[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-177952-105":53,"doc-detail-177952-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","section-27-1000-structured-cabling","Section 27 1000 - Structured Cabling","","LANL主规格书第27 1000节（Structured Cabling）给出结构化布线系统的编制与选项激活说明，覆盖从接地与等电位、导管/线槽、内管、支撑与标识，到测试设备、机柜/机架、光纤与水平/园区骨干、水平布线与无线接入点、以及端接硬件等完整要求。文档强调按项目范围顺序启用条款、选择线缆类别（6A或5e/6A），并在需要时结合地震条款进行项目化编辑与替代/提交程序联动。",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/section-27-1000-structured-cabling/177952/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/section-27-1000-structured-cabling/177952.png","ImageObject",442,249,{"name":88,"@type":89},"Quinn Holloway","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-24","2026-09-02",true,{"@type":98,"interactionType":99,"userInteractionCount":15},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"该章节在Speclink中如何激活与启用？","Question",{"text":108,"@type":109},"通过开启Seq #0000，再依次激活PART 1中“SECTION INCLUDES”相关段落/条款；随后Section中其余条款会被联动激活，除非另有说明。","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"本章节需要为每个项目进行哪些编辑？",{"text":113,"@type":109},"必须编辑以加入项目专属要求，使用选择项/choice fields指示设计选择或由设计方填写的位置；同时删除该项目不包含的流程、项目或设计要求。",{"name":115,"@type":106,"acceptedAnswer":116},"在地震适用性方面如何处理？",{"text":117,"@type":109},"若本节覆盖内容不适用于抗震设计或按ASCE 7第13.1.4段豁免，则在项目化编辑前需参照26 0548.16（Seismic Controls for Electrical Systems）与01 8734（Seismic Qualification of Nonstructural Components）相关内容。","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},177952,1790217314,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":15,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":45},2336474466712,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","Section 27 1000 \u000bStructured Cabling\n************************************************************************************************************\nLANL MASTER SPECIFICATION SECTION\nNOTE TO SPECIFIER ON USAGE IN SPECLINK: Activate the Section by turning on Seq #0000, followed by activating paragraphs in PART 1, Article SECTION INCLUDES. This will activate related articles, paras/subparas in the rest of the Section (i.e., SECTION INCLUDES in PART 1 activates articles and paras/subparas in PARTS 2 and 3). If there are choice fields to edit the entire Section (typically in this first author note or beginning of the Section), make selections at those locations, which will filter through the remaining Section. All Articles, paragraphs and subparagraphs must be activated sequentially from top to bottom, unless noted otherwise.\nThis template must be edited for each project. In doing so, Specifier must add job-specific requirements. Selections and choice fields are used to indicate designer choices or locations where text must be supplied by the designer. The section must also be edited to remove requirements for processes, items, or designs that are not included in the project.\nTo seek a variance from applicable requirements, contact the Engineering Standards Manual (ESM) Communications \u0013 HYPERLINK \"https://coe.lanl.gov/standards/Lists/POCs/AllItems.aspx\" \\h \u0014POC\u0015  (LANL access only).  Please contact POC with suggestions for improvement as well.  LANL personnel should submit here: \u0013 HYPERLINK \"https://coe.lanl.gov/APs/_layouts/15/listform.aspx?PageType=8&ListId=%7b27814329-67BF-4CB6-AE52-403529FC5A67%7d&RootFolder=\" \\h \u0014Suggested Change or Request Clarification\u0015; Subcontractors via email to engstandards@lanl.gov.\nWhen assembling a specification package, include sections from all applicable Divisions, especially Division 1, General Requirements.\nSection is developed for ML-4 projects. For ML-1, 2, and 3 applications, additional requirements and independent reviews should be added if increased confidence in procurement or execution is desired; see \u0013 HYPERLINK \"https://engstandards.lanl.gov/ESM_Chapters.shtml\" \\l \"esm1\" \\h \u0014LANL ESM Chapter 1 - General\u0015, Section Z10 Specifications and Quality sections.\n==========================================================\nSeismic:  If the items covered by this Section are not subject to seismic design, or are exempt per ASCE 7 paragraph 13.1.4, then prior to editing this Section to be Project-specific, refer to Sections \u003C\u003C 26 0548.16 - Seismic Controls for Electrical Systems>> and \u003C\u003C 01 8734 - Seismic Qualification of Nonstructural Components (IBC)>>, as applicable.\nIMPORTANT NOTE: To tailor this Section quickly for cable/patch panel/faceplate category, after activating Sequence #0000, make a selection for the cable category below:\n- Select the Cable Category here: ​​​​​​​​​​​\u003C\u003C Category 6A (default); or  Category 5e and 6A>>​​​​​​​​​​​\n*************************************************************************************************************\nPART 1 - General\nSECTION INCLUDES\nThe Structured Cabling Systems (SCS) in this Section includes all required equipment and cabling to provide computer data and voice connectivity including:\n******************************************************************************\nThe following subparagraphs except the last one are designer-choices. Retain subparagraphs based on project-scope. Typically, cables require termination hardware.\n******************************************************************************\nGrounding and Bonding\nConduit\nInnerduct\nRaceway\nNon-Continuous Supports\nLabels and Labeling Software\nTesting Equipment\nTelecommunications Enclosures/Racks\nFiber Optic Enclosures\nData and Voice Patch Panels\nCable Supports and Management\nLadder Racks\nFiber Optic Building Backbone Cable\nFiber Optic Campus Backbone Cable\nHorizontal Cable\nWireless Access Points\nFiber Optic Termination Hardware\n************************************************************************","cbCaifMb6iQ77ewj","https://ap.wps.com/l/cbCaifMb6iQ77ewj","docx",918582,59,"English","# PART 1 - General\n## SECTION INCLUDES\n## RELATED REQUIREMENTS","[{\"question\":\"该章节在Speclink中如何激活与启用？\",\"answer\":\"通过开启Seq #0000，再依次激活PART 1中“SECTION INCLUDES”相关段落/条款；随后Section中其余条款会被联动激活，除非另有说明。\"},{\"question\":\"本章节需要为每个项目进行哪些编辑？\",\"answer\":\"必须编辑以加入项目专属要求，使用选择项/choice fields指示设计选择或由设计方填写的位置；同时删除该项目不包含的流程、项目或设计要求。\"},{\"question\":\"在地震适用性方面如何处理？\",\"answer\":\"若本节覆盖内容不适用于抗震设计或按ASCE 7第13.1.4段豁免，则在项目化编辑前需参照26 0548.16（Seismic Controls for Electrical Systems）与01 8734（Seismic Qualification of Nonstructural Components）相关内容。\"}]","Section 27 1000 - Structured Cabling | DOCX",1788329824]