[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-172873-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-172873-en":127},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","risk-mitigation-plan-section-10-purpose-of-the-risk-mitigation-plan-oac-3745-300-11g1a","Risk Mitigation Plan - Section 1.0 - Purpose of the Risk Mitigation Plan (OAC 3745-300-11(G)(1)(a))","","Template content for drafting a Risk Mitigation Plan (RMP) under Ohio’s Voluntary Action Program when required by OAC 3745-300-11, and for inclusion in the NFA letter issued for the property. The plan’s purpose is to outline measures that mitigate or eliminate human exposure to contamination from construction activities, including excavation below the point of compliance, both during work and after completion. It specifies protection objectives for construction workers, non-construction workers during construction through site controls, and non-construction workers after completion via soil management and restoration. It also notes preparation under OAC 3745-300-11 and that it is not intended to satisfy other applicable legal requirements, with instructions to remove bracketed or parenthesized drafting examples.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/forms/","Forms",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/risk-mitigation-plan-section-10-purpose-of-the-risk-mitigation-plan-oac-3745-300-11g1a/172873/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/risk-mitigation-plan-section-10-purpose-of-the-risk-mitigation-plan-oac-3745-300-11g1a/172873.png","ImageObject",442,249,{"name":42,"@type":43},"Mia  ","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-22","2026-09-01",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",8,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the purpose of the Risk Mitigation Plan (RMP) under Ohio’s VAP?","Question",{"text":63,"@type":64},"The RMP defines risk mitigation measures that mitigate or eliminate human exposure to contamination caused by construction activities. It addresses exposure concerns both during construction (including excavation below the point of compliance) and after construction completion.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"How does the RMP protect construction workers versus non-construction workers?",{"text":68,"@type":64},"It includes measures to protect construction workers from contamination that exceeds applicable construction-activity standards, and measures to protect non-construction workers through site control during construction. After completion, it focuses on protecting non-construction workers through proper soil management and restoration of clean soils within the point of compliance.",{"name":70,"@type":61,"acceptedAnswer":71},"What regulatory basis governs preparation and what limitations apply?",{"text":72,"@type":64},"The RMP is prepared in accordance with Ohio Administrative Code rule 3745-300-11 and is intended to support compliance with VAP standards applicable to construction activities. It is not intended to fulfill requirements of other laws that may apply to construction or excavation activities.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},172873,1790455999,{"code":4,"msg":82,"data":83},"success",[84,89,94,99,104,109,113,118,123],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":86,"show_sort_weight":87,"slug":88},11,"Presentations",90,"presentations",{"id":90,"doc_module":22,"doc_module_name":25,"category_name":91,"show_sort_weight":92,"slug":93},12,"Resumes",80,"resumes",{"id":95,"doc_module":22,"doc_module_name":25,"category_name":96,"show_sort_weight":97,"slug":98},14,"Invoices",70,"invoices",{"id":100,"doc_module":22,"doc_module_name":25,"category_name":101,"show_sort_weight":102,"slug":103},15,"Posters",60,"posters",{"id":105,"doc_module":22,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},16,"Social Media",50,"social-media",{"id":110,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":111,"slug":112},17,40,"forms",{"id":114,"doc_module":22,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},18,"Letters",30,"letters",{"id":119,"doc_module":22,"doc_module_name":25,"category_name":120,"show_sort_weight":121,"slug":122},21,"Paper Templates",5,"papers-templates",{"id":124,"doc_module":22,"doc_module_name":25,"category_name":125,"show_sort_weight":4,"slug":126},158,"General","general-158",{"code":4,"msg":82,"data":128},{"doc_id":79,"user_id":129,"nickname":42,"user_avatar":130,"doc_module":22,"category_id":110,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":55,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":140,"read_time":30},687207024478,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","***REMOVE THIS INSTRUCTION PARAGRAPH PRIOR TO SUBMITTAL***\nThe following template provides a format for drafting a risk mitigation plan under Ohio’s Voluntary Action Program when one is required by OAC 3745-300-11. The NFA letter that is issued for the property would include the risk mitigation plan, as required by OAC 3745-300-13(E)(12). This template contains sections based on the minimum plan components described by OAC 3745-300-11(G)(1). Each section of the risk mitigation plan should, at a minimum, provide the information indicated below, as outlined in OAC 3745-300-11(G). No sections should be omitted. Please indicate when relevant information is not applicable for a certain section. The risk mitigation plan should be updated and resubmitted under an addendum to the NFA letter when responding to Ohio EPA NFA letter review comments. Fill in all [bracketed] text with the corresponding property-specific information, and remove the brackets prior to submittal. Remove all parenthesized and italicized instructional or bracketed example text prior to submittal.