[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-666907-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-666907-en":126},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","sample-pavement-maintenance-program-airport-pavement-maintenance-program-inspection-schedule-and-inventory","SAMPLE PAVEMENT MAINTENANCE PROGRAM - Airport pavement maintenance program inspection schedule and inventory","","Sample Pavement Maintenance Program (PMP) supporting an airport Sponsor in developing a customized pavement maintenance plan for airfield surfaces. The program outlines how to gather site-specific information, maintain adequate resources and commitment, and establish an operational framework that can evolve over time. It includes an inspection schedule with responsibilities, repair response timelines for routine and emergency issues, and a pavement inventory approach describing pavement elements, structures, materials, drainage features, usage, strength, priority, and notable conditions.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/paper-templates/","Paper Templates",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/sample-pavement-maintenance-program-airport-pavement-maintenance-program-inspection-schedule-and-inventory/666907/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/sample-pavement-maintenance-program-airport-pavement-maintenance-program-inspection-schedule-and-inventory/666907.png","ImageObject",442,249,{"name":42,"@type":43},"Anna Hans","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-29","2026-10-30",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",5,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the purpose of this sample Pavement Maintenance Program (PMP)?","Question",{"text":63,"@type":64},"It serves as a starting-point template to help an airport Sponsor develop an airport-specific pavement maintenance program (PMP) based on site needs, conditions, and resources.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Who is responsible for completing pavement inspections and storing reports?",{"text":68,"@type":64},"Inspections are completed by the Airport Manager, Airport Maintenance Staff, or other qualified personnel as approved by the Airport Manager, and completed inspection reports are kept on file with the Airport Manager’s office.",{"name":70,"@type":61,"acceptedAnswer":71},"What is the expected timeline for routine versus emergency repairs after inspections?",{"text":72,"@type":64},"Routine repairs are performed as soon as possible or deferred to regular cyclic repair schedules when appropriate, while emergency repairs must be performed within 24 hours with confirmation by the Airport Manager.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},666907,1793394954,{"code":4,"msg":82,"data":83},"success",[84,89,94,99,104,109,114,119,122],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":86,"show_sort_weight":87,"slug":88},11,"Presentations",90,"presentations",{"id":90,"doc_module":22,"doc_module_name":25,"category_name":91,"show_sort_weight":92,"slug":93},12,"Resumes",80,"resumes",{"id":95,"doc_module":22,"doc_module_name":25,"category_name":96,"show_sort_weight":97,"slug":98},14,"Invoices",70,"invoices",{"id":100,"doc_module":22,"doc_module_name":25,"category_name":101,"show_sort_weight":102,"slug":103},15,"Posters",60,"posters",{"id":105,"doc_module":22,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},16,"Social Media",50,"social-media",{"id":110,"doc_module":22,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},17,"Forms",40,"forms",{"id":115,"doc_module":22,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},18,"Letters",30,"letters",{"id":120,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":55,"slug":121},21,"papers-templates",{"id":123,"doc_module":22,"doc_module_name":25,"category_name":124,"show_sort_weight":4,"slug":125},158,"General","general-158",{"code":4,"msg":82,"data":127},{"doc_id":79,"user_id":128,"nickname":42,"user_avatar":129,"doc_module":22,"category_id":120,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":135,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":80,"read_time":26,"preview_page_count":33,"preview_urls":140},5909892332657,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","SAMPLE PAVEMENT MAINTENANCE PROGRAM  \nWe are providing this sample PMP to assist an airport Sponsor with the development of pavement maintenance program (PMP) specific to their airport. This sample does not establish complete program the Sponsor can immediately apply to their airport. This Sponsor may use this sample as a starting point for developing their customized PMP  \nEach airport should customize the collected information to best fit the needs, conditions, and resources of the airport. This information should allow an airport to develop an initial program that can evolve over time. As with all successful endeavors, the maintenance program must be provided with sufficient resources and commitment if it is to succeed.  \nAirfield Pavement Maintenance Program  \nAnywhere Municipal Airport  \nAnywhere, USA  \n1. GENERAL INFORMATION  \nThe Anywhere Municipal Airport was originally opened in 1966 as a private landing strip and consisted of a turf runway with ample parking space. The City of Anywhere purchased the airport in 1974 and major improvements were completed during the summer of 1975. Improvements, funded in part through a grant from the Federal Aviation Administration (FAA) consisted of the construction of a 4000’ X 75’ runway, 20,000 square yard apron, and a partial parallel taxiway. Through a second grant from the FAA, the runway was extended 1,000 feet to the South in 1995 and the remainder of the parallel taxiway was constructed. The original runway and taxiway were overlaid with 3 inches of Hot Mix Asphalt to increase the load carrying capacity required by increased usage of the airport.  \nThe airport is located Northeast of the City of Anywhere and is just South of the Lottawater River. The airport is located near the perimeter of the river’s flood plain in a area protected for a 100 year flood. An oxford bow from a previous alignment of the river is located just north of the runway and taxiway. This area experiences high water tables and medium to severe frost damage. The average frost penetration is 32 inches. The general soils in the area are lean clays with pockets of silty sand. Frost damage is isolated to the pockets of silty sand.  \n2. INSPECTION SCHEDULE  \nThe Anywhere Airport pavement inspections will be completed at the noted frequencies by the Airport Manager, Airport Maintenance Staff, or other qualified personnel as approved by the airport manager. Copies of the completed inspection reports will be kept on file with the airport manager’s office.  \nShould any inspection reveal the need for repair, the inspector document the distress and notify the airport manager who will make arrangements for repair. Routine repairs will be performed as soon as possible or deferred to regular cyclic repair schedules where appropriate. Emergency repairs will be performed within 24 hours with confirmation by the airport manager.  \nA. Daily Inspections-All pavements will be inspected daily for FOD and obvious damage to the pavement. These inspections will be drive-by inspections to detect unexpected changes in the pavement condition or any situation creating an unsafe condition  \nB. Bi-monthly Inspections-Each element of pavement will be subdivided into 3 sections. Stagger inspection of sections so that each element is fully inspected every 6 months.  \nC. 6-Month Inspections-All pavements will be inspected for follow-up on required maintenance items. Obvious distresses, not previously identified, should be noted. The 6-month inspection will be in the spring and fall after adverse seasonal weather conditions have ended.  \nD. Annual Inspection-All pavements are to be visually observed for general performance and condition. Review and revise the maintenance program, as necessary, at this time. Pavements that show increase in deterioration should be identified for inclusion in capital improvement plan. Preventive maintenance should be identified and recommended for budgeting. Annual inspections will be performed in the spring ","cbCaiqeAqRHlZozw","https://ap.wps.com/l/cbCaiqeAqRHlZozw","pdf",274599,6,"English","# 1. GENERAL INFORMATION\n# 2. INSPECTION SCHEDULE\n## A. Daily Inspections\n## B. Bi-monthly Inspections\n## C. 6-Month Inspections\n## D. Annual Inspection\n## E. 3-year Inspection\n# 3. PAVEMENT INVENTORY","[{\"question\":\"What is the purpose of this sample Pavement Maintenance Program (PMP)?\",\"answer\":\"It serves as a starting-point template to help an airport Sponsor develop an airport-specific pavement maintenance program (PMP) based on site needs, conditions, and resources.\"},{\"question\":\"Who is responsible for completing pavement inspections and storing reports?\",\"answer\":\"Inspections are completed by the Airport Manager, Airport Maintenance Staff, or other qualified personnel as approved by the Airport Manager, and completed inspection reports are kept on file with the Airport Manager’s office.\"},{\"question\":\"What is the expected timeline for routine versus emergency repairs after inspections?\",\"answer\":\"Routine repairs are performed as soon as possible or deferred to regular cyclic repair schedules when appropriate, while emergency repairs must be performed within 24 hours with confirmation by the Airport Manager.\"}]","SAMPLE PAVEMENT MAINTENANCE PROGRAM - Airport pavement maintenance program inspection schedule and inventory | PDF",[141,145,149,153],{"page_no":22,"url":142,"width":143,"height":144},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-18/a6f35706111561b53e9e656c8cb4fa2b.webp",983,1272,{"page_no":26,"url":146,"width":147,"height":148},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-18/7169d3f12535a852b1c3d99f92f0a58f.webp",982,1270,{"page_no":30,"url":150,"width":151,"height":152},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-18/51724f0b6d6db1f693dbfd4a14555a35.webp",981,1269,{"page_no":33,"url":154,"width":155,"height":156},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-18/19af9fa97710ff8067a1eb8d00c66efe.webp",980,1268]