[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-167933-en":3,"doc-seo-167933-105":30,"detail-sidebar-cat-1-en-105":90},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":11,"category_id":12,"category_name":13,"doc_title":14,"doc_description":15,"doc_content":16,"file_id":17,"file_url":18,"file_type":19,"file_size":20,"view_count":4,"is_deleted":4,"is_public":11,"is_downloadable":11,"audit_status":11,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":15,"update_tm":28,"read_time":29},167933,8796095461564,"Liam","https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d",1,18,"Letters","Shannon Foynes Port Marine Notice 03 of 2024 - Water-Based Events Safety Plan Template","Marine Notice for Shannon Foynes Port reminds members of the public, boat clubs, and local community groups that water-based events affecting commercial shipping movements require prior consultation with Shannon Foynes Port Company and the Marine Operations Department. The notice sets a minimum 4-week lead time, explains potential suspension of planned shipping moves for safety, and outlines when a Safety Plan must be submitted to the Harbour Master. Annex A provides an event and applicant checklist, communications plan, safety measures, emergency actions, and requested SFPC resources.","sHANNON eSTUARY\nplanning of water based events\nMembers of the Public, Boat Clubs and Local Community Groups are reminded of the necessity and requirement to ensure that there is prior consultation with Shannon Foynes Port Company and the Marine Operations Department well in advance of organizing any water- based activities or events that impact on commercial shipping movements.\nMarine Operations can be contacted at \u0013 HYPERLINK \"mailto:marineops@sfpc.ie\" \u0014marineops@sfpc.ie\u0015 and 069 73103.\nThis is a requirement to ensure the safety of all participants and to ensure that safety of navigation of commercial vessels is not compromised.  In some circumstances, the Port may take the decision to suspend planned shipping moves to safely facilitate the planned event(s).\nFor any event that impacts on planned shipping moves a minimum of 4-weeks notice is required.\nDepending on the nature of the event a Safety Plan may need to be developed and forwarded to the Harbour Master for his attention and comment.  The Safety Plan should include details around the following;\nPrimary POC and contact details.\nDate/Location/Timings of event.\nComms Plan.\nSafety Boat(s) incl agreed means of communications.\nWeather parameters.\nAccess required (if any) to SFPC facilities.\nActions in the event of an emergency.\nAn outline template is attached at Annex A to this Notice.\nOrganisers are advised to make contact with Marine Operations in as timely a manner as possible.  This will determine whether a Safety Plan is required and the likely impact on Port Users.\nAttention is also brought to the Department of Transport, Tourism and Sport code of Safe Practice for The Safe Operation of Recreational Craft. This identifies the safe operation of recreational craft and is intended to be used by owners, operators and users of recreational craft. Copies of this are available at Shannon Foynes Port Offices in Foynes, Co. Limerick.\nMichael Kennelly\nHarbour Master\nShannon Foynes Port Company\n01st January 2024\nAnnex A – Safety Plan template\nEVENT DETAILS\nEVENT NAME:\nORGANISATION:\nAPPLICANT DETAILS\nNAME OF APPLICANT:\nPHONE NO:\nE-MAIL ADDRESS:\nEVENT INFORMATION\nPLANNED DATE:\nLOCATION:\nEXPECTED NUMBERS:\nPERSON IN CHARGE\nNAME:\nQUALS:\nPHONE NO:\nCOMMUNICATIONS PLAN (Outline means of comms during event and to External Agencies)\nPLANNED SAFETY MEASURES (incl Safety Boat / support Agencies etc)\nACTIONS IN THE EVENT OF AN EMERGENCY\nSFPC RESOURCES REQUESTED (e.g. if Activity/Event taking place within TRD etc)","cbCaih3LIxp3he0c","https://ap.wps.com/l/cbCaih3LIxp3he0c","docx",25131,4,"English","en",105,"# Water-based events consultation requirement\n## Contact and safety rationale\n## Lead time and potential suspension of shipping moves\n## When a Safety Plan is required\n## Safety Plan contents and submission\n# Annex A - Safety Plan template\n## Event details and applicant information\n## Event information\n## Communications plan and planned safety measures\n## Actions in emergencies\n## SFPC resources requested","[{\"question\":\"Who must consult Shannon Foynes Port Company before organizing a water-based event?\",\"answer\":\"Members of the public, boat clubs, and local community groups must ensure prior consultation with Shannon Foynes Port Company and the Marine Operations Department well in advance.