[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-393445-105":3,"detail-sidebar-cat-1-en-105":80,"doc-detail-393445-en":126},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","romney-wind-energy-centre-construction-plan-report-status-d-final","Romney Wind Energy Centre Construction Plan Report - Status D - Final","","Construction Plan Report for the Romney Wind Energy Centre, prepared for Romney Energy Centre Limited Partnership. The document includes a DNV GL Energy Advisory Americas header and identifies document number 10021083-CAMO-R-04, issue status D/FINAL, and issue date 12 January 2018. It contains an important notice and disclaimer covering permitted use, confidentiality classification, copyright restrictions, and limits of liability. It further provides project and general information placeholders and a table of contents outlining preamble and general sections.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/presentations/","Presentations",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/romney-wind-energy-centre-construction-plan-report-status-d-final/393445/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/romney-wind-energy-centre-construction-plan-report-status-d-final/393445.png","ImageObject",442,249,{"name":42,"@type":43},"dhado","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-06","2026-09-26",true,{"@type":52,"interactionType":53,"userInteractionCount":22},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What is the document title and intended project?","Question",{"text":62,"@type":63},"The document is titled “Romney Wind Energy Centre Construction Plan Report” and concerns the Romney Wind Energy Centre project.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What do “Issue: D” and “Status: FINAL” mean in this document?",{"text":67,"@type":63},"The report lists “Issue: D” and “Status: FINAL,” indicating the specific issue letter and that this version is the final status.",{"name":69,"@type":60,"acceptedAnswer":70},"What key restrictions apply to the use and distribution of the document?",{"text":71,"@type":63},"The document includes an important notice and disclaimer stating it is for the customer only, protected by copyright, and distribution must follow the document classification and DNV GL’s written agreement.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},393445,1791264948,{"code":4,"msg":81,"data":82},"success",[83,87,92,97,102,107,112,117,122],{"id":84,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":85,"slug":86},11,90,"presentations",{"id":88,"doc_module":22,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},12,"Resumes",80,"resumes",{"id":93,"doc_module":22,"doc_module_name":25,"category_name":94,"show_sort_weight":95,"slug":96},14,"Invoices",70,"invoices",{"id":98,"doc_module":22,"doc_module_name":25,"category_name":99,"show_sort_weight":100,"slug":101},15,"Posters",60,"posters",{"id":103,"doc_module":22,"doc_module_name":25,"category_name":104,"show_sort_weight":105,"slug":106},16,"Social Media",50,"social-media",{"id":108,"doc_module":22,"doc_module_name":25,"category_name":109,"show_sort_weight":110,"slug":111},17,"Forms",40,"forms",{"id":113,"doc_module":22,"doc_module_name":25,"category_name":114,"show_sort_weight":115,"slug":116},18,"Letters",30,"letters",{"id":118,"doc_module":22,"doc_module_name":25,"category_name":119,"show_sort_weight":120,"slug":121},21,"Paper Templates",5,"papers-templates",{"id":123,"doc_module":22,"doc_module_name":25,"category_name":124,"show_sort_weight":4,"slug":125},158,"General","general-158",{"code":4,"msg":81,"data":127},{"doc_id":78,"user_id":128,"nickname":42,"user_avatar":129,"doc_module":22,"category_id":84,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":22,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":135,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":140,"read_time":141},5909893218464,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","ROMNEY WIND ENERGY CENTRE  \nConstruction Plan Report  \nRomney Energy Centre Limited Partnership  \nDocument No.: 10021083-CAMO-R-04  \nIssue: D Status: FINAL  \nDate: 12 January 2018  \nIMPORTANT NOTICE AND DISCLAIMER  \n1. This document is intended for the sole use of the Customer as detailed on the front page of this document to whom the document is addressed and who has entered into a written agreement with the DNV GL entity issuing this document (“DNV GL”) . To the extent permitted by law, neither DNV GL nor any group company (the \"Group\") assumes any responsibility whether in contract, tort including without