[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-353139-105":53,"doc-detail-353139-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","spcc-plan-spill-prevention-control-and-countermeasures-plan","SPCC Plan - Spill Prevention, Control and Countermeasures Plan","","Spill Prevention, Control and Countermeasures (SPCC) Plan for the Washington State Department of Transportation SR 105 project covering the Graveyard Spit Dynamic Revetment and Dune Restoration. The plan defines contractor responsibilities, active personnel contacts, spill reporting procedures, and required notification steps to federal, state, local, and project-specific parties. It also sets conditions for plan updates, implementation timing, staff training, and response measures, including an appendix with an example spill or incident report form.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":41,"@type":70,"position":76},"https://docshare.wps.com/template/letters/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/spcc-plan-spill-prevention-control-and-countermeasures-plan/353139/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/spcc-plan-spill-prevention-control-and-countermeasures-plan/353139.png","ImageObject",442,249,{"name":88,"@type":89},"Noah","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-14","2026-09-22",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",8,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"Who is responsible for implementing and updating the SPCC Plan?","Question",{"text":109,"@type":110},"The plan identifies active personnel and their contact information, including Nick Rognlin as the primary contact and Nick Ancich as the secondary contact for implementing and updating the SPCC Plan.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What must happen immediately in the event of a spill?",{"text":114,"@type":110},"The contractor must immediately notify the Project Engineer, notify the Project Inspector, and notify the Federal, State, and Local agencies listed in the project-specific notification figure.",{"name":116,"@type":107,"acceptedAnswer":117},"When can on-site construction activities begin under this SPCC Plan?",{"text":118,"@type":110},"No on-site project construction activities may commence until the Project Engineer reviews and accepts the project-specific SPCC Plan.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},353139,1791018344,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":40,"category_name":41,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":35,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":141},8796095462418,"https://ap-avatar.wpscdn.com/avatar/80000253c1241d02b47?x-image-process=image/resize,m_fixed,w_180,h_180&k=1778826106357471780","Spill Prevention, Control and Countermeasures Plan (SPCC)  \nWashington State Department of Transportation SR 105 / Graveyard Spit Dynamic Revetment and Dune Restoration  \nProject No.: XE3623  \nPrepared by  \nNick Rognlin, Vice President: Rognlin’s, Inc.  \nNick Rognlin, Project Manager: Rognlin’s, Inc.  \nNick Ancich, Superintendent: Rognlin’s, Inc.  \n321 W. State St.  \nAberdeen, WA 98520  \n(360)532-5220  \nJuly 11, 2025  \nImportant: The contractor shall maintain a complete and updated copy of this plan in an accessible location for the duration of the project or must have the ability to electronically access this when on the project site at all times.  \nProject Engineer (PE): Pedro Reyes  \nPhone: (360)442-1346  \nProject Inspector: Chris MacLean  \nPhone: (360)442-1352  \nProject Inspector: Tom Cuff  \nPhone: (360)442-1356  \nTable of Contents  \nSPCC Plan Implementation Requirements ....................................................................................... 3  \nSPCC Plan Elements ......................................................................................................................... 3  \n1. Responsible Personnel ................................................................................................................ 3  \n2. Spill Reporting ............................................................................................................................ 4  \n3. Project and Site Information (With Site Map) ............................................................................ 5  \n4. Potential Spill Sources ................................................................................................................ 7  \n5. Pre-Existing Contamination ........................................................................................................ 8  \n6. Spill Prevention and Response Training ..................................................................................... 8  \n7. Spill Prevention ........................................................................................................................... 8  \n8. Spill Response ........................................................................................................................... 10  \n9. Plan Approval ........................................................................................................................... 13  \n10. SPCC Plan Acknowledgement (Signed by ALL Project Personnel) ........................................ 14  \nAPPENDIX A: EXAMPLE SPILL OR INCIDENT REPORT FORM ......................................... 15  \nSPCC Plan Implementation Requirements  \nWSDOT Standard Speciﬁcation 1-07.15(1) and Project-speciﬁc special provisions (if applicable) require a Spill Prevention, Control and Countermeasures Plan (SPCC Plan or Plan) to be developed for each project. The SPCC Plan purpose is to protect human health and the environment from spills and releases of “hazardous materials,” a generic term WSDOT uses to mean dangerous waste, problem waste, petroleum products, and hazardous substances. The SPCC Plan also address conditions that may be required by Section 3406 of the current International Fire Code, or as approved by the local Fire Marshal.  \nThe Contractor (Rognlin’s, Inc.) for the SR 105 / Graveyard Spit Dynamic Revetment and Dune Restoration Project No. XE3623 (Project), has developed this SPCC Plan to satisfy WSDOT Standard Speciﬁcation 1-07.15(1) for the Project. All Subcontractors need to ensure they accept this plan or ensure provisions in their spill plan complement and are consistent with the provisions in the Contractor’s approved SPCC.  \nThe Contractor shall update this SPCC Plan throughout the Project to reﬂect actual site conditions and practices. The Contractor shall fully implement this SPCC Plan, as accepted and updated, at all times.  \nNote: No on-site Project construction activities may commence until the Project Engineer reviews and accepts this Project-Speciﬁc S","cbCaincjhYFFYH6p","https://ap.wps.com/l/cbCaincjhYFFYH6p","pdf",916312,"English","# SPCC Plan Implementation Requirements\n## SPCC Plan Elements\n## 1. Responsible Personnel\n## 2. Spill Reporting\n## 3. Project and Site Information (With Site Map)\n## 4. Potential Spill Sources\n## 5. Pre-Existing Contamination\n## 6. Spill Prevention and Response Training\n## 7. Spill Prevention\n## 8. Spill Response\n## 9. Plan Approval\n## 10. SPCC Plan Acknowledgement (Signed by ALL Project Personnel)\n# APPENDIX A: Example SPILL OR INCIDENT REPORT FORM","[{\"question\":\"Who is responsible for implementing and updating the SPCC Plan?\",\"answer\":\"The plan identifies active personnel and their contact information, including Nick Rognlin as the primary contact and Nick Ancich as the secondary contact for implementing and updating the SPCC Plan.\"},{\"question\":\"What must happen immediately in the event of a spill?\",\"answer\":\"The contractor must immediately notify the Project Engineer, notify the Project Inspector, and notify the Federal, State, and Local agencies listed in the project-specific notification figure.\"},{\"question\":\"When can on-site construction activities begin under this SPCC Plan?\",\"answer\":\"No on-site project construction activities may commence until the Project Engineer reviews and accepts the project-specific SPCC Plan.\"}]","SPCC Plan - Spill Prevention, Control and Countermeasures Plan | PDF",1790103272,6]