[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-253845-105":53,"doc-detail-253845-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","roof-inspection-form-certification-and-photo-requirements","Roof Inspection Form - Certification and Photo Requirements","","Roof Inspection Form captures property and insured details, including applicant name, policy/application number, inspected address, and date. It records predominant and secondary roof characteristics such as covering material, roof age, remaining useful life, prior permit dates, and update or replacement selections. The form documents roof condition with checklists for damage, deterioration, and potential leaks, plus interior and underside observations. It also includes certification statements, inspector licensing fields, required photo documentation, and guidance for additional comments and agent review prior to submission for coverage.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/roof-inspection-form-certification-and-photo-requirements/253845/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/roof-inspection-form-certification-and-photo-requirements/253845.png","ImageObject",442,249,{"name":88,"@type":89},"Aditya","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-11-01","2026-09-13",true,{"@type":98,"interactionType":99,"userInteractionCount":25},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What information is required at the top of the Roof Inspection Form?","Question",{"text":108,"@type":109},"The form requires the insured/applicant name, the application/policy number, the inspected address, and the date inspected.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"Which roof details must be recorded for the predominant and secondary roofs?",{"text":113,"@type":109},"It requires covering material, roof age, remaining useful life, dates of last roofing permit and last update, and whether updates are selected, including replacement type and overall condition.",{"name":115,"@type":106,"acceptedAnswer":116},"What happens if damage, deterioration, or leaks are noted during inspection?",{"text":117,"@type":109},"The inspector must complete additional comments with full details and include explanations where required, especially for hazards/deficiencies or any visible signs of leaks and related observations.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},253845,1791303161,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":25,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":76,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":9},962085564549,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","Roof Inspection Form  \nInsured/Applicant Name:  John Doe  Application / Policy \\#:   Address Inspected:  123 N. Main St., Jacksonville, FL 32223   \nDate Inspected:  05/21/2025   \n\n| Roof (With photos of each roof slope, this section can take the place of the Roof Inspection Form.) |  |  |  |\n| --- | --- | --- | --- |\n| Predominant Roof\u003Cbr>Covering material:  3-Tab Shingle \u003Cbr>Roof age (years):  11 \u003Cbr>Remaining useful life (years):  9 \u003Cbr>Date of last roofing permit:  09/26/2014 \u003Cbr>Date of last update:  09/26/2014\u003Cbr>If updated (check one): |  | Secondary Roof\u003Cbr>Covering material:   Roof age (years):  \u003Cbr>Remaining useful life (years):  \u003Cbr>Date of last roofing permit:  \u003Cbr>Date of last update:  \u003Cbr>If updated (check one):\u003Cbr> Full Replacement\u003Cbr> Partial Replacement\u003Cbr>% of replacement  Overall condition: |  |\n| | Full Replacement Partial Replacement |  |  |\n| % of replacement   Overall condition: |  |  |  |\n| | Satisfactory\u003Cbr>Unsatisfactory (explain below) | | Satisfactory\u003Cbr>Unsatisfactory (explain below) |\n| Any visible signs of damage / deterioration?\u003Cbr>(check all that apply and explain below)  Cracking\u003Cbr> Cupping/Curling\u003Cbr> Excessive granule loss\u003Cbr> Exposed asphalt\u003Cbr> Exposed felt\u003Cbr> Missing/loose/cracked tabs or tiles\u003Cbr> Soft spots in decking  Visible hail damage  None\u003Cbr>Any visible signs of leaks  Yes  No Attic/underside of decking  Yes  No Interior ceilings  Yes  No |  | Any visible signs of damage / deterioration?\u003Cbr>(check all that apply and explain below)  Cracking\u003Cbr> Cupping/Curling\u003Cbr> Excessive granule loss\u003Cbr> Exposed asphalt\u003Cbr> Exposed felt\u003Cbr> Missing/loose/cracked tabs or tiles\u003Cbr> Soft spots in decking  Visible hail damage  None\u003Cbr>Any visible signs of leaks  Yes  No Attic/underside of decking  Yes  No Interior ceilings  Yes  No |  |\n\nHouseScan Inspections (INS) 05/21/2025  \nHouseScan Inspections (INS) Page 1 of 3  \nRoof Inspection Form  \n\n| Additional Comments/Observations (use additional pages if needed): |  |  |\n| --- | --- | --- |\n| All Roof Inspection Form must be completed and signed by a verifiable Florida-licensed inspector. I certify that the above statements are true and correct. |  |  |\n| \u003Cbr>\u003Cbr>Company Name | Home Inspector\u003Cbr>Title\u003Cbr>Home Inspector\u003Cbr>License Type\u003Cbr>HI\\# 16040\u003Cbr>License Number\u003Cbr>904-758-9225\u003Cbr>Work Phone | 05/21/2025\u003Cbr>Date |\n\n\n| Photo Requirements |\n| --- |\n| Photos must accompany each Roof Inspection Form .The minimum photo requirements include:\u003Cbr> Roof: Each slope\u003Cbr> All hazards or deficiencies |\n\n\n| Documenting the Condition of Each System |\n| --- |\n| The Florida-licensed inspector is required to certify the condition of the roofing system.Acceptable Condition means that each system is working as intended and there are no visible hazards or deficiencies. |\n\n\n| Additional Comments or Observations |\n| --- |\n| This section of the Roof Inspection Form must be completed with full details/descriptions if any of the following are noted on the inspection:\u003Cbr> Updates: Identify the types of updates, dates completed and by whom\u003Cbr> Any visible hazards or deficiencies\u003Cbr> Any roof determined not to be in good working order |\n\n\n| Note to All Agents |\n| --- |\n| The writing agent must review each Roof Inspection Form before it is submitted with an application for coverage. It is the agent’s responsibility to ensure that all rules and requirements are met before the application is bound. Agents may not submit applications for properties with roof(s) not in good working order or with existing hazards/deficiencies. |\n\nHouseScan Inspections (INS) 05/21/2025  \nHouseScan Inspections (INS) Page 2 of 3  \nPhotos, Additional Comments or Observations  \nRoof  \nPhotos of Each Slope  \nPredominant Roof  \nSecondary Roof  \nHouseScan Inspections (INS) 05/21/2025  \nHouseScan Inspections (INS) Page 3 of 3","cbCaiviQ78vfUFEg","https://ap.wps.com/l/cbCaiviQ78vfUFEg","pdf",561894,"English","# Roof Inspection Form\n## Property, Policy, and Inspection Details\n## Roof Characteristics and Replacement Options\n## Damage, Deterioration, and Leak Indicators\n## Additional Comments, Certification, and Inspector Information\n## Photo Requirements","[{\"question\":\"What information is required at the top of the Roof Inspection Form?\",\"answer\":\"The form requires the insured/applicant name, the application/policy number, the inspected address, and the date inspected.\"},{\"question\":\"Which roof details must be recorded for the predominant and secondary roofs?\",\"answer\":\"It requires covering material, roof age, remaining useful life, dates of last roofing permit and last update, and whether updates are selected, including replacement type and overall condition.\"},{\"question\":\"What happens if damage, deterioration, or leaks are noted during inspection?\",\"answer\":\"The inspector must complete additional comments with full details and include explanations where required, especially for hazards/deficiencies or any visible signs of leaks and related observations.\"}]","Roof Inspection Form - Certification and Photo Requirements | PDF",1789270932]