[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-392780-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-392780-en":127},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","room-finish-legend-abbreviations-room-finish-schedule-basement-first-floor-patient-rooms-typical-material-schedule","ROOM FINISH LEGEND & ABBREVIATIONS - ROOM FINISH SCHEDULE - BASEMENT - FIRST FLOOR - PATIENT ROOMS (TYPICAL) - MATERIAL SCHEDULE","","Room finish legends, abbreviations, and a multi-level room finish schedule define wall, floor, base, and ceiling finishes across basement and first-floor areas, including patient toilet rooms and patient rooms (typical). The schedule assigns finish codes to named spaces and locations, with detailed remarks for matching existing finishes and patching as needed. A material schedule links each finish code to product categories, manufacturers, style/color, grout and sealer notes, and key dimensions to standardize specification and installation.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/presentations/","Presentations",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/room-finish-legend-abbreviations-room-finish-schedule-basement-first-floor-patient-rooms-typical-material-schedule/392780/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/room-finish-legend-abbreviations-room-finish-schedule-basement-first-floor-patient-rooms-typical-material-schedule/392780.png","ImageObject",442,249,{"name":42,"@type":43},"Melati","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-19","2026-09-25",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",7,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What does the Room Finish Legend & Abbreviations section provide?","Question",{"text":63,"@type":64},"It lists finish abbreviations and symbols (e.g., ACT, CPT, VCT, LVT, P, SC) and defines what each code means for walls, floors, bases, and ceilings.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"How are finishes assigned to rooms on the Room Finish Schedules?",{"text":68,"@type":64},"Each named space includes floor finish, base finish, wall finish, and ceiling finish entries using specific finish codes and transition notes where applicable.",{"name":70,"@type":61,"acceptedAnswer":71},"What information is included in the Material Schedule?",{"text":72,"@type":64},"The Material Schedule maps finish codes to material/product types, manufacturers, style and color, size/dimensions, and remarks such as grout and sealer specifications.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},392780,1791717737,{"code":4,"msg":82,"data":83},"success",[84,88,93,98,103,108,113,118,123],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":86,"slug":87},11,90,"presentations",{"id":89,"doc_module":22,"doc_module_name":25,"category_name":90,"show_sort_weight":91,"slug":92},12,"Resumes",80,"resumes",{"id":94,"doc_module":22,"doc_module_name":25,"category_name":95,"show_sort_weight":96,"slug":97},14,"Invoices",70,"invoices",{"id":99,"doc_module":22,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},15,"Posters",60,"posters",{"id":104,"doc_module":22,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},16,"Social