[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-243644-105":53,"doc-detail-243644-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","site-inspection-request-rfi-form-templates","Site Inspection Request (RFI) - Form Templates","","Site inspection request (RFI) form package covering inspection workflow, approvals, revisions, and submission tracking for construction projects. Includes sections for project identifiers, location, RFI number, revision and dates in/out, PMC remarks, and inspection results with coded acceptance statuses (accepted, revise & submit, not accepted, not ready). Adds contractor and PMC sign-off lines, plus related transmittal, variation order, site handover notice, and material/document submittal forms.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/site-inspection-request-rfi-form-templates/243644/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/site-inspection-request-rfi-form-templates/243644.png","ImageObject",442,249,{"name":88,"@type":89},"Xiajie","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-20","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":8},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What information does the REQUEST FOR INSPECTION (RFI) form require?","Question",{"text":108,"@type":109},"It requests project identifiers (project number), subject work description, location, RFI number, revision, and dates in/out, along with an approved drawing reference.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"How are inspection outcomes recorded on the form?",{"text":113,"@type":109},"Inspection results are coded with statuses such as A (work accepted), B (revise & submit), C (not accepted), and D (not ready), including date and signature fields.",{"name":115,"@type":106,"acceptedAnswer":116},"What does the contractor confirm when submitting for inspection?",{"text":117,"@type":109},"The contractor confirms the works are completed and ready for inspection and that the work complies with the specifications, drawings, and consultant instructions, with name, position, signature, and date.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},243644,1791361381,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":8,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":42,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":8},8814010472675,"https://avatar.qwps.com/avatar/WGlhamll","REQUEST FOR INSPECTION (RFI)  \n\n| Project : Project No. |  |  |\n| --- | --- | --- |\n| SUBJECT WORK REQUESTED FOR INSPECTION | LOCATION | RFI No. |\n|  |  |  |\n|  |  | REVISION |\n|  |  |  |\n|  |  | DATE IN |\n|  |  |  |\n|  |  | DATE OUT |\n| Approved Drawing Ref. |  |  |\n\n\n| PMC REMARKS |\n| --- |\n|  |\n|  |\n|  |\n|  |\n\n\n| INSPECTION RESULTS |  |  |  |\n| --- | --- | --- | --- |\n| Code | Status | Date | Signature |\n| A 􀂆 | Work is accepted |  |  |\n| B 􀂆 | Revise & Submit: Work may be accepted subject to incorporation of changes indicated. |  |  |\n| C 􀂆 | Work not accepted. Rework, adjust, and, resubmit. |  |  |\n| D 􀂆 | Not ready. Resubmit when ready. |  |  |\n\n\n| CONTRACTOR |\n| --- |\n| This review does not relieve the contractor of his\u003Cbr>Responsibility under the terms & Conditions of the contract nor Authorized additional compensation with respect to time & cost.\u003Cbr>We hereby submit/ resubmit for inspection of above subject works and confirm herewith that above works are completed and ready for inspection as stated above all in\u003Cbr>accordance with the specification, drawings, and consultant instruction.\u003Cbr>Contractor to complete the information below.\u003Cbr>Name:  \u003Cbr>Position:  \u003Cbr>Signature  \u003Cbr>Date: |\n\n\n| PMC |\n| --- |\n| Above subject works have been visually inspected by\u003Cbr>the Consultant and found acceptable/ Not acceptable as per the code given above.