\"},{\"question\":\"How much notice is required for an event that impacts planned shipping moves?\",\"answer\":\"A minimum of 4 weeks’ notice is required for any event that impacts planned shipping moves.\"},{\"question\":\"What must be included in the Safety Plan sent to the Harbour Master?\",\"answer\":\"The Safety Plan should include primary point of contact details, event date/location/timings, a communications plan, safety boat(s) and agreed communications means, weather parameters, access required to SFPC facilities (if any), and actions in the event of an emergency.\"}]","Shannon Foynes Port Marine Notice 03 of 2024 - Water-Based Events Safety Plan Template | DOCX",1788222096,2,{"code":4,"msg":31,"data":32},"ok",{"site_id":24,"language":23,"slug":33,"title":14,"keywords":34,"description":15,"schema_data":35,"social_meta":85,"head_meta":87,"extra_data":89,"updated_unix":28},"shannon-foynes-port-marine-notice-03-of-2024-water-based-events-safety-plan-template","",{"@graph":36,"@context":84},[37,52,67],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,47,50],{"item":41,"name":42,"@type":43,"position":11},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":29},"https://docshare.wps.com/template/","Template",{"item":48,"name":13,"@type":43,"position":49},"https://docshare.wps.com/template/letters/",3,{"item":51,"name":14,"@type":43,"position":21},"https://docshare.wps.com/template/shannon-foynes-port-marine-notice-03-of-2024-water-based-events-safety-plan-template/167933/",{"url":51,"name":14,"@type":53,"author":54,"headline":14,"publisher":56,"fileFormat":59,"inLanguage":23,"description":15,"dateModified":60,"datePublished":61,"encodingFormat":59,"isAccessibleForFree":62,"interactionStatistic":63},"DigitalDocument",{"name":9,"@type":55},"Person",{"url":41,"name":57,"@type":58},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-09-04","2026-09-01",true,{"@type":64,"interactionType":65,"userInteractionCount":49},"InteractionCounter",{"@type":66},"ViewAction",{"@type":68,"mainEntity":69},"FAQPage",[70,76,80],{"name":71,"@type":72,"acceptedAnswer":73},"Who must consult Shannon Foynes Port Company before organizing a water-based event?","Question",{"text":74,"@type":75},"Members of the public, boat clubs, and local community groups must ensure prior consultation with Shannon Foynes Port Company and the Marine Operations Department well in advance.","Answer",{"name":77,"@type":72,"acceptedAnswer":78},"How much notice is required for an event that impacts planned shipping moves?",{"text":79,"@type":75},"A minimum of 4 weeks’ notice is required for any event that impacts planned shipping moves.",{"name":81,"@type":72,"acceptedAnswer":82},"What must be included in the Safety Plan sent to the Harbour Master?",{"text":83,"@type":75},"The Safety Plan should include primary point of contact details, event date/location/timings, a communications plan, safety boat(s) and agreed communications means, weather parameters, access required to SFPC facilities (if any), and actions in the event of an emergency.","https://schema.org",{"og:url":51,"og:type":86,"og:title":14,"og:site_name":57,"og:description":15},"article",{"robots":88,"canonical":51},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":91},[92,97,102,107,112,117,122,125,130],{"id":93,"doc_module":11,"doc_module_name":46,"category_name":94,"show_sort_weight":95,"slug":96},11,"Presentations",90,"presentations",{"id":98,"doc_module":11,"doc_module_name":46,"category_name":99,"show_sort_weight":100,"slug":101},12,"Resumes",80,"resumes",{"id":103,"doc_module":11,"doc_module_name":46,"category_name":104,"show_sort_weight":105,"slug":106},14,"Invoices",70,"invoices",{"id":108,"doc_module":11,"doc_module_name":46,"category_name":109,"show_sort_weight":110,"slug":111},15,"Posters",60,"posters",{"id":113,"doc_module":11,"doc_module_name":46,"category_name":114,"show_sort_weight":115,"slug":116},16,"Social Media",50,"social-media",{"id":118,"doc_module":11,"doc_module_name":46,"category_name":119,"show_sort_weight":120,"slug":121},17,"Forms",40,"forms",{"id":12,"doc_module":11,"doc_module_name":46,"category_name":13,"show_sort_weight":123,"slug":124},30,"letters",{"id":126,"doc_module":11,"doc_module_name":46,"category_name":127,"show_sort_weight":128,"slug":129},21,"Paper Templates",5,"papers-templates",{"id":131,"doc_module":11,"doc_module_name":46,"category_name":132,"show_sort_weight":4,"slug":133},158,"General","general-158"]