[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-239976-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-239976-en":126},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","small-wireless-facility-construction-plan-review-checklist-development-services-department-engineering-division","Small Wireless Facility Construction Plan Review Checklist - Development Services Department - Engineering Division","","Small Wireless Facility Construction Plan Review Checklist provides structured submission requirements for Wireless communication installations, covering the Master Use and Occupancy Agreement (MUOA/MUOP), the Master Structural Plan (MSP), and the Small Wireless Facility Right of Way construction plan. It specifies conditional actions for executed versus non-executed agreements, required supporting documents, required review disciplines, and early submittal items to avoid multiple review cycles. It also outlines site allowances for street lights and traffic signals, connection conditions to electric service lines, ROW review responsibilities, and first-package form requirements.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/forms/","Forms",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/small-wireless-facility-construction-plan-review-checklist-development-services-department-engineering-division/239976/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/small-wireless-facility-construction-plan-review-checklist-development-services-department-engineering-division/239976.png","ImageObject",442,249,{"name":42,"@type":43},"Finn","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-29","2026-09-11",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",12,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What should be submitted if the MUOA/P is not executed?","Question",{"text":63,"@type":64},"Submit a draft of MUOA, an approved Master Structural Plan (MSP), the Small Cell Attachment & Right of Way Permit Application, SDG&E electric service map with the proposed site shown, and the point-of-connection location for unmetered service or an Electrical Service Analysis (ESA).","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Which review disciplines review MSP applications?",{"text":68,"@type":64},"Engineering Building Review, Structural review, WCF-Telecom Review, Traffic Safety Review, and Geology Review are listed as the disciplines that review MSP applications.",{"name":70,"@type":61,"acceptedAnswer":71},"What requirements apply to SC-WCF connection to an existing City electric service line?",{"text":72,"@type":64},"No other SC-WCF may be connected to the electric service line, the SC-WCF power consumption must be less than 5 amps, and the electric service line total power consumption must be 15 amps or less.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},239976,1790031838,{"code":4,"msg":82,"data":83},"success",[84,89,93,98,103,108,112,117,122],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":86,"show_sort_weight":87,"slug":88},11,"Presentations",90,"presentations",{"id":55,"doc_module":22,"doc_module_name":25,"category_name":90,"show_sort_weight":91,"slug":92},"Resumes",80,"resumes",{"id":94,"doc_module":22,"doc_module_name":25,"category_name":95,"show_sort_weight":96,"slug":97},14,"Invoices",70,"invoices",{"id":99,"doc_module":22,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},15,"Posters",60,"posters",{"id":104,"doc_module":22,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},16,"Social Media",50,"social-media",{"id":109,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":110,"slug":111},17,40,"forms",{"id":113,"doc_module":22,"doc_module_name":25,"category_name":114,"show_sort_weight":115,"slug":116},18,"Letters",30,"letters",{"id":118,"doc_module":22,"doc_module_name":25,"category_name":119,"show_sort_weight":120,"slug":121},21,"Paper Templates",5,"papers-templates",{"id":123,"doc_module":22,"doc_module_name":25,"category_name":124,"show_sort_weight":4,"slug":125},158,"General","general-158",{"code":4,"msg":82,"data":127},{"doc_id":79,"user_id":128,"nickname":42,"user_avatar":129,"doc_module":22,"category_id":109,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":85,"language":135,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":12,"update_tm":139,"read_time":33},34359740700684,"https://ap-avatar.wpscdn.com/avatar/1f400023980c374ae676?_k=1777273430885731487","Small Wireless Facility Construction Plan Review Checklist  \nDevelopment Services Department  \nEngineering Division  \nA.  Master Use and Occupancy Agreement (MUOA)– Previously known as a Master Use and Occupancy Permit (MUOP):  \nY N  \n  Is the MUOA/P executed?  \n1.1 If YES, provide an executed copy of the MUOA/P.  \n1.2 If NO, submit the following items for an MUOA review:  \n1.2.1. Draft of MUOA  \n1.2.2. Approved Master Structural Plan (MSP)  \n1.2.3. Small Cell Attachment & Right of Way Permit Application  \n1.2.4. SDG&E electric service map with electric service shown to proposed site.  \n1.2.5. Location for point of connection for unmetered service for proposed site or Electrical Service Analysis (ESA) for direct connection to City power source.  \nB.  Master Structural Plan (MSP):  \nY N  \n1.  \nIs the MSP approved?  \n1.1 If YES, provide a copy of the approved MSP.  \n1.2 If NO, submit the following items for an MSP review:  \n1.1.1. Signed copy of the MUOA  \n1.1.2. MSP Application  \n1.3 The following review disciplines will review the MSP applications:  \n• Engineering Building Review  \n• Structural review  \n• WCF-Telecom Review  \n• Traffic Safety Review  \n• Geology Review  \n1.4 The following items are required at the first submittal package. Failure to do so will result in multiple review cycles and may delay approval of the MSP.  \n1.4.1. General Application, Form DS-3032  \n1.4.2. Structural Calculations stamped and signed by a licensed Engineer in the State of California. (Calculations may be consolidated onto the plan and may not be a separate document) .  \n1.4.3. Radio Frequency-Electromagnetic Energy (RF-EME) Compliance Report; one per MUOA.  \n1.4.4. Color Photo Simulation for each configuration/pole type.  \n1.4.5. Four sets of plans shall be prepared in accordance with the following requirements:  \n• 11” x 17” minimum sized plans  \n• Kill Switch must be identified on the pole.  \n• Structures within the Coastal Height Limit Overlay Zone and in Residential zones shall not exceed 30-feet.  \n• Each pole type requires a separate detail sheet.  \n• Each configuration requires a separate detail sheet.  \n• The following are sample attachments that shall be identified on the MSP:  \n􀀹 Banners  \n􀀹 Top Antenna Mount  \n􀀹 Side Antenna Mount  \n􀀹 Signs  \nC. Small Wireless Facility Right of Way Permit (construction plan):  \n1. Small Cell-Wireless Communication Facilities (SC-WCFs): Installation and Trenching for SC-WCFs shall be submitted at the same time except when the installation of the SC-WCF does not require trenching.  \n*Phone appointments (619) 446-5000 are required for all SC-WCF submittals. An email will be provided to the applicant to submit the proposed list of nodes (for the first initial submittal) in the format provided here:  \n[https://www.sandiego.gov/sites/default/fi](https://www.sandiego.gov/sites/default/fi)les/dsd-small-cell-submittal-list.xlsx  \nwhich must include the required JOIN ID number. This will allow staff to actively set up these projects in advance to minimize wait time. Staff will still be required to perform limited intake but the overall intake process will be streamlined. Staff will be unable to intake any revised/and or additional nodes not included in the original email. The invoice issued on the date of the submittal must be paid before any review can be done.  \n2.  SC-WCF Sites:  \n Existing Street Light, one (1) SC-WCF allowed per light.  \nFor Existing Concrete Street Light, the applicant will be required to remove and replace the Concrete Street Light to a fabricated steel pole with a concrete texture. For standard steel street light detail (without concrete texture), please refer to CALTRANS 2010 Standard Plan ES-6A, type 15.  \n Existing Traffic Signal: one (1) SC-WCF allowed per light.  \nFor Existing Street Light and Traffic Signal:  \n Verify the number of devices indicated on the SDG&E electric service map to proposed site and the total existing power consumption in amps.  \n2.1 If a connection to an ","cbCaiooBJYewI2pY","https://ap.wps.com/l/cbCaiooBJYewI2pY","pdf",444678,"English","# MUOA/P - Master Use and Occupancy Agreement\n## Executed vs. non-executed requirements\n# MSP - Master Structural Plan\n## Approval status and review disciplines\n# Small Wireless Facility Right of Way Permit (construction plan)\n## SC-WCF installation and trenching submission timing\n## SC-WCF site rules for street lights and traffic signals\n## Electric service line connection conditions\n# First submittal package - required forms and items","[{\"question\":\"What should be submitted if the MUOA/P is not executed?\",\"answer\":\"Submit a draft of MUOA, an approved Master Structural Plan (MSP), the Small Cell Attachment \\u0026 Right of Way Permit Application, SDG\\u0026E electric service map with the proposed site shown, and the point-of-connection location for unmetered service or an Electrical Service Analysis (ESA).\"},{\"question\":\"Which review disciplines review MSP applications?\",\"answer\":\"Engineering Building Review, Structural review, WCF-Telecom Review, Traffic Safety Review, and Geology Review are listed as the disciplines that review MSP applications.\"},{\"question\":\"What requirements apply to SC-WCF connection to an existing City electric service line?\",\"answer\":\"No other SC-WCF may be connected to the electric service line, the SC-WCF power consumption must be less than 5 amps, and the electric service line total power consumption must be 15 amps or less.\"}]","Small Wireless Facility Construction Plan Review Checklist - Development Services Department - Engineering Division | PDF",1789155718]