[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-353140-105":53,"doc-detail-353140-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","spcc-plan-template-spill-prevention-control-and-countermeasure","SPCC Plan Template - Spill Prevention, Control and Countermeasure","","Spill Prevention, Control & Countermeasure (SPCC) guidance explains when a construction site or asphalt plant must comply with the U.S. EPA oil spill planning rule. It outlines key applicability thresholds, the conditions that create a reasonable expectation of discharge to navigable waters, and the regulatory elements required in a comprehensive SPCC plan, including secondary containment, inspections, recordkeeping, reporting, and employee training. It also summarizes notable revisions, low-risk site provisions, and frequently asked compliance questions.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":41,"@type":70,"position":76},"https://docshare.wps.com/template/letters/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/spcc-plan-template-spill-prevention-control-and-countermeasure/353140/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/spcc-plan-template-spill-prevention-control-and-countermeasure/353140.png","ImageObject",442,249,{"name":88,"@type":89},"Aria","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-12","2026-09-22",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",6,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"How do I determine whether my construction site must comply with the SPCC rule?","Question",{"text":109,"@type":110},"Add all oil storage containers that can hold 55 gallons or more (even if empty). If total capacity exceeds 1,320 gallons and there is a reasonable expectation of discharge into or upon navigable waters of the United States or adjoining shorelines, SPCC compliance applies.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What does the SPCC rule require in a comprehensive SPCC plan?",{"text":114,"@type":110},"A comprehensive SPCC plan must detail how the owner/contractor will store oil and control and clean up spills, including secondary containment and/or diversionary structures, security measures, inspections and recordkeeping, employee training, and certain reporting requirements.",{"name":116,"@type":107,"acceptedAnswer":117},"What do EPA inspectors look for during inspections?",{"text":118,"@type":110},"Inspectors look for sheens on water/ground/pavement, oil storage containers lacking appropriate secondary containment, improperly sized secondary containment, missing alarm systems to notify personnel, missing records, and failure to train personnel.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},353140,1791082606,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":40,"category_name":41,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":136,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":61,"update_tm":141,"read_time":142},2336464648322,"https://ap-avatar.wpscdn.com/avatar/2200025388227c56fec?_k=1778556882303663488","Spill Prevention, Control &  \nCountermeasure  \nThe Bottom Line  \nFrequently Asked Questions  \nEPA’s SPCC Plan Template  \nContractor Case Study  \nIf you have oil on your jobsite, or at your asphalt plant, be aware of the compliance requirements in the U.S. Environmental Protection Agency’s (EPA) oil spill planning rule. The federal Spill Prevention Control and Countermeasure (SPCC) program may apply to the owner and operator of any construction site that has the capacity to store more than 1,320 gallons of any typeof oil product in above ground storage tanks or containers.  \nThis fact sheet is intended to help AGC members determine if they need a federally-required oil spill plan—and, if they do, develop one that meets the EPA requirements.  \nThe Bottom Line  \nThe SPCC rule applies in all 50 states and is administered and enforced by federal EPA in every state; however, states and localities also may have supplemental oil programs. This rule is in addition to any oil spill requirements required by your stormwater pollution prevention plan.  \nRight now, EPA’s SPCC rule covers your jobsite if (1) your above ground oil storage containers (in tanks of 55 gallons * or greater, including asphalt cement tanks) have a total capacity of more than 1,320 gallons and (2) a spill could reach navigable waters of the United States or adjoining shorelines. It is important to note that EPA revised the definition of “navigable waters” of the United States, as the term applies to the SPCC rule, to comply with a court decision.  \nThe rule requires all regulated jobsites to have a comprehensive SPCC plan detailing how the owner/contractor will store oil and both control and clean up any spills that may occur on the jobsite. Basic requirements call for appropriate secondary containment and/or diversionary structures, security measures, inspections and record keeping and employee training. EPA rules also impose certain reporting requirements.  \nOnce you have an SPCC plan in place it is critical to conduct site inspections, personnel training and periodic review and renewal of the plan. Severe penalties have been assessed against companies who had SPCC plans in place but failed to conduct proper training and implementation of the plan. If an inspector determines that site personnel do not know how to respond to a spill, you could face penalties, regardless of whether there has been a spill incident.  \nInspectors are looking for sheens on water, the ground, or pavement, oil storage containers without secondary containment or with improperly sized secondary containment, lack of alarm systems to notify personnel of spills, missing records and failure to train personnel.  \nAGC has been working with EPA for many years to provide the Agency with practical advice and counsel on how to streamline the oil spill rules to minimize the implementation problems common to construction sites.  EPA finalized amendments to the SPCC rules in 2006 and 2008 that will ease the compliance burden on construction companies covered by the federal oil spill control regulations. The amendments respond to many of AGC’s main concerns as well as AGC’s recommendations on how to improve the SPCC program. EPA set  \na November 10, 2011, compliance deadline for regulated construction sites to prepare and implement SPCC plans that meet all of the current requirements.  \n* All gallons referenced are U.S. gallons.  \nNoteworthy rule revisions provide regulatory relief for “low-risk sites” that store smaller quantities of oil, including the ability to develop “self-certified” SPCC plans (in lieu of one certified by a professional engineer) and use EPA’s SPCC plan template to comply with the SPCC rule. In addition, EPA exempted hot-mix asphalt (HMA) and HMA containers from SPCC rule applicability in their December 2008 amendments, thereby excluding silos of HMA from the total oil storage capacity for any job site. Per AGC’s recommendations, this exemption is warranted because an HMA discharge","cbCait9vlypuTa2o","https://ap.wps.com/l/cbCait9vlypuTa2o","pdf",830808,22,"English","# The Bottom Line\n## Applicability and enforcement\n## SPCC plan requirements\n## Enforcement and penalties\n## Noteworthy revisions\n# Frequently Asked Questions\n## Does my construction site need to comply with the SPCC rule?","[{\"question\":\"How do I determine whether my construction site must comply with the SPCC rule?\",\"answer\":\"Add all oil storage containers that can hold 55 gallons or more (even if empty). If total capacity exceeds 1,320 gallons and there is a reasonable expectation of discharge into or upon navigable waters of the United States or adjoining shorelines, SPCC compliance applies.\"},{\"question\":\"What does the SPCC rule require in a comprehensive SPCC plan?\",\"answer\":\"A comprehensive SPCC plan must detail how the owner/contractor will store oil and control and clean up spills, including secondary containment and/or diversionary structures, security measures, inspections and recordkeeping, employee training, and certain reporting requirements.\"},{\"question\":\"What do EPA inspectors look for during inspections?\",\"answer\":\"Inspectors look for sheens on water/ground/pavement, oil storage containers lacking appropriate secondary containment, improperly sized secondary containment, missing alarm systems to notify personnel, missing records, and failure to train personnel.\"}]","SPCC Plan Template - Spill Prevention, Control and Countermeasure | PDF",1790103273,8]