Media",50,"social-media",{"id":109,"doc_module":22,"doc_module_name":25,"category_name":110,"show_sort_weight":111,"slug":112},17,"Forms",40,"forms",{"id":114,"doc_module":22,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},18,"Letters",30,"letters",{"id":119,"doc_module":22,"doc_module_name":25,"category_name":120,"show_sort_weight":121,"slug":122},21,"Paper Templates",5,"papers-templates",{"id":124,"doc_module":22,"doc_module_name":25,"category_name":125,"show_sort_weight":4,"slug":126},158,"General","general-158",{"code":4,"msg":82,"data":128},{"doc_id":79,"user_id":129,"nickname":42,"user_avatar":130,"doc_module":22,"category_id":85,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":55,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":140,"read_time":30},962085570644,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","1  \n2  \n3  \n4  \n5  \n6  \n7  \n8  \n9  \n10  \n\n| ROOM FINISH LEGEND & ABBREVIATIONS |  |  |  |  |\n| --- | --- | --- | --- | --- |\n| \u003Cbr>CG  |  | CORNER GUARD | AF10 | KEYNOTE |\n| |  | WALL\u003Cbr>PROTECTION | | MATERIAL INSTALL DIRECTION |\n| CPT  | VCT | FLOOR FINISH TRANSITION |  |  |\n| ACT ACOUSTICAL CEILING (TILE)\u003Cbr>CT CERAMIC TILE\u003Cbr>GWB (SC) GYPSUM WALLBACK SYSTEMS (SPECIAL COATING)\u003Cbr>LVT LUXURY VINYL TILE\u003Cbr>P PAINT\u003Cbr>PT PORCELAIN TILE (FLOOR AND BASE) RB RESILIENT BASE\u003Cbr>RES RESINOUS EPOXY FLOORING\u003Cbr>RES-W RESINOUS/EPOXY WALL/CEILING\u003Cbr>RF RUBBER FLOORING\u003Cbr>S SOLID SURFACE\u003Cbr>SC SPECIAL COATING\u003Cbr>SP SPECIAL FACED\u003Cbr>WSF WELDED SEAM SHEET FLOORING (HEAT WELDED WITH ROD) |  |  |  |  |\n| NOTE: NOT ALL SYMBOLS MAY BE USED ON EACH PLAN |  |  |  |  |\n\nA  \nB  \nC  \nROOM FINISH SCHEDULE-BASEMENT  \n3  \n3A  \n66  \n76  \n78  \n79  \nNumber  \nNAME  \nCORRIDOR  \nSTORAGE  \nSTAIR  \nTESTING OFFICE  \nMENTAL HEALTH MULTI-USE SPACE MECHANICAL  \nFLOOR FINISH VCT-1  \nVCT-1  \nMATCH EXIST CPT-1  \nCPT-1  \nC  \nBASE FINISH RB-1  \nRB-1  \nMATCH EXIST CPT-1  \nCPT-1 RB-1  \nNORTH MATCH EXIST P-1  \nEXIST P-1  \nP-1  \nN/A  \nEAST MACTH EXIST P-1  \nMATCH EXIST P-1  \nP-1  \nN/A  \nWALL FINISH  \nSOUTH MATCH EXIST P-1  \nEXIST P-2 P-2 N/A  \nWEST MACTH EXIST P-1  \nMATCH EXIST P-2  \nP-2  \nN/A  \nCEILING FINISH ACT-1  \nACT-1  \nACT-1  \nACT-1  \nN/A  \nREMARKS  \nPATCH FINISHES THIS AREA TO MATCH EXISTING AS NECESSARY  \nPATCH FINISHES THIS AREA TO MATCH EXISTING AS NECESSARY.  \nSEE FINISH PLAN FOR ADDITIONAL INFORMATION  \nFINISH GYB BD TO LEVEL 1  \n1  \nROOM FINISH SCHEDULE-FIRST FLOOR  \nWALL FINISH  \nNumber 133  \n170  \n134  \n142  \n149  \n150  \n153  \n154  \nCE-5  \n164  \n165  \n135  \n136  \n159  \n166  \n167  \n168  \nCE-2  \nCE-3  \n160  \nCE-4  \n160A  \n169  \n134A  \n134B  \nT1  \n164A  \n171  \nNAME  \nELECTRICAL ROOM  \nHAC  \nCONFERENCE/BREAK ROOM  \nSOILED UTILITY  \nOFFICE  \nMED  \nLAUNDRY  \nTOILET  \nCORRIDOR  \nMULTI - PURPOSE ROOM  \nKICHENETTE  \nVENDING  \nOFFICE  \nCLEAN LINEN  \nOPEN LOUNGE  \nLOW VOLTAGE  \nSTAFF  \nCORRIDOR  \nCORRIDOR  \nSPD  \nCORRIDOR  \nSTORAGE  \nOXYGEN ROOM  \nSTORAGE  \nCORRIDOR  \nCONNECTING CORRIDOR  \nCLOSET  \nMECH ACCESS  \nFLOOR FINISH  \nEXIST PT-2  \nCPT-1/VCT-1 