[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-244617-105":53,"doc-detail-244617-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","site-plan-engineering-cover-sheet-notes-conditions-approval-signatures","Site Plan Engineering Cover Sheet - Notes, Conditions, Approval Signatures","","Engineering site plan submittal cover sheet for King County land development approvals, capturing minimum required planning, drainage, grading, and temporary erosion control information. Includes guidance for engineers on completing blanks, allowable plan details, datum/benchmark recording, and optional additional cover pages without conflicting indexing. Provides sections for site approval status, pro rata share assessment analysis, agreements and permit references, reviewer sign-off and construction approval, contractor notice requirements, project contact information, and bonding/license fields.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/site-plan-engineering-cover-sheet-notes-conditions-approval-signatures/244617/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/site-plan-engineering-cover-sheet-notes-conditions-approval-signatures/244617.png","ImageObject",442,249,{"name":88,"@type":89},"Eden","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-23","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",9,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What information is required on the engineering site plan cover sheet?","Question",{"text":109,"@type":110},"The cover sheet specifies minimum required information for engineering plan submittals per the referenced Surface Water Design Manual section, and directs the consultant to fill designated blank spaces strictly according to the provided format.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"How is pro rata share assessment handled on this form?",{"text":114,"@type":110},"It records whether a pro rata share assessment is required or not required based on site drainage shed conditions, development impacts on storm water runoff, and related peak runoff and peak volume assessment rate amounts for specified storm conditions.",{"name":116,"@type":107,"acceptedAnswer":117},"Under what conditions can site plan approval be voided?",{"text":118,"@type":110},"Site plan approval becomes void if the commercial building permit is not obtained or renewed within two years of approval, and subdivision plan approval is void if the final plat is not recorded before the preliminary plat approval expiration.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},244617,1791345076,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":4},1374391974468,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","| NOTES/CONDITIONS/DETAILS:\u003Cbr>Note to Engineer: This cover sheet contains the minimum required information for engineering plan submittals as outlined in the Surface Water Design Manual , Section 2.3.2.2(3) . It is required that the format and information contained on this sheet be strictly adhered to and the consultant shall fill in blank spaces provided except where indicated. The blank area on this half of the sheet may be used for:\u003Cbr>a. Legal Description,\u003Cbr>b. Copy of Examiner's specific condition (s) which apply to site improvements\u003Cbr>c. Index or table of contents if more than 3 sheets ,\u003Cbr>d. Other plan details or notes as space allows ,\u003Cbr>e. Datum and/or Benchmark.\u003Cbr>Consultants may elect to add another cover page but in that case , that page should not have a page number and should not include the page index or other pertinent information that is part of the project design.\u003Cbr>Note to Engineer: This approval signature block is not required for cover page. |  |  | Vicinity Map Scale 1 \"= | Site Plan Approval\u003Cbr>Approval of these plans is for construction of road and drainage improvements , site drainage & grading and temporary erosion control in unincorporated King County only. These plans do not authorize any other utility approval or improvements proposed in any State right of way.\u003Cbr>Site plan approval is void if the commercial building permit has not been obtained or renewed within two years of approval.