[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-236584-105":3,"doc-detail-236584-en":73,"detail-sidebar-cat-1-en-105":88},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":66,"head_meta":68,"extra_data":70,"updated_unix":72},105,"en","scope-of-work-template-project-development-program","Scope of Work Template - Project Development Program","","Project Development Scope of Work template for a consultant supporting a COMPASS FY20XX Project Development Program. Defines required consultant deliverables including a pre-concept report and supporting materials, with structured tasks for team coordination, monthly progress reporting, invoice submission, project concept development, environmental scanning, public involvement planning, cost estimating, and project team meetings. Specifies report components, formatting order, draft versions (1-3), Idaho Transportation Department forms, and a final submission deadline, plus COMPASS and member responsibilities.",{"@graph":14,"@context":65},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/forms/","Forms",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/scope-of-work-template-project-development-program/236584/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/scope-of-work-template-project-development-program/236584.png","ImageObject",442,249,{"name":42,"@type":43},"Ophelia","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-22","2026-09-11",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",17,{"@type":57,"mainEntity":58},"FAQPage",[59],{"name":60,"@type":61,"acceptedAnswer":62},"What is expected for project team coordination and meeting outputs?","Question",{"text":63,"@type":64},"The consultant identifies additional agency stakeholders, coordinates up to three team meetings, prepares agendas and visual displays of alternatives, leads discussions, and summarizes meetings including decisions, assignments, and next steps.","Answer","https://schema.org",{"og:url":32,"og:type":67,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":69,"canonical":32},"index,follow",{"doc_id":71,"site_id":7},236584,1790147908,{"code":4,"msg":74,"data":75},"success",{"doc_id":71,"user_id":76,"nickname":42,"user_avatar":77,"doc_module":22,"category_id":55,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":78,"file_id":79,"file_url":80,"file_type":81,"file_size":82,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":33,"language":83,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":84,"faqs":85,"seo_title":86,"seo_description":12,"update_tm":87,"read_time":26},7971461741311,"https://ap-avatar.wpscdn.com/avatar/74000253aff267980c6?x-image-process=image/resize,m_fixed,w_180,h_180&k=1779345379180704826","(Project Title)  \nProject Development Scope of Work –(Date)  \nProject Description  \nThis (member) project was selected to participate in the COMPASS FY20XX Project Development Program. The consultant will produce a pre-concept report for (project description and location) . The intent of the project is to (insert) .  \nTask 1: Project Team Coordination  \n1.1 Identify additional agency stakeholders to add to the Project Team as the project progresses  \n1.2 Coordinate with COMPASS to conduct Project Team meetings (this task assumes up to three project coordination meetings)  \n1.2.1 Kickoff meeting (COMPASS to arrange)  \n1.2.2 Review the alternatives identified in Task 3.4 with the Project Team  \n1.2.3 Review the Initial and Revised Draft Pre-Concept Reports with the Project Team  \nTask 2: Project Supervision  \n2.1 Provide detailed monthly progress reports (this task assumes up to seven monthly progress reports]  \n2.1.1 Summary of period’s activities  \n2.1.2 Tasks completed  \n2.1.3 Status of tasks not yet completed  \n2.1.4 Any issues with Task Order budget or schedule  \n2.2 Submit invoices to COMPASS (supported by 2.1)  \n2.2.1 Itemized staff time by task  \nTask 3: Project Concept Development & Draft Report Information  \nTasks 3 through 6 must be included in the Pre-Concept Report specified in Task 8. The Pre-Concept Report must follow the format specified below, and the items in the report must appear in the report in the order listed. This task includes the work necessary to develop each element of the Pre-Concept Report.  \n3.1 Prepare Project Summary  \n3.1.1 One-page description that includes purpose and need, goals, cost, and schedule; this summary will be at the beginning of the Pre-Concept Report  \n3.1.2 Brief one-paragraph summary to be used in the Transportation Improvement Program  \n3.2 Complete a Project Description  \n3.2.1 Statement of why Project Development was needed for this project  \n3.2.2 Statement of the Scope of Work completed by the consultant  \n3.2.3 Assumptions  \n3.2.4 Existing conditions in the project area Land Use  \nSafety/Crash History  \nTraffic  \nBike/Ped  \nTransit  \nUtilities and Irrigation  \n3.2.5 Regional/network connections  \n3.2.6 Comprehensive purpose and need description for grant narrative Benefits expected  \nEvidence problem exists  \nApplicable strategic goals and performance measures re: Communities in Motion 2040  \nConsistency with existing plans and documents  \n3.3 Identify and Evaluate Project Constraints  \n3.3.1 (Specific to Project)  \n3.4 Define and Recommend Alternatives  \n3.4.1 Description/configuration of alternatives considered  \n3.4.2 Analysis and preferred alternative selection Description of selection process Justification for preferred alternative(s)  \n3.4.3 Description and details of preferred alternative(s) Configuration details  \nSafety improvements  \nBicycle/pedestrian features  \n3.5 Assess Right-of-Way/Easements Needed  \n3.5.1 Detailed description for each location  \n3.5.2 Right-of-Way/Easement Needs Summary Table Location  \nArea (length & width)  \nParcels involved  \nEstimated costs  \nLand value  \nRelocations  \nPre-Concept Report must also include:  \n3.6 Environmental scan summary  \n3.7 Project stakeholders  \n3.8 Summary of public involvement plan to be used in the design phase  \n3.9 Project schedule and milestones, including future phases  \n3.10 Summary cost estimate(s) in federal dollars  \n3.11 Potential funding sources  \n3.12 Maps, sketches, and other images as appropriate throughout report  \nTask 4: Environmental Scan  \n4.1 Summary for Pre-Concept Report, as stated in 3.6  \n4.2 Append complete Environmental Scan to Pre-Concept Report  \nTask 5: Public Involvement Plan  \n5.1 Summary for Pre-Concept Report, as stated in 3.8  \n5.2 Append complete Public Involvement Plan to Pre-Concept Report  \nTask 6: Cost Estimates  \n6.1 Include project costs and ongoing operations and maintenance  \n6.2 Insert summary into Pre-Concept Report, as stated in 3.10  \n6.3 Append detailed Cost Estima","cbCait8J6eAy1bte","https://ap.wps.com/l/cbCait8J6eAy1bte","pdf",162376,"English","# Project Description\n# Task 1: Project Team Coordination\n# Task 2: Project Supervision\n# Task 3: Project Concept Development & Draft Report Information\n## Project Summary\n## Project Description\n## Project Constraints\n## Alternatives\n## Right-of-Way/Easements\n## Environmental Scan\n## Project Stakeholders\n## Public Involvement Plan\n## Schedule and Milestones\n## Cost Estimates and Funding\n## Maps and Images\n# Task 4: Environmental Scan\n# Task 5: Public Involvement Plan\n# Task 6: Cost Estimates\n# Task 7: Team Meetings\n# Task 8: Pre-Concept Report\n## Draft Versions (1-3)\n# Responsibilities: COMPASS and Member","[{\"question\":\"What is expected for project team coordination and meeting outputs?\",\"answer\":\"The consultant identifies additional agency stakeholders, coordinates up to three team meetings, prepares agendas and visual displays of alternatives, leads discussions, and summarizes meetings including decisions, assignments, and next steps.\"}]","Scope of Work Template - Project Development Program | PDF",1789106285,{"code":4,"msg":74,"data":89},[90,95,100,105,110,115,118,123,128],{"id":91,"doc_module":22,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},11,"Presentations",90,"presentations",{"id":96,"doc_module":22,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},12,"Resumes",80,"resumes",{"id":101,"doc_module":22,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},14,"Invoices",70,"invoices",{"id":106,"doc_module":22,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},15,"Posters",60,"posters",{"id":111,"doc_module":22,"doc_module_name":25,"category_name":112,"show_sort_weight":113,"slug":114},16,"Social Media",50,"social-media",{"id":55,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":116,"slug":117},40,"forms",{"id":119,"doc_module":22,"doc_module_name":25,"category_name":120,"show_sort_weight":121,"slug":122},18,"Letters",30,"letters",{"id":124,"doc_module":22,"doc_module_name":25,"category_name":125,"show_sort_weight":126,"slug":127},21,"Paper Templates",5,"papers-templates",{"id":129,"doc_module":22,"doc_module_name":25,"category_name":130,"show_sort_weight":4,"slug":131},158,"General","general-158"]