[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-304978-105":53,"doc-detail-304978-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","state-of-connecticut-city-of-milford-monthly-building-report-april-2022","State of Connecticut City of Milford Monthly Building Report - April 2022","","Monthly building report covering the City of Milford, Connecticut for the period 04/01/2022 to 04/30/2022. The report lists issued permits by PIN, owner, and permit category, including Window/Door replacements, sign installation, swimming pools and hot tubs, additions/alterations, re-roofing, demolition, solar installation, and new structure construction. Each entry provides the work description, contractor, project cost, and total fee, enabling tracking of permit activity and associated charges during April 2022.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/state-of-connecticut-city-of-milford-monthly-building-report-april-2022/304978/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/state-of-connecticut-city-of-milford-monthly-building-report-april-2022/304978.png","ImageObject",442,249,{"name":88,"@type":89},"Cipher","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-09-26","2026-09-19",true,{"@type":98,"interactionType":99,"userInteractionCount":73},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What time period does the monthly building report cover?","Question",{"text":108,"@type":109},"It covers 04/01/2022 to 04/30/2022.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What information is included for each issued permit?",{"text":113,"@type":109},"Each record includes a PIN, owner name, permit type, date issued, address, work description, contractor name, project cost, and total fee.",{"name":115,"@type":106,"acceptedAnswer":116},"Which types of construction activities appear in the report?",{"text":117,"@type":109},"The report includes items such as window/door replacements, sign installations, swimming pools and hot tubs, additions/alterations, re-roofing, demolition, solar installations, and new structures.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},304978,1790400471,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":73,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":15},687208528416,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","State of Connecticut City of Milford Monthly Building Report  \n04/01/2022 to 04/30/2022  \n| PIN Owner Name Permit For Date Issued Address Work Description Contractor Name Project Cost Total Fee |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| B-22- 0497 | NOWICKI VERONIKA | Window/Door\u003Cbr>Replacements | 04/01/2022 | 61 BENSON ST | remove and replace 6 same size windows, like w/like, no structural changes-dp rating for all 35 |  | $5,654.00 | $95.00 |\n| B-22-\u003Cbr>0503 | FOREVER\u003Cbr>REALTY\u003Cbr>INC | Sign-C | 04/01/2022 | 12 BROAD ST | Replace existing awning with new 3' x 14'-6\" (43.5 SF) wall sign and make final connection to existing power source within 6' of sign. | GLENN W\u003Cbr>DEMOTT | $7,600.00 | $146.00 |\n| B-22- 0402 | MACRI VINCENT\u003Cbr>ROCCO & | Swimming Pools and Hot Tubs | 04/01/2022 | 19 FRANKLIN RD | Install 12'x24 Inground Pool to code with 650 sqft concrete pool patio | AQUATIC POOL & SPA SERVICE\u003Cbr>INC | $27,000.00 | $430.00 |\n| B-22-\u003Cbr>0439 | MURPHY\u003Cbr>KATHERINE\u003Cbr>E | Addition/Al\u003Cbr>teration-R | 04/01/2022 | 77 HAWLEY\u003Cbr>AVE | Two story addition to existing home. Two car garage and storage area first floor, second floor Den, Bedroom laundry full bath and porch. | JOSEPH M\u003Cbr>HANNON JR | $85,000.00 | $1,300.00 |\n\n| B-22- 0170 | STACH MICHAEL E\u003Cbr>& | Swimming Pools and Hot Tubs | 04/04/2022 | 63 MAPLE ST | Install 16' x 36' inground vinyl liner swimming pool with galvanized steel walls. Pool will have an underwater color LED light and a propane heater. |  | $56,000.00 | $865.00 |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| B-22-\u003Cbr>0493 | CONWAY\u003Cbr>KEVIN R & | Alteration\u003Cbr>R | 04/04/2022 | 63 GREER CIR | requesting permit to legalize work done prior to 2016 that converted the dining room into a 3rd bedroom |  | $5,000.00 | $100.00 |\n| B-22- 0528 | REA THOMAS J | AlterationR | 04/05/2022 | 18 PEARL ST | Install (7) smart vents in existing wood-framed walls inan AE flood zone. |  | $1,600.00 | $55.00 |\n| B-22-\u003Cbr>0526 | WARREN\u003Cbr>PATRICIA\u003Cbr>ANN | Re-roofing\u003Cbr>R | 04/05/2022 | 18 FIELD CT | remove existing roof system down to sheathing on both main house and guest house. Dispose of in on site dumpster. Tape and roll all plywood seams. Install weather and ice on lower 3-6' of eaves on entire perimeter. install GAFfeltbuster on remainder. install new 40 yr GAF arch shingle system. install using a 5-7 hurricane nailing pattern. install | WONG ALLAND & RYAN SHEILA M &\u003Cbr>SURV | $10,000.00 | $175.00 |\n\n\n|  |  |  |  |  | new cobra ridge vent. install lifetime cap. |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| B-22- 0332 | WILTSIEDODY DOYLE 1/5 & | Demolition – R-non designated | 04/05/2022 | 1 SMITHS POINT RD | Demolition of non designated structure constructed in 1948 | ROMANO BROTHERS BUILDERS LLC | $20,000.00 | $305.00 |\n| B-22-\u003Cbr>0531 | FREDERICK\u003Cbr>S VALERIE | Re-roofing\u003Cbr>R | 04/06/2022 | 79 GREER CIR | Remove existing shingles and apply 14 sqsof new GAF Timberline shingles along with ice and snow barrier on the whole roof. |  | $9,000.00 | $160.00 |\n| B-22- 0530 | RECCHIA ALFRED J JR | Re-roofingR | 04/06/2022 | 6 MILLS AVE | strip entire roof down to wood decking. inspect and replace all plywood as needed, tape all plywood seams, install ice barrier and new C'Teed shingles (9 sq) as well as SBS with base sheet (3.15 sq) |  | $8,621.00 | $160.00 |\n| B-22-\u003Cbr>0411 | KORKMAZ\u003Cbr>ALI | Re-roofing\u003Cbr>R | 04/06/2022 | 62 MONROE ST | Removing & disposing old roofing material Installing new Owens Corning Duration shingle 17 Squares Shingle Color Slatestone Gray |  | $11,672.00 | $205.00 |\n\n\n| B-22- 0544 | MULLEN CHRISTOPHERM & ANN\u003Cbr>N | Re-roofingR | 04/07/2022 | 598 POND POINT AVE | Remove all existing layers of roofing. Inspect roof deck for rotted wood and replace if found. Install ice and water to entire roof deck. Install all new edge metals, vents, plumbing boots, and New AR shingles with matching caps. Custom bend and install new copper chimne","cbCaiiPIjcHKG0t0","https://ap.wps.com/l/cbCaiiPIjcHKG0t0","pdf",246829,35,"English","# Building Permits Issued (04/01/2022 to 04/30/2022)","[{\"question\":\"What time period does the monthly building report cover?\",\"answer\":\"It covers 04/01/2022 to 04/30/2022.\"},{\"question\":\"What information is included for each issued permit?\",\"answer\":\"Each record includes a PIN, owner name, permit type, date issued, address, work description, contractor name, project cost, and total fee.\"},{\"question\":\"Which types of construction activities appear in the report?\",\"answer\":\"The report includes items such as window/door replacements, sign installations, swimming pools and hot tubs, additions/alterations, re-roofing, demolition, solar installations, and new structures.\"}]","State of Connecticut City of Milford Monthly Building Report - April 2022 | PDF",1789820591]