[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-165514-en":3,"doc-seo-165514-105":30,"detail-sidebar-cat-1-en-105":91},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":11,"category_id":12,"category_name":13,"doc_title":14,"doc_description":15,"doc_content":16,"file_id":17,"file_url":18,"file_type":19,"file_size":20,"view_count":4,"is_deleted":4,"is_public":11,"is_downloadable":11,"audit_status":11,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":15,"update_tm":28,"read_time":29},165514,2336474466712,"Quinn Holloway","https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd",1,11,"Presentations","Standard Procurement Document - Standard Bidding Document for Procurement of Works - Version January 2019","Standard Bidding Document (SBD) for procurement of works financed by KfW in two-stage international competitive bidding procedures after prequalification, covering requirements for bidding procedures, works requirements, and contract conditions. The document is prepared by KfW based on multilateral development bank master procurement guidance, and includes environmental, social, and health-and-safety requirements (ESHS). It provides employer guidance notes to be removed before issuance and includes sample formats for invitations for bids, bid submission rules, and referenced contract elements.","STANDARD PROCUREMENT DOCUMENT\nStandard Bidding Document for Procurement of Works\nin Projects with Financing from KfW\nFor use in two stage international competitive bidding procedure\u000bfollowing prequalification for admeasurement works contracts*\nVersion: January 2019\n\u000fPreface\nThis Standard Bidding Document (“SBD”) for Procurement of Works has been prepared by KfW Development Bank (“KfW”) and is based on the Master Procurement Document “Standard Bidding Documents for Procurement of Works and User’s Guide” developed by the Multilateral Development Banks and International Financing Institutions, which represents the best practices of these institutions.\nProject Executing Agencies (referred to hereafter as “Employers”) shall use this SBD in the procurement of works, financed in whole or in part by KfW in two stage International Competitive Bidding (ICB) procedures for admeasurement works contracts. The work requirements included herein have been extended to include environmental and social and health and safety requirements (ESHS). These requirements need to be adopted to reflect the ESHS impacts and risks of the implementation of the particular works contract.\nThis SBD is to be used for the selection of Bidders in two stage International Competitive Bidding procedures as described in Section 2 of the KfW Guidelines for Procurement of Goods, Works and Associated Services in Financial Cooperation with Partner Countries (“Guidelines”) and where applicable, in National Competitive Bidding procedures. Employers should seek advice from local competent sources to ascertain its comprehensiveness as well as its suitability in terms of the applicable law. KfW will not be liable for the use of this document by Employers in part or full.\n[The italicized text in square brackets] is notes to the Employer, providing guidance to the Employer in preparing a specific bidding document. Notes to the Employer shall be deleted from the document before it is issued to the shortlisted Bidders.\nThis document includes the FIDIC Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer, Multilateral Development Bank Harmonised Edition of June 2010 (FIDIC Pink Book) as licensed by KfW.\nFeedback to or questions about this document should be in writing to the following address:\n\u0013 HYPERLINK \"mailto:FZ-Vergabemanagement@kfw.de\" \u0014FZ-Vergabemanagement@kfw.de\u0015\n\u000f[Sample Format for Invitation for Bids Following Prequalification]\n[Insert Country]\n[Insert Project/Phase Title]\n[Insert ICB No.]\nThe [insert name of the Employer] [has received/has applied for/intends to apply for] financing from KfW toward the cost of the [insert name of project/phase title], and intends to apply part of the proceeds toward payments under the contract for [insert title of contract].\nThe [insert name of the Employer] now invites sealed bids from prequalified eligible bidders for [insert brief description of Works required, including quantities, location, construction period, margin of preference if applicable, etc.].  The following entities have been shortlisted to participate in this bidding procedure:\n[Insert the list of the pre-qualified bidders]\nBidding will be conducted by means of the International Competitive Bidding procedure as specified in the KfW Guidelines for Guidelines for Procurement of Goods, Works and associated Services in Financial Cooperation with Partner Countries (“KfW Guidelines”).\nPrequalified eligible bidders may obtain further information from [insert name of Employer, insert name and e-mail of officer in charge].\nA complete set of bidding documents is available to the prequalified eligible [insert the description of how the prequalified bidders may access the tender document, for example enclosed with the Invitation for Bids or downloadable as an electronic file].\nBids must be delivered to the address indicated in the clause ITB 22.1 of the bidding document on or before [insert time and date].  