[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-240665-105":53,"doc-detail-240665-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","stakeholder-engagement-plan-st-george-solar-pv-project-phase-i-and-ii","Stakeholder Engagement Plan - St. George Solar PV Project (Phase I and II)","","Stakeholder Engagement Plan for the St. George Solar PV Project (Phase I and II) in Bulgaria, issued under the Preliminary Environmental and Social Impact Assessment (ESIA) framework (Volume 4). It defines engagement principles and objectives, outlines project summary and area of impact, and maps national and international requirements including IFC Performance Standards and EBRD Performance Requirement 10. The plan details prior engagement, stakeholder identification and analysis, an engagement action plan and tools, support for women’s participation, vulnerable groups considerations, roles and resources, an external grievance mechanism, and monitoring, evaluation, and reporting.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":51,"@type":70,"position":76},"https://docshare.wps.com/template/general/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/stakeholder-engagement-plan-st-george-solar-pv-project-phase-i-and-ii/240665/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/stakeholder-engagement-plan-st-george-solar-pv-project-phase-i-and-ii/240665.png","ImageObject",442,249,{"name":88,"@type":89},"Rowan","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-09-21","2026-09-11",true,{"@type":98,"interactionType":99,"userInteractionCount":9},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What is the purpose of the Stakeholder Engagement Plan (SEP) for the project?","Question",{"text":108,"@type":109},"It sets stakeholder engagement principles and objectives, and provides a structured approach to identify stakeholders, plan engagement activities, and manage engagement outcomes within the ESIA framework.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"Which requirements and standards guide the stakeholder engagement approach?",{"text":113,"@type":109},"The plan covers Bulgarian national regulations and international lender requirements, including IFC Performance Standards and EBRD Performance Requirement 10.",{"name":115,"@type":106,"acceptedAnswer":116},"How does the SEP handle participation of women and vulnerable groups?",{"text":117,"@type":109},"It includes dedicated sections describing measures to encourage women’s participation and address the needs of vulnerable groups through targeted engagement considerations.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},240665,1789974525,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":50,"category_name":51,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":76,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":141},1099514067415,"https://ap-avatar.wpscdn.com/avatar/100002539d78ffe74a7?x-image-process=image/resize,m_fixed,w_180,h_180&k=1779092875211072502","STAKEHOLDER ENGAGEMENT PLAN  \nSt. George Solar PV Project (Phase I and II) -Bulgaria  \nReport details:  \n\n| Project name | ST. GEORGE SOLAR PV PROJECT (Phase I and II) |\n| --- | --- |\n| Project location | Municipality if Silistra, Polkovnik Lambrinovo village, Bulgaria |\n| Document title | Preliminary Environmental And Social Impact Assessment (ESIA):\u003Cbr>Volume 4 – Stakeholder Engagement Plan (SEP) |\n| Developer | Rezolv Energy S.A. |\n| Date of issue | April 2024 |\n| Document no. | 3551 |\n\nDocument control:  \n\n| Version | Date | Description / Updates | Author | Reviewer | Approver |\n| --- | --- | --- | --- | --- | --- |\n| 1.0 | October 2023 | Preliminary SEP | AON | N Davies | D Jackson |\n| 2.0 | January 2024 | First Draft SEP for IFC review | AON | N Davies | D Jackson |\n| 3.0 | 17 April 2024 | Second draft SEP for IFC review -updated Table 7 with information about the stakeholder meetings on draft ESIA | AON | N Davies | D Jackson |\n| 4.0 | 20 August 2024 | Final update (include updates based on SE household survey) | AON | N Davies | D Jackson |\n\nContents  \nList of Tables...................................................................................................................................... 5  \nList of Figures .................................................................................................................................... 5  \nAcronyms and Abbreviations ........................................................................................................... 6  \n1. Introduction ................................................................................................................................... 7  \n1.1. Background .......................................................................................................................... 7  \n1.2. Scope of this SEP ................................................................................................................. 7  \n1.3. Stakeholder engagement principles ................................................................................... 8  \n1.4. Stakeholder engagement objectives ................................................................................... 9  \n2. Project Summary ........................................................................................................................ 10  \n2.1. Project organization .......................................................................................................... 10  \n2.2. Project location and description of area of impact (AOI) .............................................. 10  \n2.3. Expected impacts ............................................................................................................... 13  \n2.4. Permitting status, current land use and land take requirements .................................. 14  \n2.5. Project timeline .................................................................................................................. 16  \n3. National and international requirements on stakeholder engagement .................................. 16  \n3.1. Bulgarian National Regulations ....................................................................................... 16  \n3.2. International Lender requirements ................................................................................. 17  \nIFC Performance Standards ...................................................................................................... 17  \nEBRD Performance Requirement 10 ........................................................................................ 18  \n4. Summary of previous engagement for the Project................................................................... 20  \n5. Project stakeholders .................................................................................................................... 20  \n5.1. Stakeholder identification ..............................................................................","cbCaitWRHLkr2V5i","https://ap.wps.com/l/cbCaitWRHLkr2V5i","pdf",2360834,71,"English","# 1. Introduction\n## 1.1. Background\n## 1.2. Scope of this SEP\n## 1.3. Stakeholder engagement principles\n## 1.4. Stakeholder engagement objectives\n# 2. Project Summary\n## 2.1. Project organization\n## 2.2. Project location and description of area of impact (AOI)\n## 2.3. Expected impacts\n## 2.4. Permitting status, current land use and land take requirements\n## 2.5. Project timeline\n# 3. National and international requirements on stakeholder engagement\n## 3.1. Bulgarian National Regulations\n## 3.2. International Lender requirements\n# 4. Summary of previous engagement for the Project\n# 5. Project stakeholders\n## 5.1. Stakeholder identification\n## 5.2. Stakeholder analysis\n# 6. Engagement action plan\n# 7. Engagement tools\n# 8. Encouraging the participation of women\n# 9. Vulnerable groups\n# 10. Resources and responsibilities\n## 10.1. Project Company\n## 10.2. CLO specific responsibilities\n## 10.3. EPC Contractor\n# 11. External grievance mechanism\n## 11.1. Overview\n## 11.2. Detailed GM procedure\n## 11.3. Contact Information\n# 12. Monitoring, evaluation, and reporting\n## 12.1. Overview","[{\"question\":\"What is the purpose of the Stakeholder Engagement Plan (SEP) for the project?\",\"answer\":\"It sets stakeholder engagement principles and objectives, and provides a structured approach to identify stakeholders, plan engagement activities, and manage engagement outcomes within the ESIA framework.\"},{\"question\":\"Which requirements and standards guide the stakeholder engagement approach?\",\"answer\":\"The plan covers Bulgarian national regulations and international lender requirements, including IFC Performance Standards and EBRD Performance Requirement 10.\"},{\"question\":\"How does the SEP handle participation of women and vulnerable groups?\",\"answer\":\"It includes dedicated sections describing measures to encourage women’s participation and address the needs of vulnerable groups through targeted engagement considerations.\"}]","Stakeholder Engagement Plan - St. George Solar PV Project (Phase I and II) | PDF",1789163871,25]