[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-242212-105":53,"doc-detail-242212-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","quote-request-electrical-services-request-for-quote-no-2-22-pdh","Quote-Request - Electrical Services - Request for Quote No 2-22 PDH","","Request for Quotation (RFQ) from Portland District Health (PDH) for the provision of electrical services from 1 June 2022 to 30 May 2024, with an option to extend for 12 months. The RFQ sets out scope and delivery expectations for ad hoc electrical works, including contractor qualifications, licensing, required response to emergency callouts, and rules for work request handling. It also details contract terms, price variation constraints, insurance requirements, and warranty obligations, including coverage and latent defect corrections.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/quote-request-electrical-services-request-for-quote-no-2-22-pdh/242212/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/quote-request-electrical-services-request-for-quote-no-2-22-pdh/242212.png","ImageObject",442,249,{"name":88,"@type":89},"River Wang","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-12","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",13,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What is the contract term for the electrical services RFQ?","Question",{"text":109,"@type":110},"The term runs from 01 June 2022 to 30 May 2024. An option to extend for 12 months may be activated by PDH under defined prerequisites.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"How are emergency callouts handled under this RFQ?",{"text":114,"@type":110},"Emergency callouts are normally directed by telephone and followed up by a purchase order within 24 hours. The contractor must respond according to the agreed response time.",{"name":116,"@type":107,"acceptedAnswer":117},"What insurance must the contractor provide?",{"text":118,"@type":110},"The contractor must provide public and product liability insurance (at least $10 million per occurrence, unlimited aggregate for public liability, and limited annual aggregate for products). It must also provide motor vehicle third party insurance and comply with compulsory third party insurance requirements.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},242212,1790683427,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":136,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":61,"update_tm":141,"read_time":79},1099514067438,"https://ap-avatar.wpscdn.com/avatar/100002539ee87300030?x-image-process=image/resize,m_fixed,w_180,h_180&k=1780474512215547542","REQUEST FOR QUOTATION  \nPROVISION OF:  \nELECTRICAL SERVICES  \nTERM OF CONTRACT:  \n01 JUNE 2022 TO 30 MAY 2024  \n(OPTION TO EXTEND FOR 12 MONTHS)  \nRequest for Quote No: 02-22 PDH  \nDate issued: 07 February 2022  \nRequested by: Kevin McMahon, Building Service Supervisor Portland District Health  \n141 – 151 Bentinck Street, PORLAND VIC 3305 [Email:](Email: corporate.pdh@swarh.vic.gov.au)[ ](Email: corporate.pdh@swarh.vic.gov.au)[corporate.pdh@swarh.vic.gov.au](Email: corporate.pdh@swarh.vic.gov.au)  \n[PH: 03](PH: 03) ) 5521 0313  \nCLOSING DATE: 04 March 2022 @ 2PM  \nPortland District Health (PDH) is a leading Victorian regional hospital, located in Portland, in the Glenelg Shire. PDH provides acute, aged care and community based services to the Portland District community. PDH has an operating budget of around $24 .4m and employs approximately 435 staff (260 EFT) .  \nThis Request for Quote (RFQ) is for the provision of ad hoc:  \ni. Electrical services  \nGOOD AND SERVICES  \nPortland District Health is seeking a suitable qualified and experienced supplier to supply the organisation with the provision of Electrical services.  \nPlease provide a quotation for the following goods/services as detailed below: the submission is to include all relevant documentation as requested.  \nScope of the Service  \nPDH uses a team of in-house trade staff. Initially work requests initiated by PDH will be sent to PDH’s maintenance department for rectification. Work requests which may not be able to be attended to by PDH within a reasonable time or are not necessarily aligned to the skill or equipment requirements of PDH and its staff will be forwarded through to the contractor(s) .  \nAll contractor staff (including sub-contractors) are expected to be qualified and trained to industry standard(s) for any works it undertakes at PDH sites. The contractor should also possess all appropriate licenses and registrations to ensure that services/good are delivered in accordance with the relevant standards.  \nUnless otherwise indicated and agreed to, the following category of hours shall apply to the agreement:  \n􀁸 Normal Business Hours: Monday to Friday, 7:30am – 5:00pm and Saturday 9:00am – 1:00pm.  \n􀁸 After Hours: all other times.  \n􀁸 Public Holidays: all gazetted public holidays in Portland.  \nWork requests  \nThis includes the completion of all site-generated work requests that will not be attended to by PDH directly. Both labour and materials will need to be supplied to complete these work requests. The work request will include details of the works to be undertaken, the location of all works and the expected time frame for attending to the works. The contractor should advise PDH immediately if it will be unable to meet the requirements set out in the works request.  \nEmergency callouts  \nDue to the nature of these requests, these requests will normally be directed to the contractor by telephone and followed up by a purchase order within a twenty four hour period (one business day) . Emergency callouts will need to be responded to as per the agreed response time.  \nProject work  \nWork involved with projects are NOT covered by this agreement. Any project work undertaken will be treated as a separate undertaking and will be quoted prior to work commencing.  \nPlease Note: Portland District Health reserves the right to utilise the services of any contracting company it nominates to carry out/perform these requirements.  \nPORTLAND DISTRICT HEALTH CONTRACT DETAILS:  \nCustomer  \nThe Customer will be Portland District Health in the contract regarding the supply of goods and / or services.  \nThe Term of the Contract  \nPDH will notify the successful contractor for the supply of goods and / or services formally by letter. The contract commencement date will be the dated letter. The contract will be for an initial period of two years. This period can be extended by the option period, which can include one x 12-month term. The option period can only be activated by PDH","cbCaikNQ0SHF0xzw","https://ap.wps.com/l/cbCaikNQ0SHF0xzw","pdf",716639,10,"English","# Request for Quote Details\n## Contract Term and Extension Option\n## Closing Date and Submission Requirements\n# Scope of Services\n## Work Requests and Emergency Callouts\n## Project Work Exclusion\n# Contract Requirements\n## Contractor Licensing and Qualifications\n## Price Variation Policy\n## Insurance and Liability\n## Warranties\n## PDH Policies and Procedures","[{\"question\":\"What is the contract term for the electrical services RFQ?\",\"answer\":\"The term runs from 01 June 2022 to 30 May 2024. An option to extend for 12 months may be activated by PDH under defined prerequisites.\"},{\"question\":\"How are emergency callouts handled under this RFQ?\",\"answer\":\"Emergency callouts are normally directed by telephone and followed up by a purchase order within 24 hours. The contractor must respond according to the agreed response time.\"},{\"question\":\"What insurance must the contractor provide?\",\"answer\":\"The contractor must provide public and product liability insurance (at least $10 million per occurrence, unlimited aggregate for public liability, and limited annual aggregate for products). It must also provide motor vehicle third party insurance and comply with compulsory third party insurance requirements.\"}]","Quote-Request - Electrical Services - Request for Quote No 2-22 PDH | PDF",1789187948]