenhouse gas emissions through national and sector plans that are aligned with development priorities, and by using the right tools to minimise costs and deliver transformational changes.  \n􀁸 Finance: a climate finance framework should match a country’s needs against funding streams, and include strategies to access these.  \n􀁸 Monitoring, Reporting and Verification (MRV): these systems track implementation and apply the lessons learned, thus enhancing analytical capacity and understanding about which policies and actions work best, and why.  \n􀁸 Governance: good governance maintains momentum in implementing NDCs. This includes: creating an enabling environment for action; driving progress; coordinating activities, processes and structures for decision-making; stakeholder engagement, both inside and outside of government; and maintaining strong political will at the highest levels.  \nFigure 1 : Ricardo Energy & Environment’s 5 module framework forINDC implementation1  \n1 For further information please see: [http://www.cdkn.org/ndc-guide/](http://www.cdkn.org/ndc-guide/)  \n2 Next steps for NDC implementation  \nThis section set out suggested next steps for NDC implementation. Note that not all activities are sequential and many can be implemented in parallel. The next steps and their indicative timings are intended as a guide only.  \n2.1 Mitigation  \nThe NDC sets out the below mitigation outcomes for the State of Palestine:  \n􀁸 Independence scenario: 24.4% by 2040 relative to Business as Usual (BAU) , conditional on international support in the form of finance, technology transfer, and capacity building.  \n􀁸 Status quo scenario: 12.8% by 2040 relative to BAU, conditional on international support in the form of finance, technology transfer, and capacity building.  \nThe NDC presents all mitigation actions that were prioritised within the INCR (both the ‘realistic’mitigation actions and ‘all’ mitigation actions) and specifies that their implementation is conditional on receiving international support. These actions are listed below:  \n􀁸 Solar photovoltaic  \n􀁸 Energy efficiency in buildings  \n􀁸 Use of waste for cement production  \n􀁸 Use of waste for electricity generation  \n􀁸 Reduction of methane from landfill  \n􀁸 Energy efficient lighting  \n􀁸 Hybrid electric vehicles  \n􀁸 Compressed natural gas powered vehicles  \n􀁸 Modal shift programmes  \n􀁸 Afforstation  \nIn addition to the ten conditional mitigation actions above, during the process of developing the NDC, new conditional mitigation actions were identified since the publication of the INCR; these were ","cbCaicYzmPWySmem","https://ap.wps.com/l/cbCaicYzmPWySmem","pdf",1560510,29,"English","# 1 Introduction\n## 2 Next steps for NDC implementation\n### 2.1 Mitigation","[{\"question\":\"What is the purpose of the guidance note in the roadmap?\",\"answer\":\"It suggests next steps for planning the implementation of the State of Palestine’s NDC, with Annex 1 providing an outline MRV system to track implementation.\"},{\"question\":\"How does the roadmap describe the framework for NDC implementation?\",\"answer\":\"It uses Ricardo Energy \\u0026 Environment’s five-module framework: adaptation, mitigation, finance, Monitoring, Reporting and Verification (MRV), and governance.\"},{\"question\":\"What mitigation outcomes and conditions does the NDC present for 2040?\",\"answer\":\"It presents two scenarios: Independence scenario at 24.4% by 2040 and Status quo scenario at 12.8% by 2040, both relative to Business as Usual and conditional on international support including finance, technology transfer, and capacity building.\"}]","State of Palestine - Implementation Roadmap for the Nationally Determined Contributions (NDC) Under the UNFCCC - Guidance Note | PDF",1789157852,10]