\u003Cbr>Subdivision plan approval is void if the final plat is not recorded prior to the preliminary plat approval expiration. | Des ign Architect/ Engineer/ Supervisor\u003Cbr>\u003Cbr>P roject Coo rd inator Phone |\n| --- | --- | --- | --- | --- | --- |\n|  |  |  |  | PRO RATA SHARE ASSESSMENT ANALYSIS\u003Cbr>(County Use Only)\u003Cbr>Section Township Range Tax Parcel Number\u003Cbr>\u003Cbr>Site Location is within the   drainage shed (s)\u003Cbr>Pro Rata Share Assessment(s) are: 􀂅 Required 􀂅 Not Required from the site due to development for increased storm water runoff.\u003Cbr>Peak Runoff Assessment Rate($   ) per cfs increases (10 year , 2 hour storm)\u003Cbr>Peak Volume Assessment Rate($   ) per Ac. Ft. increases (10 year ,\u003Cbr>2 hour storm) |  |\n|  |  |  |  | AGREEMENTS , PLAN REFERENCES , PERMITS ETC.\u003Cbr>(To be completed by consultant)\u003Cbr>Preliminary Plat Approval/Permit Issued Date:  \u003Cbr>Expiration Date:  \u003Cbr>Other Related Permit Numbers Received:\u003Cbr>Right-of-Way Use Permit  \u003Cbr>Grading  \u003Cbr>Building/Structural  \u003Cbr>Other    \u003Cbr>Board feet of tree removal on site:  \u003Cbr>Cubic yards of material hauled on/off the site:  \u003Cbr>Is this a highly sensitive area site? (Yes/No): ~~ ~~\u003Cbr>Note: If \"yes\" , per SWDM Appendix D44 a Highly Sensitive Site Erosion Control Supervisor is required. See ESC plan. | P roject T itle/ Name |\n|  |  |  | Soils Map Scale 1 \"=\u003Cbr>Date\u003Cbr>Date\u003Cbr>Date |  |  |\n|  |  |  |  | Emergency\u003Cbr>911\u003Cbr>Police-Fire-Rescue |  |\n|  |  |  |  | RECOMMENDED FOR APPROVAL\u003Cbr>(To be completed by King County)\u003Cbr>Date Date\u003Cbr>Date\u003Cbr>Date Date\u003Cbr>Date\u003Cbr>Review Engineer Senior Engineer Traffic & Planning Engineer Sensitive Areas Structural Review Engineer\u003Cbr>Other |  |\n|  |  |  | Notice Required\u003Cbr>Contractors shall notify operators who maintain underground utility lines in the area of proposed excavation or blasting at least two business days , but not more than ten working days prior to commencement of excavation or demolition in accordance with RCW Title 19. Names and telephone numbers of the operators of underground utility lines in this project appear below. These numbers shall also be used to serve in an emergency conditions as required.\u003Cbr>Sanitary Sewer Water District Gas Company\u003Cbr>Power Company\u003Cbr>Phone Phone Phone\u003Cbr>Phone\u003Cbr>Call Before You Dig 811 or 10800-424-5555 |  |  |\n|  |  |  |  | APPROVED FOR CONSTRUCTION Department of Local Services , Permitting Division\u003Cbr>Date Development Engineer | Perm it Number :  \u003Cbr>Related Perm it Numbers :   |\n|  |  |  | Notes\u003Cbr>1. The Developer is required to notify the Department of Local Services , Per","cbCaijbtGCjODUOB","https://ap.wps.com/l/cbCaijbtGCjODUOB","pdf",404186,"English","# Notes/Conditions/Details\n# Site Plan Approval\n## Pro Rata Share Assessment Analysis\n## Agreements, Plan References, Permits\n# Recommended for Approval\n## Notice Required and Emergency Contacts\n# Approved for Construction\n## Project Contact Information\n# Bonding Information\n# License/Seal","[{\"question\":\"What information is required on the engineering site plan cover sheet?\",\"answer\":\"The cover sheet specifies minimum required information for engineering plan submittals per the referenced Surface Water Design Manual section, and directs the consultant to fill designated blank spaces strictly according to the provided format.\"},{\"question\":\"How is pro rata share assessment handled on this form?\",\"answer\":\"It records whether a pro rata share assessment is required or not required based on site drainage shed conditions, development impacts on storm water runoff, and related peak runoff and peak volume assessment rate amounts for specified storm conditions.\"},{\"question\":\"Under what conditions can site plan approval be voided?\",\"answer\":\"Site plan approval becomes void if the commercial building permit is not obtained or renewed within two years of approval, and subdivision plan approval is void if the final plat is not recorded before the preliminary plat approval expiration.\"}]","Site Plan Engineering Cover Sheet - Notes, Conditions, Approval Signatures | PDF",1789219795]