WSF-1 CPT-1  \nVCT-1  \nWSF-1 PT-1/PT-2 CPT-1  \nCPT-1  \nVCT-1  \nVCT-1  \nCPT-1  \nWSF-1 CPT-1/CPT-2  \nCVCT-1  \nCPT-1  \nCPT-1  \nVCT-1  \nCPT-1  \nVCT-1  \nVCT-1  \nCPT-1  \nVCT-1  \nEXIST CPT-1  \nVCT-1  \nBASE FINISH  \nEXIST  \nPT-2 RB-1 WSF-1 CPT-1 RB-1 WSF-1 CT-3 CPT-1  \nCPT-1 RB-1 RB-1 CPT-1 WSF-1 CPT-1 RB-1 RB-1 CPT-1  \nCPT-1 RB-1 CPT-1 RB-1 RB-1 RB-1 RB-1  \nEXIST CPT-1 RB-1  \nNORTH P-1  \nSC-1  \nP-1 RWC-1/SC-1 P-1  \nP-1  \nP-3  \nCT-1/CT-2/P-3 P-2  \nP-1  \nN/A  \nP-1  \nP-3 RWC-1/SC-1 P-2  \nP-1  \nP-1  \nN/A  \nN/A  \nP-1  \nP-2  \nP-1  \nP-1  \nP-1  \nP-1 EXIST P-1  \nP-1  \nEAST P-1  \nSC-1  \nP-2 RWC-1/SC-1 P-1  \nP-1  \nP-3  \nCT-1/CT-2/P-3 P-1  \nP-1  \nN/A  \nP-1  \nP-3 RWC-1/SC-1 P-1  \nP-1  \nP-1  \nN/A  \nP-1  \nP-1  \nN/A  \nP-1  \nP-1  \nP-1  \nP-1 EXIST P-1  \nP-1  \nSOUTH P-1  \nSC-1 P-1/P-2 RWC-1/SC-1 P-1  \nP-1  \nP-3  \nCT-1/CT-2/P-3 P-1  \nP-2  \nN/A  \nP-1  \nP-3 RWC-1/SC-1 N/A  \nP-1  \nP-1  \nP-1  \nP-1  \nP-1  \nP-1  \nP-1  \nP-1  \nP-1  \nP-1 EXIST P-1  \nP-1  \nWEST  \nP-1 CT-4/SC-1 P-1 RWC-1/SC-1 P-1  \nP-1  \nP-3  \nCT-1/CT-2/P-3 N/A  \nP-1  \nP-2  \nP-1  \nP-3 RWC-1/SC-1 P-1  \nP-1  \nP-1  \nP-1  \nN/A  \nP-1  \nP-1  \nP-1  \nP-1  \nP-1  \nP-1 EXIST P-1  \nP-1  \nCEILING FINISH  \nN/AACT-2  \nACT-1  \nACT-1  \nACT-1  \nACT-1  \nACT-1  \nACT-2/P-1  \nACT-1  \nACT-1  \nGYP BD (P-2) ACT-1  \nP-1 ACT-2  \nACT-1  \nN/AACT-1  \nACT-1  \nACT-1  \nACT-1  \nACT-1  \nACT-1  \nACT-1  \nACT-1  \nACT-1  \nEXIST ACT-1  \nN/A  \nREMARKS  \nSEE FINISH PLAN FOR ADDITIONAL INFORMATION RWC WITH TRIM TO 4'0\" AFF  \nPT-2 AT COLUMNS  \nRWC WITH TRIM TO 4'0\" AFF PT-2 AT COLUMNS  \nPT-2 AT COLUMNS  \nPT-2 AT COLUMNS  \nPT-2 AT COLUMNS  \nROOM FINISH SCHEDULE-PATIENT ROOMS (TYPICAL)  \n1  \nWALL FINISH  \nNAME FLOOR FINISH BASE FINISH NORTH EAST SOUTH WEST CEILING FINISH Comments  \nPATIENT TOILET ROOMS PT-1/PT-2 CT-3 CT-1/CT-2/P-3 CT-1/CT-2/P-3 CT-1/CT-2/P-3 CT-1/CT-2/P-3 ACT-2/P-1  \nPATIENT ROOMS CPT-1 CPT-1 SEE FINISH PLAN SEE FINISH ","cbCaik3EZn1QDVSK","https://ap.wps.com/l/cbCaik3EZn1QDVSK","pdf",3156171,"English","# Room Finish Legend & Abbreviations\n## Room Finish Schedule - Basement\n## Room Finish Schedule - First Floor\n## Room Finish Schedule - Patient Rooms (Typical)\n## Material Schedule","[{\"question\":\"What does the Room Finish Legend \\u0026 Abbreviations section provide?\",\"answer\":\"It lists finish abbreviations and symbols (e.g., ACT, CPT, VCT, LVT, P, SC) and defines what each code means for walls, floors, bases, and ceilings.\"},{\"question\":\"How are finishes assigned to rooms on the Room Finish Schedules?\",\"answer\":\"Each named space includes floor finish, base finish, wall finish, and ceiling finish entries using specific finish codes and transition notes where applicable.\"},{\"question\":\"What information is included in the Material Schedule?\",\"answer\":\"The Material Schedule maps finish codes to material/product types, manufacturers, style and color, size/dimensions, and remarks such as grout and sealer specifications.\"}]","ROOM FINISH LEGEND & ABBREVIATIONS - ROOM FINISH SCHEDULE - BASEMENT - FIRST FLOOR - PATIENT ROOMS (TYPICAL) - MATERIAL SCHEDULE | PDF",1790374062]