[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-241477-105":53,"doc-detail-241477-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","schedule-user-guide-release-255-last-updated-24-june-2025","Schedule User Guide - Release 25.5 - Last Updated 24 June 2025","","Schedule User Guide for InEight Schedule Release 25.5 explains core functionality and workflow from overview and risk processing through user access, navigation, and interface components. It covers schedule views, roles and user setup, knowledge library resources, project creation and configuration, import/export, and advanced work packaging. The guide further details activity creation, productivity rate calculation, and resource management features including assignments, histogram tools, and S-curve, plus scheduling progress, snapshots, baselines, and key scheduling settings.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/schedule-user-guide-release-255-last-updated-24-june-2025/241477/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/schedule-user-guide-release-255-last-updated-24-june-2025/241477.png","ImageObject",442,249,{"name":88,"@type":89},"\tWilliam","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-14","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":20},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What does Lesson 1 cover in the Schedule User Guide?","Question",{"text":108,"@type":109},"It introduces the schedule overview and risk process, and explains key views such as Plan, Markup, Schedule Review, Cost Risk, Short Interval Planning, and the Risk Register.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"How are users and roles managed in Lesson 2?",{"text":113,"@type":109},"Lesson 2 describes schedule navigation, the main menu flow for opening schedules, user setup and roles, and steps for creating users and configuring contributor roles.",{"name":115,"@type":106,"acceptedAnswer":116},"What topics are included in resource management and scheduling?",{"text":117,"@type":109},"Resource management covers project resources, resource assignments, histogram tools (including comparison, S-curve, and over-allocation views), and histogram export/import. Scheduling covers scheduling progress attributes, percent complete handling, snapshot/scheduling settings, and baseline/snapshot workflows.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},241477,1791715987,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":20,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":141},5909887254083,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","SCHEDULE USER GUIDE  \nRelease 25.5 Last Updated: 24 June 2025  \nInformation in this document is subject to change without notice. Companies, names and data used in examples are fictitious.  \nCopyright ©2025 by InEight. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic or mechanical, for any purpose, without the express permission of InEight.  \nMicrosoft Windows, Internet Explorer and Microsoft Excel are registered trademarks of Microsoft Corporation.  \nAlthough InEight Schedule has undergone extensive testing, InEight makes no warranty or representation, either express or implied, with respect to this software or documentation, its quality, performance, merchantability, or fitness for purpose. As a result, this software and documentation are licensed “as is”, and you, the licensee are assuming the entire risk as to its quality and performance. In no event will InEight be liable for direct, indirect, special, incidental or consequential damages arising out of the use or inability to use the software or documentation.  \nRelease 25.5  \nLast Updated: 24 June 2025  \nThis page intentionally left blank.  \nCONTENTS  \nLESSON 1 — SCHEDULE OVERVIEW  13  \nOverview of the Schedule And Risk Process  13  \nPlan View  14  \nMarkup View  16  \nSchedule Review View  17  \nCost Risk View  18  \nShort Interval Planning View  19  \nRisk Register View  19  \nLESSON 2 — USER ACCESS  23  \nSchedule Navigation  23  \n2.0.0.1 Main Menu  23  \nOpen Schedule from Main Menu  23  \nUser Setup and Roles  25  \nSchedule Roles  25  \nSchedule Creator  25  \nProject Member  26  \nAdministrator  26  \nKnowledge Base Administrator  27  \nUser Creation  27  \nCreate a New User  27  \nSchedule Contributor Setup  30  \nSchedule Contributors  30  \nContributor Role Types  30  \nMarkup  31  \nShort Interval Planner  31  \nScheduler  31  \nSelecting Project Contributors  31  \nLESSON 3 — USER INTERFACE  35  \nProject List View  35  \n3.0.0.1 Schedule