[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-161479-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-161479-en":126},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","solar-equipment-lease-and-services-agreement-template","SOLAR EQUIPMENT LEASE AND SERVICES AGREEMENT - Template","","Solar Equipment Lease and Services Agreement defines the contractual relationship between a Solar Owner and a Homeowner for the design, engineering, construction, installation, operation, and maintenance of a solar facility on the premises. It sets governing order of terms between the cover sheet and general conditions, outlines permitted use and access rights, establishes commencement and “COD” timing, clarifies lease year calculation, specifies decommissioning obligations and timelines, and describes lease payment structure and licensing during the lease term.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/forms/","Forms",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/solar-equipment-lease-and-services-agreement-template/161479/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/solar-equipment-lease-and-services-agreement-template/161479.png","ImageObject",442,249,{"name":42,"@type":43},"Evangeline","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-09-23","2026-08-30",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",5,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What happens if the cover sheet conflicts with the general terms and conditions?","Question",{"text":63,"@type":64},"The terms on the cover sheet/signature page control over the general terms and conditions.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"When does the lease term begin under the agreement?",{"text":68,"@type":64},"The term begins on the commercial operation date (COD), which is the date the solar facility is placed in service on or after utility approval to interconnect.",{"name":70,"@type":61,"acceptedAnswer":71},"How is decommissioning handled at the end of the lease?",{"text":72,"@type":64},"Solar Owner must decommission and remove the solar facility within 90 days at its sole cost unless termination is due to a Homeowner Event of Default; otherwise, Homeowner is responsible for costs.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},161479,1788100741,{"code":4,"msg":82,"data":83},"success",[84,89,94,99,104,109,113,118,122],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":86,"show_sort_weight":87,"slug":88},11,"Presentations",90,"presentations",{"id":90,"doc_module":22,"doc_module_name":25,"category_name":91,"show_sort_weight":92,"slug":93},12,"Resumes",80,"resumes",{"id":95,"doc_module":22,"doc_module_name":25,"category_name":96,"show_sort_weight":97,"slug":98},14,"Invoices",70,"invoices",{"id":100,"doc_module":22,"doc_module_name":25,"category_name":101,"show_sort_weight":102,"slug":103},15,"Posters",60,"posters",{"id":105,"doc_module":22,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},16,"Social Media",50,"social-media",{"id":110,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":111,"slug":112},17,40,"forms",{"id":114,"doc_module":22,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},18,"Letters",30,"letters",{"id":119,"doc_module":22,"doc_module_name":25,"category_name":120,"show_sort_weight":55,"slug":121},21,"Paper Templates","papers-templates",{"id":123,"doc_module":22,"doc_module_name":25,"category_name":124,"show_sort_weight":4,"slug":125},158,"General","general-158",{"code":4,"msg":82,"data":127},{"doc_id":79,"user_id":128,"nickname":42,"user_avatar":129,"doc_module":22,"category_id":110,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":135,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":80,"read_time":55},13056703019662,"https://ap-avatar.wpscdn.com/avatar/be000253a8e92610077?_k=1778726343310543188","SOLAR EQUIPMENT LEASE AND SERVICES AGREEMENT\nEffective Date:  _________________\nThis Solar Equipment Lease and Services Agreement (this “Lease”) is effective as of the Effective Date listed above, by and between Solar Owner and Homeowner identified below (each, a “Party” and together, the “Parties”) and comprises these Cover Sheet and Signature Page, and the following Exhibits, incorporated herein and made a part hereof:\nExhibit A:\tGeneral Terms and Conditions\nExhibit B:\tProperty, Premises, and Site Plan\nExhibit C:\tForm of Memorandum of Site Lease\nExhibit D:\tWarranty Terms\nIn the event of any conflict between the terms specified on this Cover Sheet/Signature Page (the “Cover Sheet”) and the General Terms and Conditions, the terms specified on this Cover Sheet/Signature Page shall control.