[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-243271-105":53,"doc-detail-243271-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","scope-of-work-change-order","SCOPE OF WORK CHANGE ORDER","","This document outlines a Scope of Work Change Order template, designed for managing modifications to existing projects. It facilitates the systematic recording of changes, including itemized alterations to work orders, modifications from the original scope, and adjustments to cost and schedule. The template provides clear sections for detailing the project name, location, contract number, and parties involved, such as the requesting party, project manager, contractor, owner, engineer, and funder. It includes fields for tracking original and final costs, as well as specifying the impact on payment terms and progress. Furthermore, it requires a detailed impact on the schedule, including a revised timeline. The change order must be recommended by the engineer, approved by the owner, and accepted by the contractor, with spaces for all relevant parties to provide their signatures and dates. This comprehensive form ensures all modifications are properly documented and approved, maintaining project integrity and contractual adherence.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/scope-of-work-change-order/243271/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/scope-of-work-change-order/243271.png","ImageObject",442,249,{"name":88,"@type":89},"Aladdin","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-11","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",8,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What information is required for a Scope of Work Change Order?","Question",{"text":109,"@type":110},"A Scope of Work Change Order requires details such as the project name, location, contract number, change order number, requesting party, date of request, project manager, contractor, owner, and engineer.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"How are changes to the work order itemized in this template?",{"text":114,"@type":110},"The template allows for itemized changes including whether to add, delete, or change the cost of a work order item, along with original and final costs.",{"name":116,"@type":107,"acceptedAnswer":117},"What impact should be considered when issuing a change order?",{"text":118,"@type":110},"The template requires consideration of the impact on payment terms and progress, as well as the impact on the schedule, including a revised timeline.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},243271,1790075466,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":4},2336478503145,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","SCOPE OF WORK CHANGE ORDER  \n| PROJECT NAME |  |  |  |\n| --- | --- | --- | --- |\n| LOCATION OF WORK |  |  |  |\n| CONTRACT NO. |  | CHANGE ORDER NO. |  |\n| REQUESTING PARTY |  | DATE OF REQUEST |  |\n| PROJECT MANAGER |  | CONTRACTOR |  |\n| OWNER |  | ENGINEER |  |\n\n\n| ITEMIZED CHANGES |  |  |  |  |\n| --- | --- | --- | --- | --- |\n| WORK ORDER ITEM | ADD / DELETE / CHANGE IN COST |  | ORIGINAL COST | FINAL COST |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  | TOTAL |  |  |\n\n\n| REMOVED FROM ORGINAL SOW |  |\n| --- | --- |\n| MODIFIED FROM ORIGINAL SOW |  |\n| PAYMENT TERMS AND IMPACT ON PAYMENT PROGRESS |  |\n| IMPACT TO SCHEDULE | Include revised timeline. |\n\n\n| RECOMMENDED BY\u003Cbr>ENGINEER |  | APPROVED BY\u003Cbr>OWNER |  |\n| --- | --- | --- | --- |\n| DATE |  | DATE |  |\n| ACCEPTED BY\u003Cbr>CONTRACTOR |  | REVIEWED BY\u003Cbr>FUNDER |  |\n| DATE |  | DATE |  |","cbCainA8FBdDX6yb","https://ap.wps.com/l/cbCainA8FBdDX6yb","pdf",65411,"English","# SCOPE OF WORK CHANGE ORDER\n## ITEMIZED CHANGES\n## REMOVED FROM ORGINAL SOW\n## MODIFIED FROM ORIGINAL SOW\n## PAYMENT TERMS AND IMPACT ON PAYMENT PROGRESS\n## IMPACT TO SCHEDULE\n## RECOMMENDED BY\u003Cbr>ENGINEER\n## APPROVED BY\u003Cbr>OWNER\n## ACCEPTED BY\u003Cbr>CONTRACTOR\n## REVIEWED BY\u003Cbr>FUNDER","[{\"question\":\"What information is required for a Scope of Work Change Order?\",\"answer\":\"A Scope of Work Change Order requires details such as the project name, location, contract number, change order number, requesting party, date of request, project manager, contractor, owner, and engineer.\"},{\"question\":\"How are changes to the work order itemized in this template?\",\"answer\":\"The template allows for itemized changes including whether to add, delete, or change the cost of a work order item, along with original and final costs.\"},{\"question\":\"What impact should be considered when issuing a change order?\",\"answer\":\"The template requires consideration of the impact on payment terms and progress, as well as the impact on the schedule, including a revised timeline.\"}]","SCOPE OF WORK CHANGE ORDER | PDF",1789202106]