folders  37  \n3.0.0.2 Schedule type  39  \nLocked Columns  41  \n3.0.1 Show/Hide Logic, WBS  44  \nAnnotations  44  \n3.0.2 Schedule Critique Overview  47  \nToggle Schedule Critique Annotations On / Off:  47  \n3.0.2.3 Missing Predecessor or Successor  49  \nBuilder Menus  49  \n3.0.2.4 Column set builder menu  50  \n3.0.2.5 Query builder menu  51  \n3.0.2.6 Sort builder menu  52  \n3.0.2.7 Group by builder menu  53  \n3.0.2.8 View builder menu  55  \nHide No Results  56  \nLESSON 3 — KNOWLEDGE LIBRARY  57  \nKnowledge Base  57  \nResources in the Knowledge Base  57  \nCPM Schedule  58  \nActivity Productivity Rates  59  \nKnowledge Tags  60  \nCalendars  61  \nRegister  62  \nCategories  65  \nMachine learning  68  \nSet Up Resources  69  \nImport/Export  72  \nSite Administration  74  \nGeneral Settings  75  \nUsers  75  \nLESSON 4 — PROJECT CREATION  77  \nImport a Schedule  77  \nImporting a schedule  77  \nExport a Schedule  79  \nExporting a schedule  79  \nCreate a Schedule from Scratch  80  \nDetails  80  \nContext  82  \nOutline  82  \nSchedule Configuration Settings  85  \nSchedule Configuration  86  \nGeneral  87  \nContributors  88  \nKnowledge Tags  88  \nCalendars  88  \nResources  89  \nSIP Resources  91  \nProject Suite  92  \nPrint View  92  \nPage Setup  92  \nGantt Setup  94  \n4.0.0.1 Print Templates  95  \nSave to PDF  95  \nLESSON 5 — PACKAGES AND ACTIVITIES  97  \nActivity Productivity Rates  97  \nSet the productivity factor  97  \nUsing the Productivity Rate Calculator  99  \nUsing the Knowledge Base Suggested Rates  102  \nCalculate Productivity Rates  104  \nCreate Activities  106  \nKnowledge subnets  106  \nBuilding a schedule  107  \nActivities from Scratch  108  \nBuild Activities from Scratch  109  \n5.0.0.1 WBS summary activity type  110  \n5.0.0.2 Change Activity Type  112  \nChange Activity Type  112  \nBulk Activities from Scratch  113  \nCreate Activities in Bulk  114  \nAssign Knowledge Tags  115  \nAssigning Knowledge Tags in the Iris  115  \nAssigning Logic  117  \nUsing the Gantt Chart to Assign Logic  117  \nP","cbCaibdY7m9U3EMh","https://ap.wps.com/l/cbCaibdY7m9U3EMh","pdf",37624041,291,"English","# Lesson 1 — Schedule Overview\n## Overview of the Schedule And Risk Process\n## Plan View\n## Markup View\n## Schedule Review View\n## Cost Risk View\n## Short Interval Planning View\n## Risk Register View\n# Lesson 2 — User Access\n## Schedule Navigation\n## Main Menu\n## Open Schedule from Main Menu\n## User Setup and Roles\n## User Creation\n## Schedule Contributor Setup\n# Lesson 3 — User Interface\n## Project List View\n## Schedule folders\n## Schedule type\n## Locked Columns\n## Show/Hide Logic, WBS\n## Annotations\n## Schedule Critique Overview\n## Builder Menus\n# Lesson 3 — Knowledge Library\n## Knowledge Base\n## Resources in the Knowledge Base\n## Knowledge Tags\n## Calendars\n## Register\n# Lesson 4 — Project Creation\n## Import a Schedule\n## Export a Schedule\n## Create a Schedule from Scratch\n## Schedule Configuration Settings\n# Lesson 5 — Packages and Activities\n## Productivity Rates\n## Set the productivity factor\n## Create Activities\n## Assign Knowledge Tags\n## Assigning Logic\n## Planning Mode\n# Lesson 6 — Resource Management\n## Project Resources\n## Resource Assignments\n## Resource Histogram\n## Filtering by Resource\n## Export Assignments\n## Project-specific Resources\n# Lesson 7 — Scheduling\n## Scheduling Overview\n## Setting Schedule Progress Attributes\n## Snapshot And Schedule Settings\n## Baseline/Snapshot","[{\"question\":\"What does Lesson 1 cover in the Schedule User Guide?\",\"answer\":\"It introduces the schedule overview and risk process, and explains key views such as Plan, Markup, Schedule Review, Cost Risk, Short Interval Planning, and the Risk Register.\"},{\"question\":\"How are users and roles managed in Lesson 2?\",\"answer\":\"Lesson 2 describes schedule navigation, the main menu flow for opening schedules, user setup and roles, and steps for creating users and configuring contributor roles.\"},{\"question\":\"What topics are included in resource management and scheduling?\",\"answer\":\"Resource management covers project resources, resource assignments, histogram tools (including comparison, S-curve, and over-allocation views), and histogram export/import. Scheduling covers scheduling progress attributes, percent complete handling, snapshot/scheduling settings, and baseline/snapshot workflows.\"}]","Schedule User Guide - Release 25.5 - Last Updated 24 June 2025 | PDF",1789175814,102]