[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-282503-105":53,"doc-detail-282503-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","scp-maintenance-agreement-recordation-instructions-mar-2025","SCP Maintenance Agreement Recordation Instructions - MAR 2025","","Recordation instructions for private development projects under the San Francisco Stormwater Management Requirements and Design Guidelines (SMR) supplement for a Maintenance Agreement. Projects creating or replacing 5,000+ square feet of impervious surface must sign and record a perpetual maintenance obligation before SFPUC approves the Final Stormwater Control Plan (SCP) and the DBI releases the Certificate of Final Completion (CFC). The guide details submission of one notarized signed agreement with Exhibits A-D, in-person recordation with no recording fee, and the process for SFPUC final approval letter after Conditions of Approval are satisfied.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":41,"@type":70,"position":76},"https://docshare.wps.com/template/letters/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/scp-maintenance-agreement-recordation-instructions-mar-2025/282503/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/scp-maintenance-agreement-recordation-instructions-mar-2025/282503.png","ImageObject",442,249,{"name":88,"@type":89},"Genevieve","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-20","2026-09-16",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",10,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"When must the Maintenance Agreement be signed and recorded?","Question",{"text":109,"@type":110},"Before SFPUC approval of the Final Stormwater Control Plan (SCP), and prior to the DBI releasing the Certificate of Final Completion (CFC).","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What must be included when submitting the Maintenance Agreement?",{"text":114,"@type":110},"Submit one original signed and notarized Maintenance Agreement with Exhibits A, B, C, and D, aligned to the approved Final SCP documents and comments resolved per the Condition of Approval.",{"name":116,"@type":107,"acceptedAnswer":117},"Where and how should the Maintenance Agreement be recorded?",{"text":118,"@type":110},"Record the original signed agreement at the San Francisco Office of the Assessor–Recorder. The original must be wet-signed and notarized and recorded in person; online recording is not available.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},282503,1790223619,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":40,"category_name":41,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":76,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":9},1374391974585,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102  \nT 415.554.3155 F 415.554.3161 TTY 415.554.3488  \nRE: SFPUC Stormwater Management Requirements and Design Guidelines Supplement-Maintenance Agreement  \nRecordation Instructions  \nThe San Francisco Public Utilities Commission’s (SFPUC) San Francisco Stormwater Management Requirements and Design Guidelines (SMR) require projects that create and/or replace 5,000 square feet or more of impervious surface to install stormwater management controls and maintain those controls in perpetuity. Every project subject to the SMR must sign and record a Maintenance Agreement to acknowledge and accept this maintenance responsibility. The Maintenance Agreement must be signed and recorded atthe San Francisco Office of the Assessor prior to SFPUC approval of the Final Stormwater Control Plan (SCP) . The San Francisco Department of Building Inspection (DBI) will not release the Certificate of Final Completion (CFC) for the project until the SFPUC approves the Final SCP.  \nThe Maintenance Agreement Template for privately funded development projects is available for download on [the SMR website at](the SMR website at www.sfpuc.gov/smr)[ ](the SMR website at www.sfpuc.gov/smr)[www.sfpuc.gov/smr](the SMR website at www.sfpuc.gov/smr). Alternate Maintenance Agreement Templates are available for projects with special circumstances, such as Federal or CCSF funded/owned projects.  \nPlease contact SFPUC for an alternate Maintenance Agreement.  \nUpon receipt of the Final SCP Conditions of Approval, follow the steps  \nbelow to complete the recordation process:  \nSTEP 1: Submit Maintenance Agreement  \nSubmit one (1) original signed and notarized Maintenance Agreement with Exhibits A, B, C, and D. Exhibits must reflect the approved documents in the Final SCP and include resolution of any outstanding comments per the Condition of Approval. Clearly label each Exhibit or include a labeled divider page prior to each Exhibit.  \n• Exhibit A: Property Legal Description or Assessor’s Block Map with metesand bounds  \n• Exhibit B: Stormwater Management Plan(s) with typical BMP section details (8 .5” x 11” format, only)  \n• Exhibit C: BMP Maintenance Schedule(s)  \n• Exhibit D: BMP Inspection Schedule (s)  \nSubmit to:  \nAttn: SFPUC SCP Project Reviewer  \nc/o Andrew Corrales  \nSFPUC, Wastewater Enterprise  \n525 Golden Gate Avenue, 6th Floor  \nSan Francisco, CA 94102  \nUpon receipt, the SFPUC will review to ensure the package is complete.  \n• If not complete, or Exhibits do not represent the approved documents, the SFPUC may return the package with comments.  \n• If complete, the SFPUC will sign and notarize the original Maintenance Agreement, this can take up to two weeks. The SFPUC will return the signed Maintenance Agreement to the Property Owner for recordation.  \nSTEP 2: Record Maintenance Agreement  \nThe Property Owner must record the original signed Maintenance Agreement, signed by the Property Owner and the SFPUC, at the San Francisco Office of the Assessor. The Maintenance Agreement must be recorded with Exhibits A, B, C, and D.  \nAssessor-Recorder’s Main Office:  \nSan Francisco Office of the Assessor–Recorder  \n1 Dr. Carlton B. Goodlett Place, City Hall, Room 190  \nSan Francisco, CA 94102  \nSubmittal: Record one (1) original (8 .5”x11”), wet-signed and notarized Maintenance Agreement in person at the Office of the Assessor – Recorder. Online recording is not available.  \nFee: There is no recording fee for the original copy. However. the Property Owner may request a copy of the recorded documents at the time of recordation for a nominal fee.  \nFollowing recordation, the Office of the Assessor-Recorder will send the original document to the SFPUC.  \nSTEP 3: SFPUC Approves the Final SCP  \nUpon SFPUC receipt of the original Maintenance Agreement package, and after the SFPUC has confirmed that all Conditions of Approval have been met, the SFPUC will provide a letter of Final SCP Approval to the Property Owner ","cbCaijnqjfIABfiI","https://ap.wps.com/l/cbCaijnqjfIABfiI","pdf",176460,"English","# Recordation Instructions\n## When a Maintenance Agreement is required\n## Step 1: Submit Maintenance Agreement\n## Step 2: Record Maintenance Agreement\n## Step 3: SFPUC Approves the Final SCP","[{\"question\":\"When must the Maintenance Agreement be signed and recorded?\",\"answer\":\"Before SFPUC approval of the Final Stormwater Control Plan (SCP), and prior to the DBI releasing the Certificate of Final Completion (CFC).\"},{\"question\":\"What must be included when submitting the Maintenance Agreement?\",\"answer\":\"Submit one original signed and notarized Maintenance Agreement with Exhibits A, B, C, and D, aligned to the approved Final SCP documents and comments resolved per the Condition of Approval.\"},{\"question\":\"Where and how should the Maintenance Agreement be recorded?\",\"answer\":\"Record the original signed agreement at the San Francisco Office of the Assessor–Recorder. The original must be wet-signed and notarized and recorded in person; online recording is not available.\"}]","SCP Maintenance Agreement Recordation Instructions - MAR 2025 | PDF",1789576214]