[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-392777-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-392777-en":127},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","schedule-of-finishes-finish-selections-1-2-house-construction-materials","Schedule of Finishes - Finish Selections 1-2 - House Construction Materials","","Schedule of Finishes for a house specifies construction and finishes in line with National Building Regulations SANS 10400, local authority requirements, and major financial institution requirements. It states precedence rules for conflicts, material availability provisions, and limits on colour or texture matching. The document presents two finish options (LIPIZZAN and CASPIAN) and details floor, wall, tiling, skirting, doors and windows, including external and internal applications subject to architect approval.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/forms/","Forms",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/schedule-of-finishes-finish-selections-1-2-house-construction-materials/392777/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/schedule-of-finishes-finish-selections-1-2-house-construction-materials/392777.png","ImageObject",442,249,{"name":42,"@type":43},"Fahsai","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-20","2026-09-25",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",8,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What governs the specification if conflicts arise with other designs or commitments?","Question",{"text":63,"@type":64},"The specification overrides other designs or verbal commitments in case of differences. Verbal commitments apply only when reduced to writing.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What are the two finish selections described in the document?",{"text":68,"@type":64},"The document defines two finish options: LIPIZZAN (Finish Selection 1) and CASPIAN (Finish Selection 2), each with distinct colour and material character.",{"name":70,"@type":61,"acceptedAnswer":71},"Can the seller substitute materials if specified materials are unavailable?",{"text":72,"@type":64},"Yes. If materials are not readily available or delays occur, the seller has the right to use the nearest similar material available. The seller also cannot guarantee exact colour or texture matching to samples.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},392777,1791165001,{"code":4,"msg":82,"data":83},"success",[84,89,94,99,104,109,113,118,123],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":86,"show_sort_weight":87,"slug":88},11,"Presentations",90,"presentations",{"id":90,"doc_module":22,"doc_module_name":25,"category_name":91,"show_sort_weight":92,"slug":93},12,"Resumes",80,"resumes",{"id":95,"doc_module":22,"doc_module_name":25,"category_name":96,"show_sort_weight":97,"slug":98},14,"Invoices",70,"invoices",{"id":100,"doc_module":22,"doc_module_name":25,"category_name":101,"show_sort_weight":102,"slug":103},15,"Posters",60,"posters",{"id":105,"doc_module":22,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},16,"Social Media",50,"social-media",{"id":110,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":111,"slug":112},17,40,"forms",{"id":114,"doc_module":22,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},18,"Letters",30,"letters",{"id":119,"doc_module":22,"doc_module_name":25,"category_name":120,"show_sort_weight":121,"slug":122},21,"Paper Templates",5,"papers-templates",{"id":124,"doc_module":22,"doc_module_name":25,"category_name":125,"show_sort_weight":4,"slug":126},158,"General","general-158",{"code":4,"msg":82,"data":128},{"doc_id":79,"user_id":129,"nickname":42,"user_avatar":130,"doc_module":22,"category_id":110,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":90,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":140,"read_time":33},549768702563,"https://ap-avatar.wpscdn.com/avatar/8000c4aa63b76e948b?x-image-process=image/resize,m_fixed,w_180,h_180&k=1786536092046926083","SCHEDULE OF FINISHES Houses  \n7 COLT STREET, KYALAMI  \nSCHEDULE OF FINISHES  \nPRELIMINARIES  \nThe buildings will be erected substantially in compliance with the National Building Regulations, SANS 10400, the requirements of the Local Authority and any major Financial Institution, but this specification will not override these requirements should any conflicts arise.  \nIn the event of any differences between this specification and other designs or verbal commitments, this specification will override.  \nUnless reduced to writing, no verbal commitments will apply.  \nAll materials herein specified are subject to availability. If any materials are not readily available, or undue delay is experienced in obtaining them, the Seller shall have the right to use the nearest similar material available.  \nThe Seller cannot guarantee that the materials used will be the same colour or texture as any sample inspected by the Purchaser or shown to the Purchaser by the Seller or its representatives. Where any materials are not clearly specified, or indicated on the drawings, the Seller shall have the right to use the material it considers to be the most suitable for the purpose  \nFinish Options  \nLIPIZZAN (Finish Selection 1)  \nThe combination of grey shades and natural colours establish a strong connection with nature all the while creating a sense of space. This makes the home feel airy, enhancing the spread of natural light.  \nCASPIAN (Finish Selection 2)  \nThis lush, warmer finish option to lends homes a cosy and comforting feel, with a prominent brown undertone hinted with grey for a balanced look.  \n2  \nSCHEDULE OF FINISHES  \nFLOORS  \nInternal & External Floor Finishes-subject to architect’s approval  \n• External Walkways  \n- Paving (Applicable for both finish selections)  \n• Garage Floor  \n- Steel floated screed (both finish selections)  \n• All tiles and wooden laminate flooring as per finish selection:  \n- LIPIZANNE or CASPIAN  \n• Ceramic Tiles or similar  \n- Porch (External)  \n- Covered Patio (External)  \n- Dining room, passage  \n- Kitchen and bathrooms  \n- Entrance  \n• Shower Floor Mosaic Tiles  \n- Grey square mosaic tiles or similar  \n- All shower floors  \n• Laminate flooring or similar  \n- Bedrooms  \n- Living Room  \nSkirting  \n• Wooden skirting  \n• 75 mm painted wooden skirting (Colour to Architect’s specification)  \n• Tile skirting in bathrooms  \nLIPIZZAN SELECTION  \nGeneral Floor Tile  \nCASPIAN SELECTION  \nGeneral Floor Tile  \nLIPIZZAN SELECTION  \nShower Floor Tile  \nPaving  \nSkirting  \nCASPIAN SELECTION  \nShower Floor Tile  \nGarage Screed  \nLIPIZZAN SELECTION  \nLaminate Floor  \nCASPIAN SELECTION  \nLaminate Floor  \nSCHEDULE OF FINISHES  \nWALL FINISHES  \nGeneral External Wall Finishes-subject to architect’s approval  \n• Plaster & Paint  \n- Steel floated plaster  \n- Walls to be primed and painted  \nLisbon Cove  \n• Provisional External Paint Selection  \n- Boundary Wall Paint-Lisbon Cove or similar  \n- Exterior Wall Paint-Crete Shore or similar  \n- Boundary & Exterior Wall Paint-Off Shore or similar  \nFace Brick & Stone Cladding-subject to architect’s approval  \n• Face brick plinth to architect’s approval  \n• Provisional Application Areas:  \n- Development Boundary walls  \n- Development entrance (bottom of guardhouse)  \n- Exterior of the house as indicated by architect  \n• Wood Panels/Cladding to architect’s approval  \nThe unique element of wood is seen in some of the external features of the development.  \n• Provisional Application Areas:  \n- Guardhouse features  \n- Signage walls of development  \n- Pergolas and covered patios  \n- General feature in common areas  \nFace Brick  \nWood Cladding  \n(Illustration purposes only)  \nCrete Shore  \nOff Shore  \nSCHEDULE OF FINISHES  \nGeneral Internal Wall Finishes-subject to architect’s approval Wall Tiling  \n• Kitchen  \nCeramic tiles-provisionally subway tiles Installed only in the kitchen behind the gas hob  \n• Bathroom-Shower  \nCeramic tiles in shower as per finish selection  \nPlaster & Paint (al","cbCaidHCYOhneFpX","https://ap.wps.com/l/cbCaidHCYOhneFpX","pdf",16168083,"English","# PRELIMINARIES\n## Finish Options\n# FLOORS\n## LIPIZZAN SELECTION\n## CASPIAN SELECTION\n# WALL FINISHES\n## General External Wall Finishes\n## General Internal Wall Finishes\n# DOORS & WINDOWS","[{\"question\":\"What governs the specification if conflicts arise with other designs or commitments?\",\"answer\":\"The specification overrides other designs or verbal commitments in case of differences. Verbal commitments apply only when reduced to writing.\"},{\"question\":\"What are the two finish selections described in the document?\",\"answer\":\"The document defines two finish options: LIPIZZAN (Finish Selection 1) and CASPIAN (Finish Selection 2), each with distinct colour and material character.\"},{\"question\":\"Can the seller substitute materials if specified materials are unavailable?\",\"answer\":\"Yes. If materials are not readily available or delays occur, the seller has the right to use the nearest similar material available. The seller also cannot guarantee exact colour or texture matching to samples.\"}]","Schedule of Finishes - Finish Selections 1-2 - House Construction Materials | PDF",1790373992]