\u003Cbr>Name:  \u003Cbr>Position:  \u003Cbr>Signature:  \u003Cbr>Date: |\n\nTRANSMITTAL  \n\n| No |  |\n| --- | --- |\n| Office | Date: |\n\nProject Name/No/Description  \nTo/Address  \nAttention  \n\n| We are sending via |\n| --- |\n| The items detailed below\u003Cbr>Item No Description Date |\n| Purpose of transmittal |\n| Remarks |\n\nIf the enclosures received are not listed above, please notify APD at once, at the office indicated above. Please sign and return the duplicate copy of this form and retain the original for your records.  \n\n| Issued by (Name) | Signature | Date |\n| --- | --- | --- |\n| Received by (Name) | Signature | Date |\n\nJob file Copy to  \nVARIATION ORDER  \nInitiated by:  Owner  PMC  Contractor  Others  \n\n| Project \\#  \u003Cbr>Variation Order Number :  \u003Cbr>Job NO:  \u003Cbr>You are directed to make the following changes in this contract: | Project Name:  \u003Cbr>Contract Ref :  \u003Cbr>Contract Date :   |\n| --- | --- |\n\n\n|  |\n| --- |\n|  |\n|  |\n\nThe original Contract Price was Net change by previous Variation Orders Contract Price prior to this Variation was  \nSR  \nSR  \nSR  \nThe Contract Price will be (increased) (decreased) (Unchanged) by this Variation Order  \nThe new Contract price including this Variation Order will be   SR  \nThe Contract Time will be (increased) (decreased) by ( ) days  \nPMC Contractor Owner  \nAddress:   Address:   Address:    \nSignature:   Signature:   Signature:    \nName: Name: Name:  \nDate:   Date:   Date:    \nNOTICE OF COMMENCEMENT AND SITE HANDOVER  \n\n| Date : Time : |  |  |  |\n| --- | --- | --- | --- |\n| 1.\u003Cbr>2.\u003Cbr>3.\u003Cbr>4.\u003Cbr>5\u003Cbr>5.\u003Cbr>6.\u003Cbr>7. | Project Ref\u003Cbr>Project Title\u003Cbr>Site Location\u003Cbr>Client\u003Cbr>PMC\u003Cbr>Name of the Contractor Address of the Contractor\u003Cbr>Official Date Counted As Day One For | :\u003Cbr>:\u003Cbr>:\u003Cbr>:\u003Cbr>:\u003Cbr>:\u003Cbr>:\u003Cbr> |  |\n| 8. | Contract Period\u003Cbr>Period of Contract | : |  |\n| The aforementioned representatives have inspected the project site, and the contractor hereby certifies that he has received the site free from any obstacles. Moreover, the consultant has handed over the contractor fixed point, benchmark, and the border of the project shown in the drawings\u003Cbr>It is considered that   2009 is the date of the Project Site Handing Over to the Contractor. |  |  |  |\n| Comments on Handover |  |  |  |\n\n\n| SITE HANDED OVER BY:(THE CLIENT)\u003Cbr>Name:  Title:  Signature:  | SITE RECEIVED BY:\u003Cbr>(THE CONTRACTOR)\u003Cbr>Name:  Title:  Signature:  | SITE WITNESSED BY:(THE PMC)\u003Cbr>Name:  Title:  Signature:  |\n| --- | --- | --- |\n\nMATERIAL SUBMITTAL FORM  \nTrade : Arch Civil Mech Elect Landscape Others  \nProject \\# :  ALFANAR HEAD OFFICE & WAREHOUSE EXPANSION   \nSUBJECT:    \n\n| Specs. Code","cbCaigh6Ookdsi52","https://ap.wps.com/l/cbCaigh6Ookdsi52","pdf",2288352,"English","# REQUEST FOR INSPECTION (RFI)\n## Inspection Results\n# CONTRACTOR\n## PMC REMARKS\n# TRANSMITTAL\n## Enclosures and Signatures\n# VARIATION ORDER\n## Contract Price and Time Changes\n# NOTICE OF COMMENCEMENT AND SITE HANDOVER\n# MATERIAL SUBMITTAL FORM\n# DOCUMENTS SUBMITTAL FORM","[{\"question\":\"What information does the REQUEST FOR INSPECTION (RFI) form require?\",\"answer\":\"It requests project identifiers (project number), subject work description, location, RFI number, revision, and dates in/out, along with an approved drawing reference.\"},{\"question\":\"How are inspection outcomes recorded on the form?\",\"answer\":\"Inspection results are coded with statuses such as A (work accepted), B (revise \\u0026 submit), C (not accepted), and D (not ready), including date and signature fields.\"},{\"question\":\"What does the contractor confirm when submitting for inspection?\",\"answer\":\"The contractor confirms the works are completed and ready for inspection and that the work complies with the specifications, drawings, and consultant instructions, with name, position, signature, and date.\"}]","Site Inspection Request (RFI) - Form Templates | PDF",1789206719]