Late bids will be rejected. B","cbCaioBX4eVqNvpv","https://ap.wps.com/l/cbCaioBX4eVqNvpv","docx",530610,243,"English","en",105,"# Preface\n## Role of the SBD for works procurement\n## Environmental, social and health-and-safety (ESHS) requirements\n# Sample Format for Invitation for Bids Following Prequalification\n## Invitation and shortlisted bidders\n## Submission, delivery address, and bid opening\n# Table of Contents\n## Part 1 – Bidding Procedures\n## Section I. Instructions to Bidders\n## Section II. Bid Data Sheet\n## Section III. Evaluation and Qualification Criteria\n## Section IV. Bidding Forms\n## Section V. Eligibility Criteria\n## Section VI. KfW Policy – Sanctionable Practice – Social and Environmental Responsibility\n## Part 2 – Works Requirements\n## Section VII. Works Requirements\n## Part 3 – Conditions of Contract (CC) and Contract Forms\n## Section VIII. General Conditions (GC)\n## Section IX. Particular Conditions (PC)\n## Section X. Contract Forms","[{\"question\":\"What procurement process does this Standard Bidding Document support?\",\"answer\":\"It supports two-stage international competitive bidding (ICB) procedures for procurement of works, following prequalification.\"},{\"question\":\"Who prepares and provides this document for use by employers?\",\"answer\":\"It is prepared by KfW Development Bank (KfW) for use by project executing agencies (employers).\"},{\"question\":\"How are environmental and social requirements handled in the bidding process?\",\"answer\":\"The work requirements are extended to include environmental, social, and health-and-safety (ESHS) requirements, which must be adopted to reflect the contract’s impacts and risks.\"}]","Standard Procurement Document - Standard Bidding Document for Procurement of Works - Version January 2019 | DOCX",1788172942,85,{"code":4,"msg":31,"data":32},"ok",{"site_id":24,"language":23,"slug":33,"title":14,"keywords":34,"description":15,"schema_data":35,"social_meta":86,"head_meta":88,"extra_data":90,"updated_unix":28},"standard-procurement-document-standard-bidding-document-for-procurement-of-works-version-january-2019","",{"@graph":36,"@context":85},[37,54,68],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,48,51],{"item":41,"name":42,"@type":43,"position":11},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":47},"https://docshare.wps.com/template/","Template",2,{"item":49,"name":13,"@type":43,"position":50},"https://docshare.wps.com/template/presentations/",3,{"item":52,"name":14,"@type":43,"position":53},"https://docshare.wps.com/template/standard-procurement-document-standard-bidding-document-for-procurement-of-works-version-january-2019/165514/",4,{"url":52,"name":14,"@type":55,"author":56,"headline":14,"publisher":58,"fileFormat":61,"inLanguage":23,"description":15,"dateModified":62,"datePublished":62,"encodingFormat":61,"isAccessibleForFree":63,"interactionStatistic":64},"DigitalDocument",{"name":9,"@type":57},"Person",{"url":41,"name":59,"@type":60},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-08-31",true,{"@type":65,"interactionType":66,"userInteractionCount":4},"InteractionCounter",{"@type":67},"ViewAction",{"@type":69,"mainEntity":70},"FAQPage",[71,77,81],{"name":72,"@type":73,"acceptedAnswer":74},"What procurement process does this Standard Bidding Document support?","Question",{"text":75,"@type":76},"It supports two-stage international competitive bidding (ICB) procedures for procurement of works, following prequalification.","Answer",{"name":78,"@type":73,"acceptedAnswer":79},"Who prepares and provides this document for use by employers?",{"text":80,"@type":76},"It is prepared by KfW Development Bank (KfW) for use by project executing agencies (employers).",{"name":82,"@type":73,"acceptedAnswer":83},"How are environmental and social requirements handled in the bidding process?",{"text":84,"@type":76},"The work requirements are extended to include environmental, social, and health-and-safety (ESHS) requirements, which must be adopted to reflect the contract’s impacts and risks.","https://schema.org",{"og:url":52,"og:type":87,"og:title":14,"og:site_name":59,"og:description":15},"article",{"robots":89,"canonical":52},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":92},[93,96,101,106,111,116,121,126,131],{"id":12,"doc_module":11,"doc_module_name":46,"category_name":13,"show_sort_weight":94,"slug":95},90,"presentations",{"id":97,"doc_module":11,"doc_module_name":46,"category_name":98,"show_sort_weight":99,"slug":100},12,"Resumes",80,"resumes",{"id":102,"doc_module":11,"doc_module_name":46,"category_name":103,"show_sort_weight":104,"slug":105},14,"Invoices",70,"invoices",{"id":107,"doc_module":11,"doc_module_name":46,"category_name":108,"show_sort_weight":109,"slug":110},15,"Posters",60,"posters",{"id":112,"doc_module":11,"doc_module_name":46,"category_name":113,"show_sort_weight":114,"slug":115},16,"Social Media",50,"social-media",{"id":117,"doc_module":11,"doc_module_name":46,"category_name":118,"show_sort_weight":119,"slug":120},17,"Forms",40,"forms",{"id":122,"doc_module":11,"doc_module_name":46,"category_name":123,"show_sort_weight":124,"slug":125},18,"Letters",30,"letters",{"id":127,"doc_module":11,"doc_module_name":46,"category_name":128,"show_sort_weight":129,"slug":130},21,"Paper Templates",5,"papers-templates",{"id":132,"doc_module":11,"doc_module_name":46,"category_name":133,"show_sort_weight":4,"slug":134},158,"General","general-158"]