[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-174148-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-174148-en":127},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","revisions","Revisions","","Revisions outlines updates to the World Bank’s Standard Procurement Document for Request for Proposals covering Works under a Design and Build single-stage process after initial selection. It specifies changes such as removing UNDB online references, adding guidance for signage when the contractor takes possession of the site, and mandating weightings for rated bid evaluation criteria. It also introduces provisions for handling cyber security risks and includes options for bidders to notify the Bank of procurement-related complaints, alongside beneficial ownership disclosure requirements.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/presentations/","Presentations",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/revisions/174148/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/revisions/174148.png","ImageObject",442,249,{"name":42,"@type":43},"Riley West","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-19","2026-09-02",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",8,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What key changes are included in the March 2025 revision?","Question",{"text":63,"@type":64},"The March 2025 revision removes the UNDB online reference, adds signage guidance when the contractor takes possession of the site, requires mandatory weightings for rated criteria, and provides a Bank email option for procurement-related complaints addressed to the borrower.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"How does the document handle Beneficial Ownership Disclosure?",{"text":68,"@type":64},"It requires the successful proposer to submit the Beneficial Ownership Disclosure Form in accordance with the RFP requirements.",{"name":70,"@type":61,"acceptedAnswer":71},"What cyber security-related updates are included?",{"text":72,"@type":64},"The revisions add provisions to manage cyber security risks and address applying for contracts assessed to present potential or actual cyber security risks.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},174148,1788310650,{"code":4,"msg":82,"data":83},"success",[84,88,93,98,103,108,113,118,123],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":86,"slug":87},11,90,"presentations",{"id":89,"doc_module":22,"doc_module_name":25,"category_name":90,"show_sort_weight":91,"slug":92},12,"Resumes",80,"resumes",{"id":94,"doc_module":22,"doc_module_name":25,"category_name":95,"show_sort_weight":96,"slug":97},14,"Invoices",70,"invoices",{"id":99,"doc_module":22,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},15,"Posters",60,"posters",{"id":104,"doc_module":22,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},16,"Social Media",50,"social-media",{"id":109,"doc_module":22,"doc_module_name":25,"category_name":110,"show_sort_weight":111,"slug":112},17,"Forms",40,"forms",{"id":114,"doc_module":22,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},18,"Letters",30,"letters",{"id":119,"doc_module":22,"doc_module_name":25,"category_name":120,"show_sort_weight":121,"slug":122},21,"Paper Templates",5,"papers-templates",{"id":124,"doc_module":22,"doc_module_name":25,"category_name":125,"show_sort_weight":4,"slug":126},158,"General","general-158",{"code":4,"msg":82,"data":128},{"doc_id":79,"user_id":129,"nickname":42,"user_avatar":130,"doc_module":22,"category_id":85,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":136,"language":137,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":12,"update_tm":80,"read_time":141},1099523885074,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","STANDARD PROCUREMENT DOCUMENT\nRequest for Proposals\nWorks\nDesign and Build\n(Single-Stage Request for Proposals, after Initial Selection)\n(where the Bank’s Disqualification mechanism for non-compliance with SEA/SH obligations applies)\nMarch 2025\nThis document is subject to copyright.\nThis document may be used and reproduced for non-commercial purposes only. Any commercial use, including without limitation reselling, charging to access, redistribute, or for derivative works such as unofficial translations based on this document is not allowed.\nRevisions\nMarch 2025\nThis revision deletes the reference to UNDB online and adds a new provision in relation to signage when the Contractor takes possession of the Site. This revision also requires the application of mandatory weightings for Rated Criteria for bid evaluation purposes and includes the addition of a Bank email address providing an option to Bidders to inform the Bank about a procurement-related complaint addressed to the Borrower.\nJuly 2023\nThis revision consolidates what was in separate SPDs i.e., pre-ESF and ESF respectively, with relevant parts marked to guide application.\nThis SPD requires that the successful proposer shall submit the Beneficial Ownership Disclosure Form in accordance with the requirements of the RFP.\nThis revision includes provisions to manage cyber security risks, to apply for contracts that have been assessed to present potential or actual cyber security risks.\nThis SPD has considered the 2022 reprint with amendments  of the “General Conditions” which form part of the “Conditions of Contract for Plant & Design-Build for Electrical & Mechanical Plant & for Building & Engineering Works Designed by the Contractor (“Yellow book”) Second edition 2017”, published by the Federation Internationale Des Ingenieurs – Conseils (FIDIC).\nJanuary 2021\nThis revision incorporates provisions on disqualification of contractors, and their proposed subcontractor/s as applicable, from being awarded Bank financed contracts. The provisions on disqualification for procurement of Works using this SPD apply to contracts under Projects assessed as high risk for Sexual Exploitation and Abuse (SEA) and/or Sexual Harassment (SH).\nDecember 2019\nSEA (Sexual Exploitation and Assault) has been replaced with SEA (Sexual Exploitation and Abuse) and SH (Sexual Harassment) as appropriate. Editorial enhancements have also been made.\n\u000f\nPreface\nThis Standard Procurement Document (SPD) Request for Proposals (RFPs) for Works \u000b(Design and Build) has been prepared by the World Bank (Bank).\nThis SPD is applicable to the procurement of Works (Design and Build) funded by IBRD or IDA financed projects whose Legal Agreement makes reference to the Procurement Regulations for IPF Borrowers. This SPD shall be used for international competitive procurement, after Initial Selection, for a single stage Request for Proposals (RFP) selection method. If as result of the Project Procurement Strategy for Development (PPSD), a two-stage process would be more appropriate, then the corresponding SPD for a two-stage process should be applied. Both SPDs assume that an initial selection has been carried out, which should normally be the case for an RFP selection method. If the PPSD for justified reasons  has not identified the need for initial selection, then the relevant provisions of these SPDs should be modified accordingly. A separate Standard Initial Selection Document for Design and Build has been issued together with this SPD.\nThis revision consolidates what was in separate SPDs i.e., pre-ESF and ESF respectively, with relevant parts marked to guide application.\nThe SPD includes mandatory requirements that the successful proposer shall submit the Beneficial Ownership Disclosure Form in accordance with the requirements of the RFP.\nFurther, this revision includes provisions to manage cyber security risks, to apply for contracts that have been assessed to present potential or actual cyber security risks.\nThis SPD ","cbCailvfqe0u75Pk","https://ap.wps.com/l/cbCailvfqe0u75Pk","docx",463944,237,"English","# Revisions\n## March 2025 updates\n## July 2023 consolidation\n## January 2021 disqualification and cyber security provisions\n## December 2019 editorial changes\n## Preface scope and applicability","[{\"question\":\"What key changes are included in the March 2025 revision?\",\"answer\":\"The March 2025 revision removes the UNDB online reference, adds signage guidance when the contractor takes possession of the site, requires mandatory weightings for rated criteria, and provides a Bank email option for procurement-related complaints addressed to the borrower.\"},{\"question\":\"How does the document handle Beneficial Ownership Disclosure?\",\"answer\":\"It requires the successful proposer to submit the Beneficial Ownership Disclosure Form in accordance with the RFP requirements.\"},{\"question\":\"What cyber security-related updates are included?\",\"answer\":\"The revisions add provisions to manage cyber security risks and address applying for contracts assessed to present potential or actual cyber security risks.\"}]","Revisions | DOCX",83]