\n***REMOVE THIS INSTRUCTION PARAGRAPH PRIOR TO SUBMITTAL***\nRisk Mitigation Plan\nfor the\n[Property Name] Property\n[Property Street Address]\n[Property City], [Property County], Ohio [Zip Code]\n[Volunteer(s) Name(s)], Volunteer\n[Volunteer(s) Address(es)]\n[Property Owner(s) Name(s)], Property Owner\n[Property Owner(s) Address(es)] (If different from Volunteer, otherwise delete and specify above that the Volunteer is also the property owner)\nNFA Letter Issued by: VAP Certified Professional [CP Name], [CP Number] with\n[CP Firm/Company], [Address of CP Firm/Company address], [CP Work Phone Number]\n[Date of RMP] (Add additional dates as needed)\nTable of Contents\n\u0003Section                                                                                                        Page Number\n\u0013 TOC \\o \"1-3\" \\h \\z \\u \u0014\u0013 HYPERLINK \\l \"_Toc328387000\" \u0014Section 1.0    Purpose of the Risk Mitigation Plan\t\u0013 PAGEREF _Toc328387000 \\h \u00143\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc328387001\" \u0014Section 2.0    Implementing the Risk Mitigation Plan\t\u0013 PAGEREF _Toc328387001 \\h \u00144\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc328387002\" \u0014Section 3.0    Potential Health Risks\t\u0013 PAGEREF _Toc328387002 \\h \u00144\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc328387003\" \u0014Section 4.0    Precautions Against Exposures\t\u0013 PAGEREF _Toc328387003 \\h \u00145\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc328387004\" \u0014Section 5.0    Actions to Take if Significant Exposures Occur\t\u0013 PAGEREF _Toc328387004 \\h \u00146\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc328387005\" \u0014Section 6.0    Handling Contaminated Environmental Media\t\u0013 PAGEREF _Toc328387005 \\h \u00146\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc328387006\" \u0014Section 7.0    Notice to Contractors and Workers\t\u0013 PAGEREF _Toc328387006 \\h \u00147\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc328387007\" \u0014Section 8.0    Annual Notification to Ohio EPA\t\u0013 PAGEREF _Toc328387007 \\h \u00148\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc328387008\" \u0014Section 9.0    Termination Criteria\t\u0013 PAGEREF _Toc328387008 \\h \u00148\u0015\u0015\n\u0015\u0004\nList of Figures\nProperty Map (depicting portions of property subject to RMP as required by OAC 3745-300-11(G)(1)(g))\n(Additional figures as needed)\nList of Appendices (If applicable, otherwise delete from table of contents)\nSection 1.0 – Purpose of the Risk Mitigation Plan (OAC 3745-300-11(G)(1)(a))\nThe purpose of this risk mitigation plan (RMP) is to provide the risk mitigation measures that mitigate or eliminate human exposure to contamination as a result of construction activities. Construction activities include any excavation activities below the point of compliance (e.g., two feet below ground surface).  Concerns for potential exposure to contaminated soil includes both during the construction activities and after completion of the construction activities. Therefore, the RMP has three main purposes:\nRisk mitigation measures to protect construction workers from contamination that exceed applicable standards for construction activities.\nRisk mitigation measures to protect non-construction workers from exposure to contamination during the construction activities, which can be","cbCaiq4mFwDebfUK","https://ap.wps.com/l/cbCaiq4mFwDebfUK","docx",38282,"English","# Section 1.0 – Purpose of the Risk Mitigation Plan (OAC 3745-300-11(G)(1)(a))\n# Section 2.0 – Implementing the Risk Mitigation Plan (OAC 3745-300-11(G)(1)(e) and (f))\n# Section 3.0 – Potential Health Risks\n# Section 4.0 – Precautions Against Exposures\n# Section 5.0 – Actions to Take if Significant Exposures Occur\n# Section 6.0 – Handling Contaminated Environmental Media\n# Section 7.0 – Notice to Contractors and Workers\n# Section 8.0 – Annual Notification to Ohio EPA\n# Section 9.0 – Termination Criteria","[{\"question\":\"What is the purpose of the Risk Mitigation Plan (RMP) under Ohio’s VAP?\",\"answer\":\"The RMP defines risk mitigation measures that mitigate or eliminate human exposure to contamination caused by construction activities. It addresses exposure concerns both during construction (including excavation below the point of compliance) and after construction completion.\"},{\"question\":\"How does the RMP protect construction workers versus non-construction workers?\",\"answer\":\"It includes measures to protect construction workers from contamination that exceeds applicable construction-activity standards, and measures to protect non-construction workers through site control during construction. After completion, it focuses on protecting non-construction workers through proper soil management and restoration of clean soils within the point of compliance.\"},{\"question\":\"What regulatory basis governs preparation and what limitations apply?\",\"answer\":\"The RMP is prepared in accordance with Ohio Administrative Code rule 3745-300-11 and is intended to support compliance with VAP standards applicable to construction activities. It is not intended to fulfill requirements of other laws that may apply to construction or excavation activities.\"}]","Risk Mitigation Plan - Section 1.0 - Purpose of the Risk Mitigation Plan (OAC 3745-300-11(G)(1)(a)) | DOCX",1788297314]