[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-245694-105":53,"doc-detail-245694-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","quotation-for-example-bathroom-renovation","QUOTATION FOR EXAMPLE BATHROOM RENOVATION","","Quotation prepared for a bathroom renovation project at PEGASUS Design-To-Build, proposing repairs and improvements to the existing second-floor bathroom. The scope covers general conditions, project management, sitework protection and cleanup, full bathroom demolition, framing modifications, and detailed plumbing, electrical, insulation, plaster, finish carpentry, tile installation, interior painting, and final site cleanup. Pricing includes an allowance schedule and a final estimated amount of $17,104, with validity stated for 90 days.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":21,"@type":70,"position":76},"https://docshare.wps.com/template/invoices/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/quotation-for-example-bathroom-renovation/245694/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/quotation-for-example-bathroom-renovation/245694.png","ImageObject",442,249,{"name":88,"@type":89},"McQueen","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-16","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",7,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What is the final estimated amount for the bathroom renovation?","Question",{"text":109,"@type":110},"The quotation states a final estimated amount of $17,104.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"How long is the quotation valid?",{"text":114,"@type":110},"The quotation is valid for 90 days from 12/21/10.",{"name":116,"@type":107,"acceptedAnswer":117},"What main work phases are included in the renovation scope?",{"text":118,"@type":110},"The scope includes general conditions and project management, sitework, full bathroom demolition to studs, framing changes, plumbing and electrical installation, insulation and plaster, finish carpentry, cabinetry, tile, interior painting, and final cleanup.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},245694,1790286021,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":20,"category_name":21,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":136,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":61,"update_tm":141,"read_time":73},5909890329169,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","QUOTATION FOR EXAMPLE BATHROOM RENOVATION  \nPrepared For:  \nPEGASUS Client 99 Washington St Melrose, MA 02176  \nQuotation valid for 90 from:  \n12/21/10  \nPEGASUS Design-To-Build is pleased to have the opportunity to prepare this quotation for you. We hereby propose to complete repairs and improvements shown below. These figures are within a reasonable range for a project of this nature; however the final construction amount can vary beyond these figures based on client selections, and further evaluation of existing structural and mechanical conditions. The following sections are included as reference for this quotation:  \nFull renovation of existing second floor bathroom  \nScope of Work-Description of all work to be performed, broken out by job phase  \nAllowance Schedule-List of labor and material labor amounts. These are priced at an average-to-high grade of materials and normal subcontractor labor charges.  \nPricing Summary-Provides a cost breakdown for the project by category.  \nFinal Estimated Amount- $17,104  \nSubmitted by:  \nGeoffrey Shafer  \nPEGASUS Design-To-Build LLC  \nPEGASUS DESIGN-TO-BUILD LLC, 99 WASHINGTON STREET, MELROSE, MA 01276 781.662.1593 WWW.PEGDESIGN.NET HIC\\# 137663  \nSCOPE OF WORK  \nPhase Description  \nGeneral Conditions  \nAll permitting and inspection fees for the project are included.  \nProject Management:  \nProject manager will be assigned to job  \nPrepare job folder with all plans, details and specifications  \nDaily job status communications  \nScheduled project walk-through meetings  \nSetup project web site for project scheduling, documents and contacts  \nSitework  \nJob Site Preparation:  \nDust isolation and temporary walls as required for safety  \nInstall temporary doors and zip walls to control job access  \nProtect any finish flooring with rosin paper and hardboard  \nSite will be left broom clean each day  \nA dumpster will be placed on site for the entire project for all debris removal  \nAll Demolition for Bathroom:  \nDisconnect bath fixtures and electrical as required for demolition Remove cabinetry and other finish as required  \nDemolish existing bathroom to studs  \nRemove any fixtures / appliances  \nStrip ceiling to strapping  \nDemolish all walls to studs  \nRemove all nails and clean joist bays  \nRemove finish flooring  \nSweep / vacuum  \nRemove sub floor as required to route new plumbing  \nFraming  \nInterior wall framing for Bathroom:  \nRelocate wall into bedroom to make room for tub Remove and replace sub floor as required for new plumbing Frame partition walls for shower / tub  \nInstall all blocking and nailers as required  \nPEGASUS DESIGN-TO-BUILD LLC, 99 WASHINGTON STREET, MELROSE, MA 01276 781.662.1593 WWW.PEGDESIGN.NET HIC\\# 137663  \nPAGE 2 OF 6  \nPlumbing  \nInstall toilet: 1.0  \nInstall toilet drain and install new flange  \nInstall new supply line (service stop & supply tube in chrome finish) Install toilet  \nAlcove tub  \nRough in and supply for new alcove tub  \nTie into existing vent  \nInstall Americast 5' tub  \nInstall shower valve / diverter  \nInstall new vanity sink: 1.0  \nRough in waste and supply lines for vanity sink  \nTie into existing vent  \nInstall new sink and faucet  \nElectrical  \nProvide all electrical required for project  \nDisconnect and re-work existing wiring as required  \nOwner to provide all decorative fixtures  \nSupply and install Panasonic fan/light combo 1.0  \nWire for vanity light 1.0  \nInstall new dedicated 20amp circuit for GFCI 1.0  \nSupply and install 1.0 5\" Juno Recessed Light with White Baffle HVAC  \nVent bathroom fan to exterior, using existing vent if possible 1.0  \nExisting heat to remain as is Insulation  \nAll Insulation and air / fire stopping for new construction Insulate around all new doors and windows  \nInstall fire stopping rock wool and caulking at all openings/penetrations Sound proofing insulation can be added at owners request  \nFiberglass batt walls insulation rated at R13-70.0 sf Plaster  \nSmooth Plaster Finish:  \nInstall 1/2\" blue board (GWB)","cbCaijU84UZZev9b","https://ap.wps.com/l/cbCaijU84UZZev9b","pdf",57557,6,"English","# Scope of Work\n## General Conditions\n## Sitework\n## All Demolition for Bathroom\n## Framing\n## Plumbing\n## Electrical\n## Insulation\n## Plaster Finish\n## Finish Carpentry\n## Cabinetry\n## Tile\n## Paint-Interior\n## Final Cleanup\n# Allowance Schedule","[{\"question\":\"What is the final estimated amount for the bathroom renovation?\",\"answer\":\"The quotation states a final estimated amount of $17,104.\"},{\"question\":\"How long is the quotation valid?\",\"answer\":\"The quotation is valid for 90 days from 12/21/10.\"},{\"question\":\"What main work phases are included in the renovation scope?\",\"answer\":\"The scope includes general conditions and project management, sitework, full bathroom demolition to studs, framing changes, plumbing and electrical installation, insulation and plaster, finish carpentry, cabinetry, tile, interior painting, and final cleanup.\"}]","QUOTATION FOR EXAMPLE BATHROOM RENOVATION | PDF",1789230530]