limitation negligence, or otherwise howsoever, to third parties (being persons other than the Customer), and no company in the Group other than DNV GL shall be liable for any loss or damage whatsoever suffered by virtue of any act, omission or default (whether arising by negligence or otherwise) by DNV GL, the Group or any of its or their servants, subcontractors or agents. This document must be read in its entirety and is subject to any assumptions and qualifications expressed therein as well as in any other relevant communications in connection with it. This document may contain detailed technical data which is intended for use only by persons possessing requisite expertise in its subject matter.  \n2. This document is protected by copyright and may only be reproduced and circulated in accordance with the Document Classification and associated conditions stipulated or referred to in this document and/or in DNV GL’s written agreement with the Customer. No part of this document may be disclosed in any public offering memorandum, prospectus or stock exchange listing, circular or announcement without the express and prior written consent of DNV GL. A Document Classification permitting the Customer to redistribute this document shall not thereby imply that DNV GL has any liability to any recipient other than the Customer.  \n3. This document has been produced from information relating to dates and periods referred to in this document. This document does not imply that any information is not subject to change. Except and to the extent that checking or verification of information or data is expressly agreed within the written scope of its services, DNV GL shall not be responsible in any way in connection with erroneous information or data provided to it by the Customer or any third party, or for the effects of any such erroneous information or data whether or not contained or referred to in this document.  \n4. Any energy forecasts estimates or predictions are subject to factors not all of which are within the scope of the probability and uncertainties contained or referred to in this document and nothing in this document guarantees any particular energy output, including factors such as wind speed or irradiance.  \nKEY TO DOCUMENT CLASSIFICATION  \nFor disclosure only to named individuals within the Customer’s  \nStrictly Confidential : organization.  \nFor disclosure only to individuals directly concerned with the  \nPrivate and Confidential : subject matter of the document within the Customer’s  \norganization.  \nCommercial in Confidence : Not to be disclosed outside the Customer’s organization.  \nDNV GL only : Not to be disclosed to non-DNV GL staff  \nDistribution for information only at the discretion of the  \nCustomer (subject to the above Important Notice and  \nCustomer’s Discretion : Disclaimer and the terms of DNV GL’s written agreement with  \nthe Customer) .  \nAvailable for information only to the general public (subject to  \nPublished : the above Important Notice and Disclaimer) .  \nProject name: Report title:  \nCustomer:  \nContact person: Date of issue:  \nProject No.:  \nDocument No.: Issue/Status  \nRomney Wind Energy Centre Construction Plan Report  \nRomney Energy Centre Limited Partnership 53 Jarvis St  \nSuite 300  \nToronto, ON, M5C 2H2  \nMark Gallagher  \n12 January 2018 10021083 10021083-CAMO-R-04  \nD/FINAL  \nDNV GL-Energy","cbCaidtPcirR04VS","https://ap.wps.com/l/cbCaidtPcirR04VS","pdf",23923305,106,"English","# Table of contents\n## 1 PREAMBLE\n## 2 GENERAL INFORMATION\n### 2.1 Project Name and Project Proponent\n### 2.2 Location of Project\n### 2.3 Description of the Energy Source, Nameplate Capacity, and Class of Facility\n### 2.4 Contact Information","[{\"question\":\"What is the document title and intended project?\",\"answer\":\"The document is titled “Romney Wind Energy Centre Construction Plan Report” and concerns the Romney Wind Energy Centre project.\"},{\"question\":\"What do “Issue: D” and “Status: FINAL” mean in this document?\",\"answer\":\"The report lists “Issue: D” and “Status: FINAL,” indicating the specific issue letter and that this version is the final status.\"},{\"question\":\"What key restrictions apply to the use and distribution of the document?\",\"answer\":\"The document includes an important notice and disclaimer stating it is for the customer only, protected by copyright, and distribution must follow the document classification and DNV GL’s written agreement.\"}]","Romney Wind Energy Centre Construction Plan Report - Status D - Final | PDF",1790386491,37]