\n[Signature Page Follows]\nIN WITNESS WHEREOF, the Parties hereto have executed this Solar Equipment Lease and Services Agreement as of the Effective Date.\nSolar Owner:\nSOLAR OWNER NAME\nBy:\t____________________________\nName:\tJOHN DOE\u000bTitle:\tDIRECTOR, NON PROFIT\nHomeowner #1:\nBy:\t____________________________\nName:    ____________________________\nHomeowner #2 (if needed):\nBy:\t____________________________\nName:    ____________________________\nINSTRUCTIONS: All homeowners on the property title must sign, as well as the spouses of all married homeowners, even if such spouses are not listed on the property title.\u000f\nExhibit A\nGENERAL TERMS AND CONDITIONS\nCommercial Terms and Definitions.  The Commercial Terms listed on the Cover Sheet of this Lease are hereby incorporated in these General Terms and Conditions by this reference.  Capitalized terms used but not otherwise defined in these General Terms and Conditions are as defined on the Cover Sheet of this Lease.\nLease of Solar Facility.  Solar Owner hereby agrees to design, engineer, construct, install, operate, and maintain a Solar Facility at the Premises, and upon achieving the COD (as such term is defined below), to lease such Solar Facility to Homeowner, and Homeowner agrees to lease from Solar Owner the Solar Facility pursuant and subject to the terms and conditions of this Lease for the duration of the Term.\nLease of Premises.   Homeowner hereby leases to Solar Owner, and Solar Owner hereby leases from Homeowner, the Premises pursuant to the terms and conditions of this Lease solely for the design, engineering, construction, installation, operation, and maintenance of the Solar Facility (the “Permitted Use”), subject to the rights of termination set forth in Section 12.  Homeowner retains the right to inspect the Premises and to use the Premises and the Property for all purposes that do not interfere with Solar Owner’s Permitted Use.\nTerm.\nDuration.  This Lease shall commence on the Effective Date and, unless sooner terminated as provided herein, will continue until the end of the Term set forth on the Cover Sheet.  The Term shall begin on the commercial operation date (“COD”) of the Solar Facility. As such term is used herein, COD is the date on which when the Solar Facility is placed in service, which shall be on or after the day that Solar Owner has received approval from the Utility to interconnect with the grid (as applicable).  A “Lease Year” is each 12-month period beginning with the first day of the month following COD, unless COD occurs on the first day of a month, in which case the Lease Year shall be deemed to start on such date and not on the first day of the following month.\nDecommissioning. Upon the expiration or termination of the Lease, Solar Owner shall decommission and remove the Solar Facility within ninety (90) days at its sole cost and expense, unless such expiration or termination is due to an Event of Default by Homeowner, in which case Homeowner shall be responsible for all costs and expenses.  Solar Owner shall make commercially reasonable efforts to effect the removal of the Solar Facility in a way which returns the Premises to substantially its pre-existing state, prov","cbCaijflzh8jo7FO","https://ap.wps.com/l/cbCaijflzh8jo7FO","docx",56498,13,"English","# Solar Equipment Lease and Services Agreement\n## Exhibits and order of control\n## Definitions and lease structure\n## Permitted use, premises and access\n## Term, COD, and lease year\n## Decommissioning and removal obligations","[{\"question\":\"What happens if the cover sheet conflicts with the general terms and conditions?\",\"answer\":\"The terms on the cover sheet/signature page control over the general terms and conditions.\"},{\"question\":\"When does the lease term begin under the agreement?\",\"answer\":\"The term begins on the commercial operation date (COD), which is the date the solar facility is placed in service on or after utility approval to interconnect.\"},{\"question\":\"How is decommissioning handled at the end of the lease?\",\"answer\":\"Solar Owner must decommission and remove the solar facility within 90 days at its sole cost unless termination is due to a Homeowner Event of Default; otherwise, Homeowner is responsible for costs.\"}]","SOLAR EQUIPMENT LEASE AND SERVICES AGREEMENT - Template | DOCX"]