[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-176941-105":53,"doc-detail-176941-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","roadworks-specifications-table-of-contents-november-2025","Roadworks Specifications - Table of Contents - November 2025","","Roadworks Specifications for November 2025 provides a structured index of OPSS roadwork items, organized by series (100-, 200-, 300-series) and individual contract works. The table of contents lists excavation, disposal, site preparation, drainage/ditching, vegetation management, asphalt mix-related tasks, pavement repairs, and provisional or new construction renewals. Entries include item codes (e.g., R101-R323) covering materials handling, asphalt removal/replacement, stabilizing systems, and sealing or crack treatment activities with corresponding page references.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/roadworks-specifications-table-of-contents-november-2025/176941/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/roadworks-specifications-table-of-contents-november-2025/176941.png","ImageObject",442,249,{"name":88,"@type":89},"Sarah ","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-19","2026-09-02",true,{"@type":98,"interactionType":99,"userInteractionCount":15},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What document structure does the table of contents use?","Question",{"text":108,"@type":109},"It groups works under OPSS series (100-, 200-, 300-series) and then lists specific item codes such as R101, R102, and R201, each with a work description and page reference.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What types of roadworks are covered in this table of contents?",{"text":113,"@type":109},"The listed items cover excavation and disposal, site and earth works, vegetation/tree-related activities, and multiple categories of asphalt and pavement maintenance including repairs, seals, and crack treatments.",{"name":115,"@type":106,"acceptedAnswer":116},"How are renewal and new construction works indicated?",{"text":117,"@type":109},"Each item name includes brackets such as [Renewal] or [New Construction], and some entries also state [Provisional], showing the intended contract status for the work item.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},176941,1791719505,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":15,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":141},962085320529,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","Roadworks Specifications \u0005\nTable of Contents\n\u0013 TOC \\h \\z \\u \\t \"Heading 2,1,Heading 3,2,Heading 4 + (Latin) Arial,3,TRN Spec Heading 1,1\" \u0014\u0013 HYPERLINK \\l \"_Toc214263959\" \u0014OPSS 100-SERIES\t\u0013 PAGEREF _Toc214263959 \\h \u001412\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263960\" \u0014Item R101\tDisposal of Excavated Ditch Material [Renewal]\t\u0013 PAGEREF _Toc214263960 \\h \u001412\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263961\" \u0014Item R102\tRemoval and Disposal of Winter Sand [Renewal]\t\u0013 PAGEREF _Toc214263961 \\h \u001412\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263962\" \u0014Item R103\tDisposal of Asbestos-Containing Material Asphalt [Renewal]\t\u0013 PAGEREF _Toc214263962 \\h \u001413\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263963\" \u0014OPSS 200-SERIES\t\u0013 PAGEREF _Toc214263963 \\h \u001414\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263964\" \u0014Item R201\tRoadway Ditching – Terra Seeds [Renewal]\t\u0013 PAGEREF _Toc214263964 \\h \u001414\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263965\" \u0014Item R202\tClearing and Grubbing [New Construction]\t\u0013 PAGEREF _Toc214263965 \\h \u001414\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263966\" \u0014Item R203\tRemoval of Single Trees [New Construction]\t\u0013 PAGEREF _Toc214263966 \\h \u001417\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263967\" \u0014Item R204\tEarth Excavation, Grading [Renewal / New Construction]\t\u0013 PAGEREF _Toc214263967 \\h \u001419\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263968\" \u0014Item R205\tEarth Borrow [Renewal / New Construction]\t\u0013 PAGEREF _Toc214263968 \\h \u001420\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263969\" \u0014Item R206\tUnsuitable Material Removal, Disposal and Backfill (Provisional) [New Construction]\t\u0013 PAGEREF _Toc214263969 \\h \u001421\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263970\" \u0014Item R207\tImpacted Material Removal, Disposal and Backfill (Provisional) [New Construction]\t\u0013 PAGEREF _Toc214263970 \\h \u001422\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263971\" \u0014Item R208\tGeogrid for Sub-Excavation Locations (Provisional) [New Construction]\t\u0013 PAGEREF _Toc214263971 \\h \u001424\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263972\" \u0014Item R209\tGeotextile for Sub-Excavation Locations (Provisional) [New Construction]\t\u0013 PAGEREF _Toc214263972 \\h \u001424\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263973\" \u0014Item R210\tEarth Excavation and Preparation for Boulevard Soil Trench [New Construction]\t\u0013 PAGEREF _Toc214263973 \\h \u001424\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263974\" \u0014Item R211\tPruning of Trees and Woody Vegetation (Cash Allowance) [Renewal / New Construction]\t\t\u0013 PAGEREF _Toc214263974 \\h \u001425\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263975\" \u0014Item R212\tTree Root Exploratory Excavation by Hydro-Vac (Provisional) [Renewal / New Construction]\t\t\u0013 PAGEREF _Toc214263975 \\h \u001426\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263976\" \u0014Item R213\tServices of Qualified Tree Professional (Cash Allowance) [Renewal / New Construction]\t\t\t\u0013 PAGEREF _Toc214263976 \\h \u001427\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263977\" \u0014OPSS 300-SERIES\t\u0013 PAGEREF _Toc214263977 \\h \u001429\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263978\" \u0014Item R300\tPlant Produced Trial Batches for Asphalt Mix Design Approval [Renewal / New Construction]\t\t\u0013 PAGEREF _Toc214263978 \\h \u001429\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263979\" \u0014Item R301\tSuperpave, Binder Course, Warm Mix Asphalt [Renewal / New Construction]\t\u0013 PAGEREF _Toc214263979 \\h \u001429\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263980\" \u0014Item R302\tSuperpave, Surface Course, Warm Mix Asphalt [Renewal / New Construction]\t\u0013 PAGEREF _Toc214263980 \\h \u001429\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263981\" \u0014Item R303\tRemove and Replace Miscellaneous Superpave Hot Mix Asphalt [Renewal]\t\u0013 PAGEREF _Toc214263981 \\h \u001450\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263982\" \u0014Item R304\tRemove and Replace Asphalt Curb and Gutter [Renewal]\t\u0013 PAGEREF _Toc214263982 \\h \u001450\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263983\" \u0014Item R305\tSuperpave, Surface Course, Hot Mix Asphalt [Renewal]\t\u0013 PAGEREF _Toc214263983 \\h \u001451\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263984\" \u0014Item R306\tRemove and Replace Miscellaneous Superpave Hot Mix Asphalt [Renewal]\t\u0013 PAGEREF _Toc214263984 \\h \u001451\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263985\" \u0014Item R307\tRemove and Replace Hot Mix Asphalt HL-3HS Surface Course and HL-8 Binder Course [Renewal]\t\t\t\u0013 PAGEREF _Toc214263985 \\h \u001454\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263986\" \u0014Item R308\tRemove and Replace Miscellaneous Hot Mix Asphalt HL-3 [Renewal]\t\u0013 PAGEREF _Toc214263986 \\h \u001454\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc214263987\" \u0014Item R309\t50 mm Superpave 12.5 Surface Course, PGAC","cbCairLLrarXWDR2","https://ap.wps.com/l/cbCairLLrarXWDR2","docx",372768,180,"English","# OPSS 100-SERIES\n## Item R101 - Disposal of Excavated Ditch Material [Renewal]\n## Item R102 - Removal and Disposal of Winter Sand [Renewal]\n## Item R103 - Disposal of Asbestos-Containing Material Asphalt [Renewal]\n# OPSS 200-SERIES\n## Item R201 - Roadway Ditching – Terra Seeds [Renewal]\n## Item R202 - Clearing and Grubbing [New Construction]\n## Item R204 - Earth Excavation, Grading [Renewal / New Construction]","[{\"question\":\"What document structure does the table of contents use?\",\"answer\":\"It groups works under OPSS series (100-, 200-, 300-series) and then lists specific item codes such as R101, R102, and R201, each with a work description and page reference.\"},{\"question\":\"What types of roadworks are covered in this table of contents?\",\"answer\":\"The listed items cover excavation and disposal, site and earth works, vegetation/tree-related activities, and multiple categories of asphalt and pavement maintenance including repairs, seals, and crack treatments.\"},{\"question\":\"How are renewal and new construction works indicated?\",\"answer\":\"Each item name includes brackets such as [Renewal] or [New Construction], and some entries also state [Provisional], showing the intended contract status for the work item.\"}]","Roadworks Specifications - Table of Contents - November 2025 | DOCX",1788326225,63]