[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-242155-105":53,"doc-detail-242155-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","service-report-100187-service-work-and-terms","SERVICE REPORT - 100187 - Service Work and Terms","","Service Report #100187 documents an emergency call where RTU 11 was not delivering cold air. The technician opened the unit, identified compressor one as non-operational while compressor two operated, verified supply voltage and contactor load-side readings, and found contact points pitted and charred. After bypassing and restoring power, the compressor operated, but the unit behavior indicated repeated failures, leading to disabling compressor one contactor and wiring condenser fan motors to contactor two. The report states the unit is currently operational with one compressor and provides key visit resolutions, asset details, and terms, conditions, and limitations for non-agreement work.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":21,"@type":70,"position":76},"https://docshare.wps.com/template/invoices/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/service-report-100187-service-work-and-terms/242155/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/service-report-100187-service-work-and-terms/242155.png","ImageObject",442,249,{"name":88,"@type":89},"Bintang","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-07","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":47},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What problem was reported for RTU 11?","Question",{"text":108,"@type":109},"RTU 11 was not blowing cold air during an emergency call.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What did the technician find during the visit?",{"text":113,"@type":109},"Compressor one was not operational, and the compressor contactor contacts were pitted and charred.",{"name":115,"@type":106,"acceptedAnswer":116},"How was the issue resolved?",{"text":117,"@type":109},"The technician powered down the unit, checked and confirmed internal components, bypassed the contactor to restore operation, then disabled the failing compressor one contactor and wired the condenser fan motors to contactor two.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},242155,1790635056,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":20,"category_name":21,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":47,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":76,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":9},962085564381,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","SERVICE  \nREPORT\\# 100187  \n\n| Location Address\u003Cbr>City State Contact | ABC COMPANY\u003Cbr>2555 Industry Lane\u003Cbr>Norristown\u003Cbr>PA  Zip 19403\u003Cbr>James Miller | Service Order\u003Cbr>Service Date\u003Cbr>Customer \\#\u003Cbr>Customer PO\u003Cbr>Cust Phone Sales Rep | 40005026 01/08/20 1234-ABC\u003Cbr>NOT GIVEN | Agreement / Type Technician\u003Cbr>Skill Level Union\u003Cbr>Service Complete Visit Complete | Perventative Maintance John Smith\u003Cbr>N\u003Cbr>Y |\n| --- | --- | --- | --- | --- | --- |\n\nProblem Description: EM(EMERGENCY CALL) ***EMERGENCY CALL*** RTU 11 NOT BLOWING COLD AIR  \n\n| Visit Resolution: | OPENED UNIT AND FOUND COMPRESSOR ONE NOT OPERATIONAL. COMPRESSOR TWO IS OPERATIONAL. CHECKED SUPPLY VOLTAGE-OK. CHECKED LOAD SIDE OF CONTACTOR AND VOLTAGE IS PRESENT. CHECKED CONTACTS AND FOUND THEM PITTED AND CHARRED. POWERED DOWN UNIT AND OHM’D COMPRESSOR-OK. BY PASSED CONTACTOR AND RESTORED POWER. COMPRESSOR IS OPERATIONAL AND DRAWING 6 AMPS PER LEG. POWERED UNIT DOWN AND REWIRED TO CONTACTOR. RESTORED POWER AND COMPRESSOR WOULD DRAW 35 AMPS AND THEN ZERO. DISABLED COMPRESSOR CONTACTOR. DISABLED COMPRESSOR ONE. WIRED CONDENSER FAN MOTORS TO COMPRESSOR CONTACTOR TWO. UNIT IS CURRENTLY OPERATIONAL WITH ONE\u003Cbr>COMPRESSOR. NO MECHANICAL ABNORMALITIES WITH COMPRESSOR OR FAN MOTORS FOUND. LIKELY CAUSES FOR CONTACTOR FAILURES ARE INTERMITTENT AND MAY REQUIRE AN ELECTRICIAN AND HVAC TECH FOR FURTHER TROUBLESHOOTING. |\n| --- | --- |\n\nAllocation of charges is subject to change based on management review of the actual agreement coverage if applicable.  \n\n| L A B O R |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| Regular Hours\u003Cbr>Overtime Hours |  |  |  |  | Billable |  | Agreement Covered/Nonbillable |  |  |  |  |  |  |\n|  |  |  |  |  | 1.00\u003Cbr>3.00 |  | 0.00\u003Cbr>0.00 |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| A S S E T S . S E R V I C E D |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| Asset |  | Asset Type |  | Asset Description |  | Manufacturer |  | Model |  |  |  | Serial No. |  |\n| E11 |  | HVAC |  | A-000-130-508 |  | CARRIER |  | 50TC-D08A2A6A0A0A0 |  |  |  | 4017P30258 |  |\n| M A T E R I A L |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| B=Billable | Asset |  | Description |  |  |  |  |  | Quantity | PO |  |  | Source |\n| B | E11 |  | MISC MATERIALS |  |  |  |  |  | 1.0000 |  |  |  | VS |\n\nVisit Pictures  \nVisit Pictures  \n| Visit Approved\u003Cbr>By: | Signed By: JAMES SMITH\u003Cbr>Date: 01-08-2020 Time: 18:52 |\n| --- | --- |\n\nTERMS, CONDITIONS and LIMITATIONS  \nThe following Terms and Conditions apply only to NON-AGREEMENT WORK, authorization for which is given by the  \nCustomer's signature in the block on the face hereof. Work performed under Maintenance Agreements, Fixed-Price  \nAgreements and/or Time and Material Agreements shall be governed by the Terms and Conditions contained in the  \nagreement executed by the Contractor and Customer.  \nCustomer will provide reasonable means of access to the equipment and allow Contractor to start and stop the equipment as necessary to perform our required services.  \nCustomer agrees to pay for all services rendered and materials or parts supplied at the current rates and prices in effect at the time services are performed. Payment is due upon the receipt of invoice.  \nServices are being performed as required by the Customer and it is specifically understood that Contractor has not had a previous opportunity to inspect the totality of the system, the equipment, or the maintenance records and that the work must be done immediately.  \nContractor does not warrant the work performed against failures or against defects in the materials or workmanship provided. However, if any replacement part or item of equipment installed by the Contractor proves defective, the Contractor will extend to the Customer the benefits of any warranty the Contractor has received from the manufacturer; removal and reinstallation of any equipment or materials repaired or r","cbCaihCD6yBfDCn6","https://ap.wps.com/l/cbCaihCD6yBfDCn6","pdf",1971670,"English","# Service Details\n## Visit Resolution\n## Assets and Materials\n## Terms, Conditions and Limitations","[{\"question\":\"What problem was reported for RTU 11?\",\"answer\":\"RTU 11 was not blowing cold air during an emergency call.\"},{\"question\":\"What did the technician find during the visit?\",\"answer\":\"Compressor one was not operational, and the compressor contactor contacts were pitted and charred.\"},{\"question\":\"How was the issue resolved?\",\"answer\":\"The technician powered down the unit, checked and confirmed internal components, bypassed the contactor to restore operation, then disabled the failing compressor one contactor and wired the condenser fan motors to contactor two.\"}]","SERVICE REPORT - 100187 - Service Work and Terms | PDF",1789187187]