[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-244948-105":53,"doc-detail-244948-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","scope-of-work-sample-instructions","Scope of Work - Sample & Instructions","","Scope of Work sample and instructions for grant applications, defining mandatory and conditional tasks, deliverables, and scheduling requirements. It outlines administrative and reporting activities (kick-off, quarterly progress reports, final report), plus capital acquisition and data collection/analysis once vehicles or infrastructure are operational for at least six months. The template includes tables for technical task lists, key personnel and partners, and a glossary of terms and acronyms. It also sets grant agreement goals for emission reductions and performance transparency.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/scope-of-work-sample-instructions/244948/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/scope-of-work-sample-instructions/244948.png","ImageObject",442,249,{"name":88,"@type":89},"wps_ap_test_251126_0180","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-23","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":8},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What tasks are required for every grant application in this template?","Question",{"text":108,"@type":109},"The template requires Task 1.1 Attend Kick-off Meeting, Task 1.2 Final Meeting, Task 1.3 Quarterly Progress Reports, and Task 1.4 Final Report.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"Which tasks are only required for certain project types?",{"text":113,"@type":109},"The template states that identifying and obtaining matching funds (Task 1.5), obtaining required permits (Task 1.6), and obtaining and executing subcontracts (Task 1.7) are only required for certain project types.",{"name":115,"@type":106,"acceptedAnswer":116},"When does Task 3 Data Collection and Analysis start and when can the final report be submitted?",{"text":117,"@type":109},"Task 3 begins once the vehicle and/or infrastructure is in operation and requires a minimum of six months of service before the final report can be submitted.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},244948,1789223369,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":8,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":125,"read_time":76},8796095027276,"https://avatar.qwps.com/avatar/d3BzX2FwX3Rlc3RfMjUxMTI2XzAxODA=","Sample & Instructions  \nAttached is the sample Scope of Work template. Every application is required to include the following tasks:  \nTask 1.1 Attend Kick-off Meeting Task 1.2 Final Meeting  \nTask 1.3 Quarterly Progress Reports Task 1.4 Final Report  \nThe following tasks will only be required for certain project types and include:  \nTask 1.5 Identify and Obtain Matching Funds Task 1.6 Identify and Obtain Required Permits Task 1.7 Obtain and Execute Subcontracts Every application should also include Task 2 and 3.  \nTask 2 Capital Acquisition  \nTask 3 Data Collection and Analysis  \nTask 3-Data Collection and Analysis will begin once the vehicle and/or infrastructure is in operation and requires a minimum of six months of service before the final report can be submitted.  \nScope of Work –Sample & Instructions  \nTECHNICAL TASK LIST  \n\u003CInsert the Task numbers and Task names foryour Grant Agreements. >  \n\n| Task \\# | Task Name |\n| --- | --- |\n| 1 | Administration |\n| 2 | Capital Acquisition |\n| 3 | Data Reporting |\n\nKEY NAME LIST  \n\u003CInsert the Task numbers and the Key names for each Task in your Project. Include Key names only if the value of the project would significantly change without those personnel, subcontractors, or partners. Add additional lines as needed. Alternatively, you may delete this table if there are no key names. >  \n\n| Task \\# | Key Personnel | Key Subcontractor(s) | Key Partner(s) |\n| --- | --- | --- | --- |\n| 1 | \u003CName> | \u003CName> | \u003CName> |\n| 2 | \u003CName> | \u003CName> | \u003CName> |\n| 3 | \u003CName> | \u003CName> | \u003CName> |\n\nGLOSSARY  \nSpecific terms and acronyms used throughout this scope of work/work plan are defined as follows:  \n\n| Term/ Acronym | Definition |\n| --- | --- |\n\n\n| Project Participant | Project Participant means Recipient or Grantee of the grant. All three terms are used to mean the same thing. |\n| --- | --- |\n| SCAG | Southern California Association of Governments |\n| SCAQMD | South Coast Air Quality Management District |\n| MSRC | Mobile Source Reduction Review Committee |\n\nGoals of the Grant Agreements:  \nThe goals of the Program are as follows:  \n1. Achieve immediate emission reductions for NOx and PM2.5 from commercially deployed vehicles/equipment and facilitate supporting infrastructure.  \n2. Inform both industry and the public regarding ZE/NZE vehicle/equipment and supporting infrastructure performance, and how this information can be used to scale emission reductions to contribute to regional air quality goals.  \n3. Provide private operators and the public with information on return on investment (ROI) and cost-effectiveness insights into ZE/NZE vehicle/equipment and infrastructure operations, maintenance, and reliability.  \n4. Create greater transparency regarding the need for public versus private ZE/NZE supporting infrastructure; and  \n5. Inform the needs and/or help address the challenges to significantly scale ZE/NZE vehicles/ equipment and infrastructure in the region.  \n6. Achieve geographic funding diversity and ensure that the LFMP provides economic and environmental benefits across the entire region.  \nTASK 1 ADMINISTRATION  \nTask 1.1 Attend Kick-off Meeting  \nThe goal of this task is to establish the lines of communication and procedures for implementing the Grant Agreements. The SCAG project manager and Project Participant will to discuss terms of the agreement and provide clarification of any questions the Project Participant may have.  \nThe Project Participant shall:  \n• Attend a “Kick-Off” meeting with the SCAG. The Project Participant shall bring their Project Manager, Agreement Administrator, Accounting Officer, and any others determined necessary by the Project Participant or specifically requested by the SCAG to this meeting.  \n• Discuss the following administrative and technical aspects of the Grant Agreements:  \no Grant Agreements’ Terms and Conditions (MOU)  \no Match fund documentation (Task 1 .5) No reimbursable work may be done until this documentation is in place.  \no Permit docum","cbCaiqtsBhBhxWij","https://ap.wps.com/l/cbCaiqtsBhBhxWij","pdf",254364,7,"English","# Sample & Instructions\n## Technical Task List\n## Key Name List\n## Glossary\n## Goals of the Grant Agreements\n## Task 1 Administration\n## Task 2 Capital Acquisition\n## Task 3 Data Collection and Analysis","[{\"question\":\"What tasks are required for every grant application in this template?\",\"answer\":\"The template requires Task 1.1 Attend Kick-off Meeting, Task 1.2 Final Meeting, Task 1.3 Quarterly Progress Reports, and Task 1.4 Final Report.\"},{\"question\":\"Which tasks are only required for certain project types?\",\"answer\":\"The template states that identifying and obtaining matching funds (Task 1.5), obtaining required permits (Task 1.6), and obtaining and executing subcontracts (Task 1.7) are only required for certain project types.\"},{\"question\":\"When does Task 3 Data Collection and Analysis start and when can the final report be submitted?\",\"answer\":\"Task 3 begins once the vehicle and/or infrastructure is in operation and requires a minimum of six months of service before the final report can be submitted.\"}]","Scope of Work - Sample & Instructions | PDF"]