[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-243648-105":53,"doc-detail-243648-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","request-for-information-form","Request for Information Form","","This document is a Request for Information (RFI) Form used by the Toronto Transit Commission (TTC), Engineering, Construction and Expansion department. It is designed for general contractors to formally request information or clarification regarding contract documents. The form is divided into two steps: Step 1 is to be completed by the General Contractor, requiring details such as contract number, name, subject, date requested, and the specific nature of the information sought. It also prompts for reference documents and an optional proposed resolution. Step 2 is to be completed by the TTC, where they provide their response to the RFI, including the name and position of the replier and the date of reply. The form includes options to indicate if the information is not shown on contract documents, requires clarification, involves a conflict, or relates to site conditions, among other possibilities. The form's revision information is also present: Form 81-01-001, dated April 2015, Revision 01. This RFI form serves as a structured communication tool to ensure clarity and address potential issues or ambiguities during construction projects managed by the TTC.",{"@graph":63,"@context":122},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/request-for-information-form/243648/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/request-for-information-form/243648.png","ImageObject",442,249,{"name":88,"@type":89},"Eliana","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-07","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":73},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114,118],{"name":105,"@type":106,"acceptedAnswer":107},"What is the purpose of this Request for Information (RFI) Form?","Question",{"text":108,"@type":109},"The RFI Form is used by the Toronto Transit Commission (TTC) for general contractors to formally request information, clarification, or interpretation regarding contract documents during construction projects.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What information does the General Contractor need to provide in Step 1?",{"text":113,"@type":109},"In Step 1, the General Contractor must provide contract details, the subject of the inquiry, date requested, response deadline, reference documents (like contract drawings or specifications), a description of the RFI, and an optional proposed resolution.",{"name":115,"@type":106,"acceptedAnswer":116},"What details are included in Step 2 for the TTC's response?",{"text":117,"@type":109},"Step 2 is for the TTC to complete, requiring them to provide their response to the RFI, the name and position of the person who replied, and the date of the reply.",{"name":119,"@type":106,"acceptedAnswer":120},"What are the common reasons for issuing an RFI as indicated on the form?",{"text":121,"@type":109},"The form indicates that RFIs can be issued for information not shown on contract documents, to seek clarification or interpretation of contract documents, to address conflicts in contract documents, or due to site conditions, among other reasons.","https://schema.org",{"og:url":78,"og:type":124,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":126,"canonical":78},"index,follow",{"doc_id":128,"site_id":56},243648,1791379089,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":88,"user_avatar":133,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":139,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":140,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":61,"update_tm":144,"read_time":4},4398048949847,"https://ap-avatar.wpscdn.com/avatar/400002536579ef2da7f?_k=1778318612642679267","Toronto Transit Commission  \nEngineering, Construction and Expansion  \n\n| Request for Information (RFI) Form |  |  |  | RFI No. |  |  | Rev. |  | Total pages |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| Step 1 (General Contractor to complete): Contract & Information Requested |  |  |  |  |  |  |  |  |  |  |\n| Contract Number |  | Contract Name |  |  |  |  |  |  |  |  |\n| Subject: |  |  |  |  |  |  |  |  |  |  |\n| Date Requested |  |  | Request Response by\u003Cbr>(Allow reasonable timeframe for TTC to review and respond) |  |  |  |  |  |  |  |\n| Reference Documents (relevant portions attached)\u003Cbr>Contract Drawing \\#:\u003Cbr>Shop Drawing \\#:\u003Cbr>Specification Section / Clause: |  |  |  |  |  |  |  |  |  |  |\n| Description of RFI  See attached (if required) |  |  |  |  |  |  |  |  |  |  |\n| Proposed Resolution (If any) |  |  |  |  |  Information not shown on Contract Documents  Clarification / Interpretation of Contract Documents  Conflict in Contract Documents / Requirements  Site Conditions\u003Cbr> Other:   |  |  |  |  |  |\n| Requested by (Name & Position) |  |  |  |  | Company Name |  |  |  |  |  |\n\n\n| Step 2 (TTC to complete) |  |  |  |\n| --- | --- | --- | --- |\n| Response to RFI  See attached (if required) |  |  |  |\n| Replied by (Name & Position) | Date Replied | | Unjustified\u003Cbr>Incomplete |\n\nRequest for Information, Form 81-01-001, Apr. 2015, Rev. 01","cbCaitI02WndRyp0","https://ap.wps.com/l/cbCaitI02WndRyp0","pdf",99688,8,"English","# Step 1 (General Contractor to complete): Contract & Information Requested\n## Step 2 (TTC to complete)","[{\"question\":\"What is the purpose of this Request for Information (RFI) Form?\",\"answer\":\"The RFI Form is used by the Toronto Transit Commission (TTC) for general contractors to formally request information, clarification, or interpretation regarding contract documents during construction projects.\"},{\"question\":\"What information does the General Contractor need to provide in Step 1?\",\"answer\":\"In Step 1, the General Contractor must provide contract details, the subject of the inquiry, date requested, response deadline, reference documents (like contract drawings or specifications), a description of the RFI, and an optional proposed resolution.\"},{\"question\":\"What details are included in Step 2 for the TTC's response?\",\"answer\":\"Step 2 is for the TTC to complete, requiring them to provide their response to the RFI, the name and position of the person who replied, and the date of the reply.\"},{\"question\":\"What are the common reasons for issuing an RFI as indicated on the form?\",\"answer\":\"The form indicates that RFIs can be issued for information not shown on contract documents, to seek clarification or interpretation of contract documents, to address conflicts in contract documents, or due to site conditions, among other reasons.\"}]","Request for Information Form | PDF",1789206733]