[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-245317-105":53,"doc-detail-245317-en":119},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":112,"head_meta":114,"extra_data":116,"updated_unix":118},105,"en","st-james-st-william-sub-contractor-health-safety-and-environmental-standards","St James / St William - Sub-Contractor Health, Safety and Environmental Standards - Standards","","Guidance on how St James / St William expects subcontractors to meet health, safety and environmental standards across construction sites. Defines commitment to shared objectives within the supply chain and outlines how subcontractors are assessed for competence before works begin. Covers management and control measures, safe systems of work, and site procedures including risk assessment, training and induction, communication, occupational health, and substance testing. Includes operational rules for site setup, safety governance, emergency and accident reporting, and ongoing monitoring and auditing with specified appendices of contractor requirements.",{"@graph":63,"@context":111},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/st-james-st-william-sub-contractor-health-safety-and-environmental-standards/245317/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/st-james-st-william-sub-contractor-health-safety-and-environmental-standards/245317.png","ImageObject",442,249,{"name":88,"@type":89},"Arica Lee","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-21","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",9,{"@type":103,"mainEntity":104},"FAQPage",[105],{"name":106,"@type":107,"acceptedAnswer":108},"What happens if a subcontractor does not comply with the standards?","Question",{"text":109,"@type":110},"Poor compliance may result in the contractor being removed from the St James / St William contractor database, as St James / St William audits and reviews performance through scheduled auditing systems.","Answer","https://schema.org",{"og:url":78,"og:type":113,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":115,"canonical":78},"index,follow",{"doc_id":117,"site_id":56},245317,1791526109,{"code":4,"msg":5,"data":120},{"doc_id":117,"user_id":121,"nickname":88,"user_avatar":122,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":123,"file_id":124,"file_url":125,"file_type":126,"file_size":127,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":128,"language":129,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":130,"faqs":131,"seo_title":132,"seo_description":61,"update_tm":133,"read_time":134},8796096645457,"https://ap-avatar.wpscdn.com/avatar/800003749518d68ffe3?x-image-process=image/resize,m_fixed,w_180,h_180&k=1779345340919836971","SUB-CONTRACTOR HEALTH, SAFETY AND ENVIRONMENT STANDARDS  \nContents  \n1. Introduction  \n2. St James / St William Policies  \n3. Sub-contractor Management & Control  \nSafe Systems of Work  \n3.1 Pre-qualification  \n3.2 Pre-Start Meetings  \n3.3 Risk Assessments  \n3.4 Sub-Sub-Contracting  \n3.5 Method Statements  \n3.6 Training, Competency & Induction  \n3.7 Toolbox Talks  \n3.8 Communication and Meetings  \n3.9 Occupational Health  \n3.10 Drug and Alcohol Testing  \n3.11 Agency Workers  \nSite Set Up  \n3.12 Site Welfare Provisions  \n3.13 Site Security and Access Control  \n3.14 Traffic Management & Material Movement 3.15 Storage Containers  \n3.16 Asbestos  \nOperation Standards  \n3.17 Site Induction  \n3.18 Daily Task Briefings  \n3.19 Access and Egress  \n3.20 Safety Rules  \n3.21 Golden Rules  \n3.22 Plant and Equipment (PUWER)  \n3.23 Lifting Operations  \n3.24 Non-Crane Lifting Operations  \n3.25 Lifting Inductions, briefings and meetings  \n3.26 Scaffolding  \n3.27 Temporary Works  \n3.28 Lighting  \n3.29 Housekeeping  \n3.30 Fire Prevention  \n3.31 Work at Height  \n3.32 COSHH  \n3.33 Working in Confined Spaces  \n3.34 PPE  \n3.35 Supervision  \n3.36 Protection of the Public  \n3.37 Permits to Work  \n3.38 Accident, Incident and Near Miss Reporting 3.39 Disciplinary Code  \n3.40 Monitoring, Auditing and Review  \n3.41 Site Safety Performance (Safety League)  \n3.42 Intelex  \n3.43 Health and Safety File  \n4. Appendices  \n4.1 SWSJ-G-2.2 Contractor Requirements-Cladding  \n4.2 SWSJ-G-2.3 Contractor Requirements – Groundworks  \n4.3 SWSJ-G-2.4 Contractor Requirements – M&E  \n4.4 SWSJ-G-2.5 Contractor Requirements-Piling  \n4.5 SWSJ-G-2.6 Contractor Requirements-Scaffolding  \n4.6 SWSJ-G-2.7 Contractor Requirements – Superstructures & Frames  \n4.7 SWSJ-G-2.8 Contractor Requirements-Landscaping  \n4.8 SWSJ-G-2.9 Contractor Requirements-Roofing  \n4.9 SWSJ-G-2.10 Contractor Requirements – SFS Windows  \n4.10 SWSJ-G-2.11 Contractor Requirements – Brick & Blockwork  \n4.11 SWSJ-G-2.12 Contractor Requirements-Demolition  \n4.12 SWSJ-G-2.13 Contractor Requirements – Dry lining  \n4.13 SWSJ-G-2.14 Contractor Requirements – PCC Floors  \n4.14 SWSJ-G-2.15 Contractor Requirements – Crane erection, alteration and dismantle 4.15 SJ/SW-P5 .03 Commercial / Procurement Procedure  \n4.16 SJ/SW-F 4.06 B RAMS template  \n4.17 SJ/SW-F 4. 2H Operative Competence Assessment  \n4.18 SWSJ-P-26.2 Work at height Procedure  \n1. Introduction  \nSt James / St William is committed to achieving the highest possible standards of health, safety and environmental performance on every one of its construction sites.  \nWe recognise that to do this effectively, our supply chain must fully support and commit to the same aims and objectives. We believe that only by working closely together and focusing on common health, safety and environmental objectives, can a measurable and sustainable improvement in performance be assured.  \nThis guidance document, ‘Sub-Contractor’s Health, Safety and Environmental Standards’, applies to all subcontractors that have been secured to work within or supply any St James / St William establishment, to ensure that they understand the health, safety and environmental standards which we advocate on our construction projects.  \nThis document does not detract from information provided within the Construction Phase Plan, Fire Plan, Site Waste Management Plan or any other contract documents, that form the source for all specific information and typically constitutes initial information for sub-contractors.  \nSt James / St William expects each sub-contractor to only use competent members of their own organisation to carry out any activities they are contracted to undertake. As such, each sub-contractor should not sub-let activities under any circumstances, unless previously agreed with the senior St James / St William management team.  \nThe contractors should familiarise themselves with the standards set out in this document and ensure that they are brought to the attention of their sub-contr","cbCaioHrKjwjT1RO","https://ap.wps.com/l/cbCaioHrKjwjT1RO","pdf",1487902,69,"English","# Introduction\n# St James / St William Policies\n# Sub-contractor Management & Control\n## Safe Systems of Work\n## Site Set Up\n## Operation Standards\n# Appendices","[{\"question\":\"What happens if a subcontractor does not comply with the standards?\",\"answer\":\"Poor compliance may result in the contractor being removed from the St James / St William contractor database, as St James / St William audits and reviews performance through scheduled auditing systems.\"}]","St James / St William - Sub-Contractor Health, Safety and Environmental Standards - Standards | PDF",1789227387,24]