[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-303202-105":53,"doc-detail-303202-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","r-1092-219-quality-jobs-project-facility-expense-rebate-claim-louisiana","R-1092 (2/19) - Quality Jobs Project Facility Expense Rebate Claim - Louisiana","","Quality Jobs Project Facility Expense Rebate Claim form R-1092 (2/19) for Louisiana, collecting taxpayer and project identifiers, claim date, business legal and trade names, addresses, project contract number, and completion dates. It calculates refundable rebate by using total qualified expenditures from five-year schedules and applying an applicable percentage factor. The form includes instructions on filing only after the Board of Commerce and Industry signs the project completion report, plus a compliance declaration regarding minimum job and payroll requirements and an officer signature section.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/r-1092-219-quality-jobs-project-facility-expense-rebate-claim-louisiana/303202/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/r-1092-219-quality-jobs-project-facility-expense-rebate-claim-louisiana/303202.png","ImageObject",442,249,{"name":88,"@type":89},"Elsa","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-05","2026-09-19",true,{"@type":98,"interactionType":99,"userInteractionCount":73},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"When can the rebate claim be filed?","Question",{"text":108,"@type":109},"The claim may be filed only after the project completion report is signed by the Board of Commerce and Industry.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"How is the refundable project facility expense rebate calculated?",{"text":113,"@type":109},"Multiply Line 5 by Line 6 (applicable percentage). The resulting amount will be reduced by rebates previously issued.",{"name":115,"@type":106,"acceptedAnswer":116},"What information must be completed on page 2?",{"text":117,"@type":109},"Complete page 2 with total qualified expenditures for each year, add totals for lines 1–7, and attach supporting schedules and copies of the fully executed Project Completion Report and Quality Jobs contract.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},303202,1791170938,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":76,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":73,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":9},137455077381,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","R-1092 (2/19)  \n\n| \u003Cbr>| Quality Jobs Project Facility Expense Rebate Claim\u003Cbr>Louisiana Revised Statute 51:2456(B)(1)(b) | Mail both pages to:\u003Cbr>Taxpayer Compliance Division – SSEW Economic Development Unit\u003Cbr>P. O. Box 66362\u003Cbr>Baton Rouge, LA 70896-6362\u003Cbr>Phone: 225.219.2270\u003Cbr>Email: [LDR. TaxIncentives@LA.gov](LDR. TaxIncentives@LA.gov)  |\n| --- | --- | --- |\n\nDate of Claim (mm/dd/yyyy)  \nPLEASE PRINT OR TYPE  \n\n| LA Revenue Account Number |  |  | Project Contract No. |  |  |\n| --- | --- | --- | --- | --- | --- |\n| Legal Name of Business |  |  | Trade Name of Business |  |  |\n| Mailing Address |  |  | Project Location Address |  |  |\n| City | State | ZIP | City | State | ZIP |\n| Project Completion Date (Date Indicated on Project Completion Report) |  |  | Date Project Completion Report Signed by Board of Commerce and Industry |  |  |\n\n\n| Total Qualified Expenditures From Page 2 |  |  |  |\n| --- | --- | --- | --- |\n| 1 | Amounts from total column line 1, page 2 | 1 |  |\n| 2 | PLUS: Amounts from total column line 2, page 2 | 2 |  |\n| 3 | LESS: Amounts from total column line 3, page 2 | 3 |  |\n| 4 | PLUS: Amounts from total column line 4, page 2 | 4 |  |\n| 5 | Amounts from total column line 5, page 2 | 5 |  |\n| 6 | Applicable percentage | 6 | X .015 |\n| 7 | REFUNDABLE PROJECT FACILITY EXPENSE REBATE – Multiply Line 5 by Line 6. This amount will be reduced by rebates previously issued. | 7 |  |\n\nThis claim may be filed only after the project completion report is signed by the Board of Commerce and Industry. Complete page 2 with the total qualified expenditures for each year. Add totals and report on lines 1-7 above. Attach schedules that detail the qualified expenditure amounts reported on Lines 1, 2, 3, and 4 and copies of the fully executed Project Completion Report and the Quality Jobs contract.  \n\n| Has the company met minimum program job and payroll requirements in the third fiscal filing and maintained these requirements for every filing year thereafter included in this rebate claim? (Please note that for any year after the third fiscal filing in which the company does not maintain minimum program requirements, no benefits are allowed) . Mark one: YES NO |\n| --- |\n| If the answer is no, please identify the filing years in which the company did not meet minimum program requirements below. |\n\n\n| Declaration |  |\n| --- | --- |\n| I declare that to the best of my knowledge of all available information, this rebate claim is true and complete and complies with all statutes, rules and regulations, and any other policy pronouncements related to the Quality Jobs program. |  |\n| Signature of Officer, Owner or Other (for Other, attach Power of Attorney) | Date (mm/dd/yyyy) |\n| Name | Title |\n| Email Address | Telephone Number ((xxx) xxx-xxxx) |\n\nQJ-PFER  \nR-1092 (2/19)  \n\n| \u003Cbr>| Quality Jobs Project Facility Expense Rebate Claim | Mail both pages to:\u003Cbr>Taxpayer Compliance Division – SSEW Economic Development Unit\u003Cbr>P. O. Box 66362\u003Cbr>Baton Rouge, LA 70896-6362\u003Cbr>Phone: 225.219.2270\u003Cbr>Email: [LDR. TaxIncentives@LA.gov](LDR. TaxIncentives@LA.gov) |\n| --- | --- | --- |\n\n\n| LA Revenue Account Number |  | Project Contract No. |  |  | Date of Claim (mm/dd/yyyy) |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- |\n| Five Year Expenditures |  |  |  |  |  |  |  |\n|  | Description of\u003Cbr>Expenditure | Year 1 | Year 2 | Year 3 | Year 4 | Year 5 | Total with Line\u003Cbr>1-5 |\n| 1 | Amounts classified as capital expenditures for federal income tax purposes that are related to the contract project and are placed in service from the beginning of construction until the date of project completion (Other related capitalized intangible expenditures such as architectural and engineering costs prior to construction are includible.) |  |  |  |  |  |  |\n| 2 | PLUS: Amounts that would have been capitalized but for exclusions from capitalization as provided in IRC §263(a)(1)(A)–(L) |  |  |  |  |  |  |\n| 3 | LESS: The capitalized cost of land, land l","cbCaimVzBavZCKE4","https://ap.wps.com/l/cbCaimVzBavZCKE4","pdf",216773,"English","# Claim Filing Information\n## Taxpayer and Project Details\n## Qualified Expenditure Calculations\n## Compliance Declaration and Signature","[{\"question\":\"When can the rebate claim be filed?\",\"answer\":\"The claim may be filed only after the project completion report is signed by the Board of Commerce and Industry.\"},{\"question\":\"How is the refundable project facility expense rebate calculated?\",\"answer\":\"Multiply Line 5 by Line 6 (applicable percentage). The resulting amount will be reduced by rebates previously issued.\"},{\"question\":\"What information must be completed on page 2?\",\"answer\":\"Complete page 2 with total qualified expenditures for each year, add totals for lines 1–7, and attach supporting schedules and copies of the fully executed Project Completion Report and Quality Jobs contract.\"}]","R-1092 (2/19) - Quality Jobs Project Facility Expense Rebate Claim - Louisiana | PDF",1789800587]